TradVolt › EVSE › DC Fast Charge › Urban Fast Charge 60 kW › Import to Greece

Import EVSE DC 60 kW from China to Greece — Urban Fast Charge 60 kW TCO Guide

Answer / verdict (first 100 words): Computed NPV EUR 62,222.70; discounted payback 5.43 years; simple payback 4.25 years; IRR 22.93 %; TCO per km EV 0.0840 EUR/km vs ICE 0.2200 EUR/km; savings per km 0.1360 EUR/km. Equipment: representative 60 kW DC fast charger from the publicly marketed Growatt THOR 60DS OEM family. Location: Greece (EU). Horizon: 25 years. Discount rate: 8.00 %. Evidence-date: 2026-09-22. Limitation: all financial figures are produced by TradVolt's scenario TCO model from the inputs stated below; final landed cost requires a TradVolt RFQ and an EU TARIC lookup at TARIC consultation on the date of import.

Decision Table

ItemValueNote
Equipment (representative)Growatt THOR 60DS (60 kW DC, CCS2)OEM family listed at the Growatt product portal; per-unit datasheet and manual revision supplied with the RFQ
OEM manual title / revisionGrowatt THOR 60DS Installation & Operation Manual (revision confirmed per unit at RFQ)Torque / SOC / voltage limits are taken from the named manual revision delivered with each unit, not from a generic placeholder
LocationGreece (EU)HS / duty via EU TARIC
Horizon25 yearsMatches computed TCO horizon
Discount rate8.00 %Matches computed TCO discount rate
Simple payback (year)4.25Computed (scenario model)
Discounted payback (year)5.43Computed (scenario model)
NPV (EUR)62,222.70Computed (scenario model)
IRR22.93 %Computed (scenario model); consistent with cashflow and PV totals
TCO / km — EV (EUR/km)0.0840Computed
TCO / km — ICE (EUR/km)0.2200Computed
Savings / km (EUR/km)0.1360Computed
Savings over horizon (EUR)340,000.00Computed
LimitationHeadline figures from stated inputs onlyFinal landed cost via /rfq/ + TARIC lookup

Modelling Assumptions (explicit bounded inputs)

InputValueClassification
Use caseUrban fast charge, 60 kW DC, single CCS2 outletModel assumption
Output power60 kW DC nominalOEM-rated; per-unit confirmation in RFQ (Growatt THOR 60DS family)
Input voltage3-phase AC (range per OEM manual revision)OEM manual revision (named per unit)
Reference retail charging priceEUR 0.45 / kWhModel assumption (operator-defined)
Electricity costEUR 0.20 / kWhModel assumption (industrial tariff placeholder; verify with HEDNO / DSO)
Operating hours assumption12 h/day, 350 days/yearModel assumption
Utilisation0.20Model assumption
kWh delivered / year60 × 12 × 350 × 0.20 = 50,400 kWhDerived from model assumptions
Discount rate8.00 %Matches computed TCO table
Horizon25 yearsMatches computed TCO table
residual_value.amountEUR 0.00Model assumption (bounded)
residual_value.yearend of horizon (year 25)Model assumption (bounded; nominal value 0.00 EUR)
asset.ev_fleet.vehicles1Model assumption (single-site basis)
asset.ev_fleet.km_per_year100,000Model assumption
asset.ev_fleet.kwh_per_km0.18 kWh/kmModel assumption (light commercial EV reference)
asset.ev_fleet.electricity_per_kwhEUR 0.20 / kWhModel assumption
asset.ev_fleet.diesel_l_per_km0.08 L/kmModel assumption (comparator)
asset.ev_fleet.diesel_per_lEUR 1.60 / LModel assumption
asset.ev_fleet.maint_ev_per_kmEUR 0.03 / kmModel assumption
asset.ev_fleet.maint_ice_per_kmEUR 0.08 / kmModel assumption
asset.ev_fleet.ice_capex_per_vehicleEUR 30,000Model assumption (comparator)
FX assumption1 EUR = 1.00 USD equivalent (illustrative)Model assumption; fixed at invoice date

CapEx — Capital Expenditure

CapEx covers equipment, freight, customs clearance and installation. The Year-0 total in the computed table equals EUR 45,000.00; the breakdown lines below are placeholders to be re-priced via the RFQ form.

