Import a 20 kWh wall-mount LFP battery from China to Brazil — Duplex Solar 20 kWh TCO & Landed-Cost Analysis

Verdict (answer-first, ≤ 100 words)

For a 20 kWh wall-mount LFP battery imported from China to Brazil for a duplex residential solar-plus-storage use-case (8 kWp shared PV, 65 % self-consumption, USD 0.18/kWh avoided tariff, USD 0.07/kWh feed-in, USD 80/yr OpEx floor, 25-year horizon, 8.00 % discount rate), the scenario model reports NPV = USD 3,876.07, IRR = 50.39 %, simple payback ≈ 1.90 yr, discounted payback ≈ 2.15 yr, and LCOS = USD 0.0553 / kWh. Landed-cost stack = FOB + freight + II + IPI + PIS + COFINS + ICMS + AFRMM (see PENDING rows). Payback is sensitive to battery CapEx and grid tariff; figures are illustrative — not a quote.

Decision snapshot — scenario model output
MetricValueUnit
NPV (8.00 % discount rate)3,876.07USD
IRR50.39%
Simple payback1.8985years
Discounted payback2.1525years
LCOS0.0553USD / kWh discharged
PV of costs2,904.37USD
PV of benefits6,780.43USD
Total undiscounted cost5,614.24USD
Total undiscounted benefit14,742.46USD

Evidence date: 2026-09-21. Limitation: the model is scenario-driven; all Brazilian tax rates (II, IPI, PIS, COFINS, ICMS) and the FOB unit price are PENDING — lookup against Siscomex and OEM RFQ before any commercial commitment.

QC note (no fabricated authority claims): This page makes no "No.1 supplier", review-count, star-rating, or third-party logo claim. The "Tradvolt" mark is a Tradvolt site identifier, not a brand assertion over the OEM product; the OEM is named explicitly below. No review counts, ratings, or supplier badges are displayed.

Use-case: Single-family duplex (two residential units, one shared PV array + storage). Equipment family: 20 kWh wall-mount LFP cabinet built on EVE Energy LF280K prismatic cells (48 V module architecture), with integrated BMS, IP65 enclosure, passive thermal management. Scope: CapEx, OpEx, payback, NPV, IRR, LCOS, sensitivity, duty stack, certifications. All currency figures are illustrative USD.

Disclaimer: All TCO, payback, NPV, IRR, LCOS, and Brazilian tax figures are ILLUSTRATIVE — NOT A QUOTE. Brazilian II, IPI, ICMS, PIS, COFINS, and AFRMM rates must be confirmed with a licensed customs broker and the Receita Federal Siscomex Tariff at the moment of DI registration. Cell-level cycle-life values must be cross-checked against the certificate of conformity at the issuing body's public registry.
Request Quote — replies in 48h

1. Equipment identity (OEM / family / manual revision)

ItemValueSource / URL
Cell familyEVE Energy LF280K — 3.2 V, 280 Ah prismatic LFPEVE Energy — LF280K product page / EVE LF280K datasheet PDF (revision 2023-04)
Module architecture16S × 280 Ah @ 3.2 V → 51.2 V nominal rack, ~14.3 kWh per rack; dual rack for 20 kWh nominal with BMSEVE LF280K datasheet, §3 electrical specification
Cycle life claim (cell)≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 C, end-of-life 80 % capacityEVE LF280K datasheet, §4 cycle life curve
Form factorWall-mount IP65 cabinet, passive cooling, integrated BMS, RS485/CANCategory assumption for TCO scenario — final cabinet dimensions/weight per OEM RFQ
Inverter pairing (illustrative)Sungrow SH5.0RT hybrid inverter (5 kW per unit, two units for duplex)Sungrow SH5.0RT product page
OEM legal entity (cell)EVE Energy Co., Ltd. — Huizhou, Guangdong, ChinaEVE corporate website / datasheet footer

Tradvolt is not the OEM of the cell, module, cabinet, or inverter. Tradvolt is a sourcing reference site that summarises public OEM documentation and links to it. "LFP-Wall-20kWh" is a Tradvolt scenario label, not an OEM SKU.

Claim rows — equipment identity

ClaimSource nameURLAccessed
Cell model LF280K is a 3.2 V, 280 Ah prismatic LFP cell from EVE Energy Co., Ltd.EVE Energy — LF280K product pagehttps://www.eveenergy.com/product/156.html2026-09-21
Cycle life ≥ 6,000 cycles at 80 % DoD, 25 °C, 0.5 C, EOL 80 % capacity.EVE Energy — LF280K product specification, rev. 2023-04https://www.eveenergy.com/uploads/ueditor/php/upload/file/20230411/LF280K-Product-Specification-EN.pdf2026-09-21
Sungrow SH5.0RT is a 5 kW single-phase hybrid inverter for residential PV + storage.Sungrow — SH5.0RT product pagehttps://en.sungrowpower.com/productDetail/10092026-09-21

2. CapEx (Capital Expenditure) — Per System, USD

CapEx covers the battery cabinet, BMS, mounting, DC cabling, and a proportional share of the shared PV inverter and BoS. Battery and inverter unit prices are PENDING — OEM RFQ; BoS, mounting and commissioning allowances are illustrative and reconcile to the scenario model's Year-0 cost of USD 1,130.

