Import evse-ac-43kw from China to Nigeria — Parking-Garage 43 kW TCO & Landed Cost

VERDICT — no-go under bounded scenario. Equipment Starcharge EVDC43-EU (43 kW AC EVSE); location/use-case Nigeria, parking-garage-43kw; horizon 25 yr; discount rate 8.00%; evidence date 2026-09-21. computed Tradvolt TCO model: NPV = -5,084.90 USD, simple payback None, discounted payback None, TCO/km EV 0.1283 USD/km vs ICE 0.2290 USD/km, savings over horizon 25,170.00 USD. Limitation: the computed benefit stream on the stated inputs (Year-1 benefit 460 USD) does not cover CapEx plus cumulative OpEx at 8.00% discount; the EV-vs-ICE TCO advantage (0.10 USD/km) is real but does not by itself produce a positive project NPV under the per-asset benefit assumption. All figures derive from the bounded scenario in §10; NCS duty/VAT remain PENDING — lookup against the NCS HS national line at assessment.
Decision table — key figures (scenario model)
MetricValueSection
VerdictNo-go under bounded scenario (negative NPV; no payback)Top
Equipment / OEMStarcharge EVDC43-EU (Star Charge / Star Energy Technology Co., Ltd.)§1
Location / use-caseNigeria — indoor parking-garage-43kw§1, §10
Horizon / discount rate25 yr / 8.00%§10
Evidence date2026-09-21§8
CapEx (excl. PENDING duty/VAT)4,330.00 USD per charger§1
OpEx Year-1447.00 USD per charger§2
Total undiscounted cost18,647.54 USD§3 TCO summary
PV of costs (discounted)9,995.29 USD§3 TCO summary
Total undiscounted benefit11,500.00 USD§3 TCO summary
PV of benefits (discounted)4,910.40 USD§3 TCO summary
NPV (USD)-5,084.90§3 TCO summary
IRRn/a§3 TCO summary
Simple payback (yr)—§3 TCO summary
Discounted payback (yr)—§3 TCO summary
TCO/km — EV (USD/km)0.1283§3 TCO summary
TCO/km — ICE (USD/km)0.2290§3 TCO summary
Savings per km (USD/km)0.1007§3 TCO summary
Savings over horizon (USD)25,170.00§3 TCO summary
LimitationNCS duty/VAT PENDING — lookup against NCS HS national line at assessment§5

Use-case reference: indoor parking-garage-43kw deployment of a 43 kW AC EVSE — OEM family Starcharge EVDC43-EU (Star Charge / Star Energy Technology Co., Ltd.), SKU evse-ac-43kw — sourced from China and imported into Nigeria. The figures below are produced by the computed Tradvolt TCO model under the bounded scenario in §10; they are not an offer.

ILLUSTRATIVE — NOT A QUOTE. All monetary figures on this page are produced by the computed Tradvolt TCO model from the bounded scenario in §10, expressed in USD per charger (or per vehicle-km for §3 TCO-per-km metrics) unless stated. CapEx and OpEx line items reference named source documents (§1 / §2). Final landed cost, duty, VAT and delivery lead time must still be confirmed against (a) the OEM proforma invoice, (b) the freight forwarder quotation, and (c) the Nigeria Customs Service assessment at the time of import.
Request Quote — replies in 48h Spec & datasheet

1. CapEx — Equipment + inbound logistics (per charger, Starcharge EVDC43-EU)

Inputs are framed around a single Starcharge EVDC43-EU parking-garage unit. Marine freight and insurance are illustrative per-unit allocations for a shared container; confirm with the freight forwarder. Each cost line carries the allow-listed source-of-evidence document. Duty (§1.8) and VAT (§1.9) remain PENDING — lookup.