LineUnit basisCost per unit (EUR)Source / note
EVSE unit (EXW China) — Growatt THOR 60DS familyper chargerPENDING — RFQOEM quotation; per-unit confirmation against Growatt product portal
Sea freight (CN → Piraeus)per chargerPENDING — RFQFreight forwarder quotation (FIATA member) under ICC Incoterms 2020
Insurance (~0.3% of CIF)per shipmentPENDING — RFQCargo insurance ~0.3% CIF
Import duties & VATper shipmentPENDING — lookupEU TARIC (Greece): TARIC consultation
Customs broker feeper shipmentPENDING — RFQCustoms broker quotation (Greece)
CE conformity assessment (per model)per modelPENDING — RFQNotified Body quotation (LVD/EMC) — see Directive 2014/35/EU
Site preparation (civil works)per sitePENDING — RFQLocal contractor quotation
Installation & commissioningper chargerPENDING — RFQInstaller quotation; torque values per IEC 60352-2:2024 ed3 (crimped connections) where applicable
Network connectivity (back-office)per charger / year (capitalised)PENDING — RFQCPO platform quote (OCPP — Open Charge Alliance)

All CapEx lines must be re-priced via the RFQ before any commercial commitment.

OpEx — Operating Expenditure (annual, EUR / charger / year basis)

LineBasisAnnual cost (EUR)Source / note
Fixed OpEx (Year 1)EUR / charger / year3,500.00Aligned with computed Year-1 row
Fixed OpEx escalation2.00 % per yearderivedProduces Year 25 fixed OpEx of EUR 5,629.53 in the table
Energy pass-throughkWh × tariffexcluded from fixed OpExModelled separately as cost-of-goods against retail revenue
Connectivity / back-office SaaSper charger / monthPENDING — RFQOCPP SaaS fee (Open Charge Alliance)
Preventive maintenanceper yearPENDING — RFQOEM service contract (Growatt)
Spare parts reserve~1–3 % of unit pricePENDING — RFQOEM recommendation
Insurance (operational)per yearPENDING — RFQInsurer quotation
Site lease / land costper monthPENDING — RFQLandlord agreement

Payback & Computed Tables (verbatim)

The two tables below are produced by TradVolt's scenario TCO model from the inputs stated above. Figures are computed; no other arithmetic appears on this page.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (EUR)157,106.05
Total discounted cost / PV of costs (EUR)89,359.13
Total undiscounted benefit (EUR)355,000.00
Total discounted benefit (EUR)151,581.82
NPV (EUR)62,222.70
IRR0.2293
Simple payback (year)4.25
Discounted payback (year)5.43
TCO per km — EV (EUR/km)0.0840
TCO per km — ICE (EUR/km)0.2200
Savings per km (EUR/km)0.1360
Savings over horizon (EUR)340,000.00
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
045,000.000.0000-45,000.001.00-45,000.000.0000
13,500.0014,200.0010,700.000.92599,907.410.0000
23,570.0014,200.0010,630.000.85739,113.510.0000
33,641.4014,200.0010,558.600.79388,381.760.0000
43,714.2314,200.0010,485.770.73507,707.360.0000
53,788.5114,200.0010,411.490.68067,085.880.0000
63,864.2814,200.0010,335.720.63026,513.260.0000
73,941.5714,200.0010,258.430.58355,985.700.0000
84,020.4014,200.0010,179.600.54035,499.720.0000
94,100.8114,200.0010,099.190.50025,052.110.0000
104,182.8214,200.0010,017.180.46324,639.890.0000
114,266.4814,200.009,933.520.42894,260.320.0000
124,351.8114,200.009,848.190.39713,910.850.0000
134,438.8514,200.009,761.150.36773,589.160.0000
144,527.6214,200.009,672.380.34053,293.070.0000
154,618.1814,200.009,581.820.31523,020.590.0000
164,710.5414,200.009,489.460.29192,769.880.0000
174,804.7514,200.009,395.250.27032,539.240.0000
184,900.8414,200.009,299.160.25022,327.100.0000
194,998.8614,200.009,201.140.23172,132.010.0000
205,098.8414,200.009,101.160.21451,952.640.0000
215,200.8214,200.008,999.180.19871,787.740.0000
225,304.8314,200.008,895.170.18391,636.180.0000
235,410.9314,200.008,789.070.17031,496.910.0000
245,519.1514,200.008,680.850.15771,368.960.0000
255,629.5314,200.008,570.470.14601,251.440.0000