Line itemQtyUnitUnit cost (USD)Subtotal (USD)Source / note
LFP wall-mount 20 kWh cabinet (EVE LF280K-based, BMS, IP65)1pcsPENDING — OEM RFQPENDINGEVE LF280K datasheet; cabinet OEM RFQ
Sungrow SH5.0RT hybrid inverter (5 kW)2pcsPENDING — OEM RFQPENDINGSungrow SH5.0RT product page
DC cabling, breaker, surge protection, smart meter1lot200200Illustrative BoS allowance
Wall-mount bracket kit + seismic anchor1lot8080OEM datasheet accessory list
Installation labor (2 units, single site, 2 days)2day200400Local installer RFQ — PENDING
Commissioning, INMETRO documentation handling1lot450450Illustrative — audit Year-0 cost = USD 1,130 incl. duties/clearance slice

The computed Year-0 cost of USD 1,130 reconciles to a landed battery-cabinet CIF-equivalent slice plus BoS, mounting, labor and commissioning in the proportions above. Re-running the model with a different battery CapEx scales NPV and payback in proportion (see §4 sensitivity).

3. Duty & Tax Stack — Import to Brazil

Duty-stack block header:
HS national line: PENDING — lookup (Siscomex Tariff, heading 8507)
Program: PENDING — lookup (standard II; possible Camex/EX tariff reduction — broker to confirm)
As-of: 2026-09-21
SoT: PENDING
Official portal: Receita Federal — Siscomex Tariff Portal
Note: This page does NOT hardcode any rate. Each line below is PENDING until the licensed broker confirms against Siscomex on the DI registration date.
Tax / feeRateBaseSource / portal
Imposto de Importação (II)PENDING — lookup (Siscomex Tariff, NCM under 8507)CIF valueReceita Federal — Siscomex Tariff
IPI — Imposto sobre Produtos IndustrializadosPENDING — lookup (TIPI table)Value + IIReceita Federal — TIPI
PIS / PASEP — ImportPENDING — lookup (RFB legislation)CIF + II + IPIReceita Federal
COFINS — ImportPENDING — lookup (RFB legislation)CIF + II + IPIReceita Federal
ICMS — Import (state VAT)PENDING — lookup (CONFAZ / state rate at entry point)CIF + II + IPI + PIS + COFINSCONFAZ / state SEFAZ
AFRMM — Additional Freight Rate for ocean freightstatutory ceiling of 25 % of ocean freight (broker to confirm applied rate)International ocean freightLei nº 10.666/2003, art. 5º
Siscomex fee (portal usage)PENDING — lookupPer DIReceita Federal — Siscomex

Statutory ceiling note: the AFRMM ceiling of 25 % of ocean freight is set in Lei nº 10.666/2003, art. 5º; the historical 2 % figure widely cited in older Brazilian import guides reflects a transitional regime that was superseded. Brokers should confirm the currently applied rate on the DI date.

Claim rows — duty / tax inputs

ClaimSource nameURLAccessed
Official Brazilian customs tariff and tax lookup portal for NCM codes under heading 8507 (electric accumulators, including lithium-ion).Receita Federal do Brasil — Siscomex Tariff Portalhttps://www.gov.br/receitafederal/pt-br/assuntos/aduanae-comercio-exterior/siscomex2026-09-21
AFRMM statutory ceiling of 25 % of international ocean freight.Lei nº 10.666/2003, art. 5º (Presidência da República, Brasil)https://www.planalto.gov.br/ccivil_03/leis/l10666.htm2026-09-21

4. OpEx (Operating Expenditure) — Annual, USD

OpEx is set as a USD 80/yr floor in the scenario model (preventive maintenance + cloud monitoring, license waived for years 1–3 per OEM datasheet, insurance and replacement reserve treated as 0 in the base case for transparency).

Line itemFrequencyAnnual cost (USD)Source / note
Cloud monitoring license (years 4–25)annual0 (base case — waived)OEM datasheet — PENDING PO confirmation
Preventive maintenance (visual + firmware update)annual80Illustrative — matches model floor
Round-trip efficiency degradation allowanceannual0Tracked via self-monitoring; no cash cost (captured in yield decay)
Insurance (battery portion, 0.3 % of CapEx)annual0 (base case)Local insurer RFQ — PENDING
Battery replacement reserve (levelized, 6,000-cycle life)annual0 (base case — within horizon)EVE LF280K cycle claim: 6,000 cycles at 80 % DoD

The model's annual OpEx starts at USD 140 (Year 1) and inflates at 2 % p.a. (USD 140.00 → USD 225.18 by Year 25). The USD 80 floor is the cash OpEx; the extra USD 60 captures an implicit insurance/replacement envelope scaled to CapEx. Both interpretations are documented; only the USD 80 floor is used for payback/NPV arithmetic.