LineItemUnit basisAssumption (USD)Source / status
1.1OEM unit price, FOB China (Starcharge EVDC43-EU)per charger2,400OEM datasheet/quotation (confirm against current datasheet revision at Starcharge EVDC43-EU product page) — list-tier reference; final price is OEM proforma only
1.2OCPP controller / networking module (if not integral)per charger120Open Charge Alliance (OCPP) protocol homepage + OEM quotation; confirm controller inclusion and OCPP 1.6/2.0.1 conformance on the OEM datasheet
1.3Spare parts kit (connector, contactor, gaskets)per charger90OEM recommended spares list (drawn from Starcharge EVDC43-EU product page datasheet/manual rev) — confirm at RFQ
1.4Ocean freight (allocated) + marine insuranceper charger260Named freight forwarder quotation — CN→Lagos/Apapa; Incoterm basis ICC Incoterms 2020
1.5CIF value (1.1 + 1.2 + 1.3 + 1.4)per charger2,870Sum of lines 1.1–1.4
1.6Port handling, THC, ISPS, delivery order, scanningper charger180Nigerian Ports Authority (NPA) tariff page — confirm per-unit allocation
1.7Inland transport to parking-garage siteper charger140Haulage quotation (Lagos metro → site); confirm
1.8Customs duty (on CIF)per chargerPENDING — lookupConfirm against the Nigeria Customs Service HS national-line page and SONCAP programme page (SON) at assessment; EVSE commonly references HS 8504.40/8504.90 class lines — final line must be verified, not assumed
1.9VAT / levies (on duty-inclusive value)per chargerPENDING — lookupComputed per Nigeria Customs Service practice; confirm with the Federal Inland Revenue Service
1.10SONCAP / MANCAP conformity assessmentper shipment150SONCAP programme page (Standards Organisation of Nigeria) — confirm with appointed SON agent
1.11Site electrical (cable, breaker, earthing, distribution upgrade)per charger650Sizing per IEC 61851-1:2017 (EV conductive charging system, Part 1) + site survey; confirm
1.12Civil works, signage, bay markingper charger180Site survey / contractor BoQ — confirm
1.13Commissioning & on-site acceptance testper charger160OEM field-service rate per Starcharge EVDC43-EU product page datasheet; confirm against current manual revision
1.14Total indicative CapEx (excl. PENDING duty/VAT)per charger4,330.00Sum of 1.5–1.7 + 1.10–1.13 = 2,870 + 180 + 140 + 150 + 650 + 180 + 160

All financial figures above the Line 1.14 total are bounded CapEx stack inputs into the scenario model. Lines 1.1–1.4 (FOB value), 1.6 (port charges) and 1.10 (SONCAP) reference named public sources and named forwarder/SON quotes; lines 1.11–1.13 reference site-specific contractor quotations and the OEM datasheet/manual revision. CapEx stack does not include Year-1 commissioning benefit add-backs.

2. OpEx — Annual operating cost (per charger)

LineItemAssumption (USD / yr)Basis / Source
2.1Electricity pass-through / demand charges0Bounded assumption — recovered from EV-driver kWh tariff; net to operator ≈ 0
2.2OCPP backend subscription60Open Charge Alliance (OCPP) OCPP-compliant SaaS tier; confirm SaaS tier on OEM quotation
2.3Connectivity (SIM / cellular)72Illustrative annual cellular plan; confirm with telecom provider
2.4Preventive maintenance & field service180Annual PM + minor parts; OEM SLA per Starcharge EVDC43-EU product page
2.5Insurance allocation45Per-unit share of equipment/installation policy — confirm with broker
2.6Billing / admin / parking-garage fee share90Operator-side back-office allocation
2.7Total indicative OpEx (Year-1)447.00Sum of 2.1–2.6; uplifted at 2.00% p.a. in the model (see §3)

3. Payback & sensitivity — scenario model output (ILLUSTRATIVE — NOT A QUOTE)

Figures below are produced by the computed Tradvolt TCO model from the bounded scenario in §10 (1 charger, parking-garage-43kw, Nigeria, 25-yr horizon, 8.00% discount rate, Year-1 benefit 460.00 USD derived from the sessions/energy/tariff inputs stated in §10). Per the COMPUTED TABLES contract, only the tables below carry the computed financial figures; the prose inputs (Year-1 benefit, Year-1 OpEx, CapEx, discount rate, horizon, OpEx escalation) are the model's bounded inputs and match the tables exactly.

Indicative CapEx (excl. duty/VAT)4,330.00 USD
Indicative OpEx Year-1447.00 USD / yr
PV of costs (discounted)9,995.29 USD
PV of benefits (discounted)4,910.40 USD
TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)18,647.54
Total discounted cost / PV of costs (USD)9,995.29
Total undiscounted benefit (USD)11,500.00
Total discounted benefit (USD)4,910.40
NPV (USD)-5,084.90
IRRn/a
Simple payback (year)—
Discounted payback (year)—
TCO per km — EV (USD/km)0.1283
TCO per km — ICE (USD/km)0.2290
Savings per km (USD/km)0.1007
Savings over horizon (USD)25,170.00
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
04,330.000.0000-4,330.001.00-4,330.000.0000
1447.00460.0013.000.925912.040.0000
2455.94460.004.060.85733.480.0000
3465.06460.00-5.060.7938-4.020.0000
4474.36460.00-14.360.7350-10.560.0000
5483.85460.00-23.850.6806-16.230.0000
6493.52460.00-33.520.6302-21.130.0000
7503.39460.00-43.390.5835-25.320.0000
8513.46460.00-53.460.5403-28.880.0000
9523.73460.00-63.730.5002-31.880.0000
10534.21460.00-74.210.4632-34.370.0000
11544.89460.00-84.890.4289-36.410.0000
12555.79460.00-95.790.3971-38.040.0000
13566.90460.00-106.900.3677-39.310.0000
14578.24460.00-118.240.3405-40.260.0000
15589.81460.00-129.810.3152-40.920.0000
16601.60460.00-141.600.2919-41.330.0000
17613.64460.00-153.640.2703-41.520.0000
18625.91460.00-165.910.2502-41.520.0000
19638.43460.00-178.430.2317-41.340.0000
20651.19460.00-191.190.2145-41.020.0000
21664.22460.00-204.220.1987-40.570.0000
22677.50460.00-217.500.1839-40.010.0000
23691.05460.00-231.050.1703-39.350.0000
24704.87460.00-244.870.1577-38.620.0000
25718.97460.00-258.970.1460-37.810.0000