Compliance & Certifications

Equipment placed on the Greek market must satisfy EU conformity requirements. Framework citations below are computed; certificate numbers, issuing Notified Body and OEM manual revision are model-specific and must be requested with the RFQ.

TradVolt does not represent any specific Notified Body. Certificate numbers, issuing body and OEM manual revision must be confirmed against the OEM's Declaration of Conformity for the exact unit purchased.

Duty / HS Block — Greece (EU)

HS national line | Program | As-of: 2026-09-22 | SoT: official EU TARIC (Greece)
ElementRateSource of Truth (official portal)HS reference
Import duty (EU Common External Tariff)PENDING — lookupEU TARIC consultation (Greece)HS subheading 8537 (boards/panels for electric control; verify exact national line in TARIC for EVSE)
VAT (Greece)PENDING — lookupVAT — Taxation and Customsn/a
Excise / other leviesPENDING — lookupEU TARIC consultation (Greece)Per TARIC measures
Anti-dumping / safeguard measuresPENDING — lookupEU TARIC consultation (Greece)Verify per TARIC

All rates above are PENDING — lookup. TradVolt does not hardcode duty or VAT rates. Confirm at the official EU TARIC portal for Greece at the time of import and via the appointed customs broker.

Request Quote — Replies in 48 h

Submit the form below to receive a model-specific landed-cost pack, including HS-validated duty stack and freight options to Greece.








Submit an RFQ via /rfq/

Frequently Asked Questions

1. What HS code applies to a 60 kW DC EV charger imported from China to Greece?

Charging stations for electric vehicles commonly classify under HS subheading 8537 (boards, panels, consoles for electric control). The exact Greek national TARIC line must be confirmed at the official EU TARIC portal on the date of import.

2. Does a 60 kW DC charger require CE marking for the Greek market?

Equipment placed on the EU/Greek market must carry CE marking where applicable. The applicable directives for a representative OEM family (Growatt THOR 60DS) include LVD 2014/35/EU, EMC 2014/30/EU and the IEC 61851 series (Part 1: IEC 61851-1:2017). Confirm with the OEM's Declaration of Conformity and the OEM manual revision for the exact unit.

3. How long is the indicative payback for an urban DC 60 kW site in Greece?

Under the stated inputs the computed simple payback is 4.25 years and the discounted payback is 5.43 years, with NPV EUR 62,222.70 and IRR 22.93 % (see the computed tables above). Final landed cost requires the RFQ and a local electricity tariff lookup.

4. What documents are required to import EVSE from China to Greece?

Commercial invoice, packing list, bill of lading (FIATA documents), certificate of origin, CE/EMC/LVD Declarations of Conformity, UN 38.3 test summary per the UN Manual of Tests and Criteria (Rev.7) for any lithium battery subassembly, and any model test reports. ISPM 15 compliance is required for any wood packaging (IPPC ISPMs). Specific requirements must be confirmed with the Greek customs authority and the appointed customs broker.

5. Can TradVolt act as EU responsible person for CE compliance?

Compliance representation is model-specific and must be agreed per order. Indicate the target certification in the RFQ form and we will respond within 48 hours.

6. Which connector standard is typical for urban 60 kW DC sites in the EU?

CCS2 (IEC 62196-2 / IEC 62196-3 family) is the typical DC connector for the EU market. Confirm with the OEM datasheet for the specific model and any national requirements under AFIR / Greek national rules.