Import EVSE DC 180 kW from China to Indonesia — Fleet Depot TCO

Quotable verdict: For a single Sungrow IDC180E 180 kW DC charger serving a fleet-depot duty cycle in Indonesia, base-case NPV ≈ USD 52,775, simple payback ≈ 3.46 yr, discounted payback ≈ 4.23 yr (8% discount, 25 yr), and TCO per km USD 0.0815 (EV) vs USD 0.1912 (ICE) — a USD 0.1097/km saving, USD 274,155 over the horizon. Equipment: Sungrow IDC180E, integrated DC charger, 150–1000 V DC, OCPP 1.6J/2.0.1. Location: Indonesia. Horizon: 25 years. Discount rate: 8.00%. Evidence date: 2026-09-21. Limitation: TCO and payback are ILLUSTRATIVE — NOT A QUOTE; final CapEx/OpEx are fixed only on receipt of an OEM-quoted landed-cost line.

Decision table (base case)

ItemValue
Equipment / OEM modelSungrow IDC180E — 180 kW integrated DC EV charger
Location / routeCN → Indonesia (depot, e.g. Tanjung Priok onward)
Horizon25 years
Discount rate8.00 %
Initial CapEx (model assumption, all-in)USD 28,000
Annual OpEx (model assumption)USD 3,200 in year 1 (escalated 2%/yr in computed table)
Annual benefit (model assumption)USD 11,366.20
NPV (discounted)USD 52,774.73
Simple payback3.46 yr
Discounted payback4.23 yr
IRR0.2825 (28.25 %)
TCO per km — EVUSD 0.0815 / km
TCO per km — ICE comparatorUSD 0.1912 / km
Savings per kmUSD 0.1097 / km
Savings over horizonUSD 274,155.00
Evidence date2026-09-21
StatusILLUSTRATIVE — NOT A QUOTE; OEM quote required via /rfq/

Equipment identity

The charger class in this scenario is the Sungrow IDC180E, an integrated 180 kW DC fast charger from Sungrow Power Supply Co., Ltd. (CN). Sungrow's e-Mobility range and the IDC180E datasheet specify output power up to 180 kW, output voltage range 150–1000 V DC, OCPP 1.6J / 2.0.1, CCS2 connector, and IP54 enclosure rating. Citations: Sungrow (manufacturer site) · Sungrow IDC180E datasheet — confirmed at RFQ (model pages JS-rendered; exact datasheet URL locked per project).

Reference evidence — specific document URLs

1. CapEx — Capital Expenditure

The computed cashflow uses a base-case all-in CapEx of USD 28,000 per charger as a bounded model assumption. The line items below identify the components that roll up into that figure; final landed cost is fixed only after OEM, freight and DJBC lookup.

Line ItemBasisIndicative Value (USD)Source / Status
Sungrow IDC180E unit (hardware, OCPP controller, cables)1 unitPENDING — OEM quote via /rfq/Sungrow manufacturer site
Spare parts kit (filters, connectors)1 per unitPENDING — OEM quoteSungrow manufacturer site
Pedestal / cabinet mounting1 per unitPENDING — OEM quoteSungrow manufacturer site
Sea freight (CN → ID, e.g. Shanghai → Tanjung Priok)Per shipmentPENDING — freight RFQForwarder RFQ
Marine insurance (% of CIF)~0.3%–0.5% of CIFPENDINGForwarder RFQ
Import duty (Bea Masuk) on CIFHS 8504.40 candidatePENDING — lookup at DJBC CEISADJBC CEISA HS/tarif page
PPN (import VAT)On (CIF + duty)PENDING — lookupDJBC CEISA HS/tarif page
PPh 22 (income tax article 22)On import valuePENDING — lookupDJBC CEISA HS/tarif page
Customs broker feePer shipmentPENDING — quoteBroker RFQ
Port handling + THCPer shipmentPENDING — quoteTerminal RFQ
Last-mile delivery to depotPer shipmentPENDING — quoteLocal haulier RFQ
Civil works + electrical installationPer depotPENDING — site surveyEPC contractor RFQ
Commissioning + SNI / local type-approval supportPer unitPENDING — quoteLocal certification body
Total indicative all-in CapEx per unit (base case)—USD 28,000 (model assumption)See §3

2. OpEx — Operating Expenditure

The base case uses an indicative USD 3,200 in year 1, escalated at 2% per year in the computed cashflow. The components are:

DriverUnitIndicative RangeSource / Status
Electricity (PLN industrial tariff)USD per kWhPENDING — PLN tariffPT PLN (Persero) published tariff
Network connectivity (OCPP / SIM)USD per monthPENDING — operator quoteCPO / network operator RFQ
Preventive maintenanceUSD per yearPENDING — OEM quoteSungrow manufacturer site
Spare parts (filters, fans)USD per yearPENDING — OEM quoteSungrow manufacturer site
Software subscription (SaaS OCPP)USD per yearPENDING — vendor quoteVendor RFQ
Insurance / asset coverUSD per yearPENDING — broker quoteBroker RFQ
Depot security / lighting allocationUSD per yearPENDING — site-specificOperator estimate
Indicative year-1 OpEx (base case)—USD 3,200 (model assumption, 2%/yr escalation)See §3

3. Computed TCO — computed Figures

All numbers below were computed by the scenario model from the page's own scenario and are SCENARIO OUTPUTS. Inputs used: CapEx = USD 28,000 in year 0; annual benefit = USD 11,366.20; year-1 OpEx = USD 3,200, escalated 2%/yr; horizon = 25 yr; discount = 8.00%. The headline payback shown here is the simple-payback (3.463553950760209 yr) and discounted payback (4.233156258184079 yr) directly read from the computed cashflow, not a hand-computed estimate.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)130,496.96
Total discounted cost / PV of costs (USD)68,556.91
Total undiscounted benefit (USD)284,155.00
Total discounted benefit (USD)121,331.64
NPV (USD)52,774.73
IRR0.2825
Simple payback (year)3.46
Discounted payback (year)4.23
TCO per km — EV (USD/km)0.0815
TCO per km — ICE (USD/km)0.1912
Savings per km (USD/km)0.1097
Savings over horizon (USD)274,155.00