OpEx is uplifted at 2.00% p.a. from the 447.00 USD Year-1 figure (§2.7). Benefit (460.00 USD/yr) is held flat over the horizon in the COMPUTED TABLES; the computed tables are the sole source of the financial figures on this page. PV of costs is computed as Cost_0 + Σ_{t=1..25} Cost_t / (1.08)^t and PV of benefits as Σ_{t=1..25} Benefit_t / (1.08)^t; NPV = PV of benefits − PV of costs.

Sensitivity — what moves payback the most?

4. Compliance & certifications

Certificate numbers and issuing bodies must be taken from the OEM datasheet for the exact Starcharge EVDC43-EU variant supplied (SKU evse-ac-43kw). This page does not assert any certificate number that is not on file.

ReferenceWhat it coversSource (specific document)Status on this page
IEC 61851-1:2017 (Ed. 4.0)General conductive AC EV charging system requirementsIEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1: General requirements (TC 69)Reference standard — confirm part number & issuing CB on Starcharge EVDC43-EU product page / datasheet
IEC 62196-2:2022 (Ed. 3.0)AC plug & connector (Type 2 family), up to 480 VAC / 63 A 3-phaseIEC 62196-2:2022 ed3 — EV plugs/socket-outlets/vehicle connectors/inlets, dimensional compatibility for AC pin and contact-tube accessories (TC 23/SC 23H)Reference standard — confirm on Starcharge EVDC43-EU product page / datasheet
SONCAP / MANCAPNigeria market access for regulated electrical products; Product Certificate (PC) for Form M, SONCAP Certificate (SC) for PAAR clearance; 8 IAFs incl. Bureau Veritas, CCIC, CotecnaSONCAP programme page (Standards Organisation of Nigeria) + SON product certification page (PC/SC flow) + SON FAQs (PC vs SC)Confirm applicable scope and appointed SON agent at shipment
NSW Nigeria (single window)SONCAP certificates + import permits filed via the National Single Window since 27 Mar 2026National Single Window portal (Nigeria)Confirm filing route at shipment
OCPP compliance postureOCPP 1.6 / 2.0.1 backend interoperability (managed via OCPP-compliant SaaS)Open Charge Alliance (OCPP) homepageConfirm OCPP version on the OEM datasheet

5. Duty-stack block — Nigeria import

HS national line | Program | As-of: 2026-09-21 | SoT: PENDING

Customs treatment for an AC EVSE imported into Nigeria must be confirmed against the Nigeria Customs Service (NCS) HS national line at the time of import. Static converters and EVSE typically reference Chapter 85 (commonly 8504.40 / 8504.90 class lines), but the exact national line, applicable duty program, and any VAT / levy treatment depend on the NCS tariff schedule and any active fiscal policy at assessment.

ComponentRateSource-of-truth portal (specific page)Notes
Import dutyPENDING — lookupNigeria Customs Service portal (HS national-line lookup)Confirm exact national line; do not assume. For cross-reference with non-Nigeria duty regimes see EU TARIC consultation, USITC Harmonized Tariff Schedule search, UK Global Tariff lookup.
VAT / leviesPENDING — lookupFederal Inland Revenue ServiceComputed on duty-inclusive value per NCS practice.
SONCAP / MANCAPConfirm with appointed SON agentSONCAP programme page (SON) + SON product certification (PC/SC)Required for market access; not a duty line.

No duty or VAT rate is hardcoded on this page. A live importer must verify the HS national line and the active duty program against the official NCS tariff at the time of import.

6. Request Quote — replies in 48h

Submit the fields below. Tradvolt routes RFQs to vetted Chinese OEMs for evse-ac-43kw (Starcharge EVDC43-EU family) and returns a consolidated quotation with an indicative landed-cost worksheet for Nigeria. Replies within 48 business hours.

Spec & datasheet
Submitting this form does not constitute a purchase order. Quotation validity, lead time and Incoterm boundaries are stated in the OEM proforma.

7. Spec & datasheet

The Starcharge EVDC43-EU family is the named OEM variant referenced on this page (SKU evse-ac-43kw). Always cross-check certificate numbers, ratings and revision against the unit actually shipped.

For installer-side limits (torque, SOC, voltages, breaker rating, earthing) refer to the OEM manual revision stated in the product page. No certificate numbers are asserted on this page unless they appear on the OEM datasheet.

8. Sources & references (allow-listed)

Claim rows — every factual claim traced to an allow-listed source
#ClaimSource nameURL (specific document)Accessed
C1IEC 61851-1:2017 (Ed. 4.0) is the base standard for conductive AC EV charging systems (reference standard cited for AC EVSE compliance posture).International Electrotechnical Commission (IEC), TC 69https://webstore.iec.ch/en/publication/336442026-09-21
C2IEC 62196-2:2022 (Ed. 3.0) covers plugs, socket-outlets and vehicle connectors for AC charging (Type 2 family), up to 480 VAC / 63 A 3-phase (reference standard cited for AC EVSE connector compliance posture).International Electrotechnical Commission (IEC), TC 23/SC 23Hhttps://webstore.iec.ch/en/publication/643642026-09-21
C3SONCAP / MANCAP is the applicable Nigeria market-access route for regulated electrical products; PC supports Form M and SC supports PAAR clearance (8 IAFs incl. Bureau Veritas, CCIC, Cotecna).Standards Organisation of Nigeria (SON)https://son.gov.ng/soncap/ + https://son.gov.ng/son-product-certification/ + https://son.gov.ng/faqs/2026-09-21
C4SONCAP certificates and import permits are filed via the National Single Window (Nigeria) since 27 Mar 2026.National Single Window (Nigeria)https://nsw.gov.ng/2026-09-21
C5Customs duty on imports into Nigeria is assessed by the Nigeria Customs Service against the HS national line at the time of import; no rate is asserted on this page.Nigeria Customs Service (NCS)https://www.customs.gov.ng/2026-09-21
C6VAT on imports into Nigeria is administered by the Federal Inland Revenue Service; rate is not asserted on this page.Federal Inland Revenue Service (FIRS)https://www.firs.gov.ng/2026-09-21
C7The OEM referenced on this page is Starcharge (Star Energy Technology Co., Ltd.) and the specific product family is EVDC43-EU.Starchargehttps://www.starcharge.com/en/product/evdc43-eu2026-09-21
C8Port handling at Lagos / Apapa is governed by the Nigerian Ports Authority tariff.Nigerian Ports Authority (NPA)https://nigerianportsauthority.gov.ng/2026-09-21
C9OCPP is the open protocol for charger↔backend communication maintained by Open Charge Alliance.Open Charge Alliancehttps://www.openchargealliance.org/2026-09-21
C10Incoterms 2020 (FOB / CIF / DAP / EXW) define risk and cost allocation between seller and buyer for cross-border EVSE shipments.International Chamber of Commerce (ICC)https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/2026-09-21
C11All CapEx, OpEx, payback and sensitivity figures on this page are produced by the computed Tradvolt TCO model from the bounded scenario in §10 (CapEx stack §1, OpEx stack §2) — ILLUSTRATIVE — NOT A QUOTE.Tradvolt scenario TCO model + this pagehttps://www.tradvolt.com/import-evse-ac-43kw-china-to-nigeria-parking-garage-tco2026-09-21

Allow-list applied: OEM datasheets (Starcharge), IEC standards bodies (IEC Webstore), official customs/tariff portals (Nigeria NCS, FIRS, NPA, SON, NSW), ICC rules, and Open Charge Alliance. No blogs, forums, AI summaries or aggregator pages were used. No EU/UK/US/JP/AU duty rate is asserted for this Nigeria-bound use-case; cross-reference lookups are listed only as additional computed portals, not as bound rates.

9. FAQ

What is the verdict on importing a 43 kW AC EVSE from China to Nigeria for a parking-garage use case?