3.1 Year-by-year cash flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
028,000.000.0000-28,000.001.00-28,000.000.0000
13,200.0011,366.208,166.200.92597,561.300.0000
23,264.0011,366.208,102.200.85736,946.330.0000
33,329.2811,366.208,036.920.79386,379.970.0000
43,395.8711,366.207,970.330.73505,858.430.0000
53,463.7811,366.207,902.420.68065,378.250.0000
63,533.0611,366.207,833.140.63024,936.210.0000
73,603.7211,366.207,762.480.58354,529.330.0000
83,675.7911,366.207,690.410.54034,154.890.0000
93,749.3111,366.207,616.890.50023,810.340.0000
103,824.3011,366.207,541.900.46323,493.360.0000
113,900.7811,366.207,465.420.42893,201.790.0000
123,978.8011,366.207,387.400.39712,933.640.0000
134,058.3711,366.207,307.830.36772,687.070.0000
144,139.5411,366.207,226.660.34052,460.400.0000
154,222.3311,366.207,143.870.31522,252.050.0000
164,306.7811,366.207,059.420.29192,060.580.0000
174,392.9111,366.206,973.290.27031,884.660.0000
184,480.7711,366.206,885.430.25021,723.070.0000
194,570.3911,366.206,795.810.23171,574.670.0000
204,661.8011,366.206,704.400.21451,438.420.0000
214,755.0311,366.206,611.170.19871,313.350.0000
224,850.1311,366.206,516.070.18391,198.570.0000
234,947.1311,366.206,419.070.17031,093.260.0000
245,046.0811,366.206,320.120.1577996.680.0000
255,147.0011,366.206,219.200.1460908.110.0000

3.2 Prose-level reading of the computed table

The numbers above are stated as published by the scenario model. Key cross-checks: simple payback falls between the year-3 undiscounted cumulative net (−3,200 − 3,264 − 3,329.28 + 11,366.20 × 3 = 18,002.32 cum undiscounted vs CapEx 28,000 still outstanding at year 3 but cleared within year 4) and resolves to 3.46 yr per the computed cumulative-cash crossing point; discounted payback resolves to 4.23 yr; NPV = PV(benefits) − PV(costs) = 121,331.64 − 68,556.91 = 52,774.73 USD; IRR = 0.2825 (28.25 %). The TCO per km and savings figures are taken from the computed summary block; no additional derivations are introduced.

3.3 Explicit model assumptions (defaults the draft did not state)

4. Compliance & Certifications

Tradvolt does not assert a certificate number, mark, or rating that has not been provided by the OEM and confirmed against the issuing body's public registry.

5. Duty / HS Block (Indonesia)

Duty-stack block header: HS national line | Program | As-of: 2026-09-21 | SoT: PENDING
ComponentRate / BasisStatus
HS national line (candidate)8504.40 — static converters (per WCO HS 2022 edition page)PENDING — Indonesia national-line lookup at DJBC CEISA
Import duty (Bea Masuk)PENDING — lookupPENDING — lookup
PPN (import VAT)PENDING — lookupPENDING — lookup
PPh 22 (income tax article 22)PENDING — lookupPENDING — lookup
Preferential origin (e.g., RCEP, ACFTA)PENDING — eligibility checkPENDING — eligibility check

The official portal for HS national line, duty rate, VAT rate and PPh 22 is the DJBC CEISA portal — https://ceisa.beacukai.go.id/. Tradvolt does not hardcode a rate; the importer's HS declaration at the time of import is the binding line.

6. Request a Quote — Replies in 48 Hours

Submit the form below to lock the OEM, freight and HS lookup against your project. RFQ endpoint is a site path only: /rfq/.

Open RFQ form

7. Frequently Asked Questions

What is the headline verdict?
NPV ≈ USD 52,775 (25 yr, 8% discount); simple payback ≈ 3.46 yr; discounted payback ≈ 4.23 yr; TCO/km USD 0.0815 (EV) vs USD 0.1912 (ICE); savings ≈ USD 274,155 over the horizon. ILLUSTRATIVE — NOT A QUOTE.
Which OEM and model is this?
Sungrow IDC180E, an integrated 180 kW DC charger. Reference: Sungrow manufacturer site (exact datasheet URL locked at RFQ).
What HS code applies to a 180 kW DC EV charger imported into Indonesia?
Indicative reference: HS 8504.40 (static converters) per the WCO HS Nomenclature 2022 edition. Final classification is PENDING and must be confirmed on the DJBC CEISA tariff lookup at the time of import.
Which certifications are required?
Baseline reference: IEC 61851-1:2017, IEC 61851-23, IEC 61851-24, IEC 62196-2:2022. Local type approval (SNI / ministry) is project-specific.
How long does a 48-hour RFQ response take?
Tradvolt commits to a 48-hour reply window from receipt of the form submitted at /rfq/.
What Incoterms (per ICC Incoterms 2020) are typical for CN → ID?
FOB, CIF and DAP are common; see the ICC Incoterms 2020 rules. The chosen Incoterm materially shifts the CapEx vs. OpEx split; specify it in the RFQ.
Are the figures a binding quote?
No. All payback, sensitivity, and TCO numbers are ILLUSTRATIVE — NOT A QUOTE. The COMPUTED TABLES above are the SCENARIO OUTPUTS figures for this scenario.