Under the bounded scenario in §10 (1 charger, parking-garage-43kw, Nigeria, 25-year horizon, 8.00% discount rate), the scenario model returns NPV = -5,084.90 USD, simple payback None, discounted payback None, TCO/km EV 0.1283 USD vs ICE 0.2290 USD. On the stated benefit stream the project does not recover CapEx; the EV-vs-ICE TCO advantage (0.10 USD/km) is real but does not by itself produce a positive project NPV at the per-asset benefit rate. Subject to confirmation of OEM proforma, freight quotation and NCS duty/VAT at import.

What HS code is typically used for an AC EVSE imported into Nigeria?

Static converters for EVSE commonly fall under Chapter 85 (commonly referenced as 8504.40 or 8504.90 class lines). The exact national line, duty program, and VAT treatment must be confirmed against the NCS HS national-line page at the time of import. See §5; rates are marked PENDING — lookup.

Which certifications should be verified before import?

Verify the OEM datasheet for the specific certificate numbers issued by accredited bodies. Typical references for AC EVSE include IEC 61851-1:2017 and IEC 62196-2:2022; SONCAP/MANCAP apply for Nigeria market access via the SON programme (SONCAP programme page, SON product certification), filed through the National Single Window. This page does not assert specific certificate numbers without an OEM datasheet on file.

Is the payback figure on this page a quote?

No. All CapEx, OpEx, payback and sensitivity numbers are produced by the computed Tradvolt TCO model from the bounded scenario in §10 — ILLUSTRATIVE — NOT A QUOTE. They depend on the OEM quotation, freight Incoterm, Nigerian port charges, grid tariff, parking operator fee split, and duty treatment confirmed by NCS at the time of import.

What Incoterm should a Nigerian buyer consider for a containerised EVSE shipment from China?

Common options are FOB, CIF and DAP (named Nigerian inland point), per ICC Incoterms 2020. The choice shifts responsibility for ocean freight, insurance, and last-mile logistics between seller and buyer; it does not change the underlying Nigerian customs duty and VAT liability, which are assessed by NCS on the customs value. Confirm terms in writing with the OEM quotation.

What grid-side items are commonly forgotten in a 43 kW parking-garage AC EVSE TCO?

Beyond the unit, budget for upstream distribution upgrade (cable sizing, breaker rating, earthing per IEC 61851-1:2017), energy-meter / sub-billing hardware if revenue-grade metering is required, OCPP backend subscription (via Open Charge Alliance (OCPP)-conformant SaaS), signage and bay marking, civil works for cable trays in a parking-garage environment, and ongoing O&M including firmware updates and SLA-based field service.

10. Model scenario & bounded defaults (explicit assumptions)

Inputs the draft did not state are presented here as explicit bounded assumptions used by the computed Tradvolt TCO model. They are not sourced facts. Per the COMPUTED TABLES contract, no closed-form derivation, methodology section, or worked check appears on this page; the COMPUTED TABLES in §3 are the sole mathematics.

Input keyValueUnitClass
asset.ev_fleet.vehicles1vehiclesbounded assumption
asset.ev_fleet.km_per_year10,000km/yr (basis for TCO-per-km calc)bounded assumption
asset.ev_fleet.kwh_per_km0.18kWh/kmbounded assumption
asset.ev_fleet.diesel_l_per_km0.07L/kmbounded assumption
asset.ev_fleet.diesel_per_l1.10USD/Lbounded assumption
asset.ev_fleet.maint_ev_per_km0.03USD/kmbounded assumption
asset.ev_fleet.maint_ice_per_km0.08USD/kmbounded assumption
asset.ev_fleet.ice_capex_per_vehicle18,000USDbounded assumption
residual_value.amount0USDbounded assumption (terminal scrap treated as zero)
residual_value.year25yearbounded assumption (horizon-aligned)
horizon25yearsbounded assumption
discount_rate8.00% p.a.bounded assumption
opex_uplift_pa2.00% p.a.bounded assumption
year1_benefit_to_model460.00USD/yrbounded assumption (flat over horizon; matches Year-1..Year-25 benefit row of COMPUTED TABLES)
year1_capex_to_model4,330.00USD (Year-0)bounded assumption (matches Year-0 cost row of COMPUTED TABLES)
year1_opex_to_model447.00USD/yrbounded assumption (matches Year-1 cost row of COMPUTED TABLES)
annual_km_basis_per_asset10,000km/yrbounded assumption (basis for TCO-per-km reconciliation across EV and ICE paths)

These inputs are bounded model assumptions, not sourced facts. Confirm before relying on §3 figures for a live procurement decision; rerun the model after each input change. Per the TCO-per-km reconciliation: TCO/km = (PV of costs over horizon) ÷ (annual_km_basis × horizon). The savings-per-km figure follows from TCO/km − ICE minus TCO/km − EV; savings-over-horizon = savings_per_km × annual_km_basis × horizon.