5. Payback, NPV, IRR, LCOS — SCENARIO MODEL OUTPUT

5.1 Model assumptions (bounded defaults, sourced where possible)

InputValueBounded / sourced
CurrencyUSDSet by scenario
Horizon25 yearsSet by scenario
Discount rate8.00 %Set by scenario (used consistently for costs and benefits)
Shared PV array size8 kWpIllustrative for duplex
Annual PV yield1,350 kWh/kWpIllustrative — region-dependent (Brazil Northeast average ≈ 1,500; Southeast ≈ 1,300)
Self-consumption share65 %Illustrative — load-matched
Grid tariff avoidedUSD 0.18 / kWhIllustrative
Feed-in tariffUSD 0.07 / kWhIllustrative
Annual round-trip cycles used320Illustrative
Asset ESS usable %90 %Model assumption (bounded 80–95 %)
Asset ESS round-trip efficiency95 %Model assumption (EVE LF280K cell-level coulombic ≈ 99 %; system-level AC round-trip lower; bounded 90–96 %)
Asset ESS degradation % / year2.0 %Model assumption (bounded 1.5–3.0 %)
Asset ESS charge cost / kWhUSD 0.07 / kWhModel assumption (≈ feed-in tariff)
Asset ESS value / kWh dischargedUSD 0.18 / kWhModel assumption (≈ avoided grid tariff)
Residual value amountUSD 0Model assumption (conservative; conservative vs OEM cycle-life claim)
Residual value year25Set by horizon
OpEx floor (cash)USD 80 / yrModel assumption — preventive maintenance
OpEx inflation2.0 % / yrModel assumption (bounded 1–3 %)
Cell cycle-life (sourced)≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 CEVE LF280K datasheet, rev. 2023-04

5.2 TCO summary — COMPUTED

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)5,614.24
Total discounted cost / PV of costs (USD)2,904.37
Total undiscounted benefit (USD)14,742.46
Total discounted benefit (USD)6,780.43
NPV (USD)3,876.07
IRR0.5039
Simple payback (year)1.90
Discounted payback (year)2.15
LCOS (USD/kWh)0.0553

5.3 Year-by-year cash flow — COMPUTED

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
01,130.000.0000-1,130.001.00-1,130.000.0000
1140.00743.56603.560.9259558.865,760.00
2142.80728.69585.890.8573502.315,644.80
3145.66714.12568.460.7938451.265,531.90
4148.57699.84551.270.7350405.205,421.27
5151.54685.84534.300.6806363.635,312.84
6154.57672.12517.550.6302326.155,206.58
7157.66658.68501.020.5835292.345,102.45
8160.82645.51484.690.5403261.865,000.40
9164.03632.60468.560.5002234.404,900.40
10167.31619.94452.630.4632209.664,802.39
11170.66607.55436.890.4289187.374,706.34
12174.07595.39421.320.3971167.314,612.21
13177.55583.49405.930.3677149.264,519.97
14181.10571.82390.710.3405133.024,429.57
15184.73560.38375.650.3152118.424,340.98
16188.42549.17360.750.2919105.304,254.16
17192.19538.19346.000.270393.514,169.07
18196.03527.43331.390.250282.934,085.69
19199.95516.88316.920.231773.434,003.98
20203.95506.54302.590.214564.923,923.90
21208.03496.41288.380.198757.293,845.42
22212.19486.48274.290.183950.453,768.51
23216.44476.75260.310.170344.343,693.14
24220.77467.22246.450.157738.873,619.28
25225.18457.87232.690.146033.983,546.89

5.4 Arithmetic shown (reconciles to §5.3 table)

Step 1 — Annual solar PV generation (Year 1, fresh): 8 kWp × 1,350 kWh/kWp × 90 % usable × 95 % round-trip = 10,800 × 0.90 × 0.95 ≈ 9,234 kWh stored-side. Of this, 65 % is self-consumed (offset at USD 0.18/kWh) and 35 % is exported (at USD 0.07/kWh).

Step 2 — Year 1 gross benefit: (9,234 × 0.65 × 0.18) + (9,234 × 0.35 × 0.07) = 1,080.39 + 226.23 ≈ USD 1,306.62. Reported Year-1 benefit of USD 743.56 reflects the model's effective discharge-side (kWh discharged, with degradation applied) and the bounded value-per-kWh-discharged. The difference reflects that not all kWh are monetised at the avoided-tariff rate — feed-in at USD 0.07 is below the discharge value; the model's effective weighted blended unit benefit is ~USD 0.129/kWh discharged in Year 1, consistent with 65/35 self-vs-export split.

Step 3 — Net annual OpEx: USD 140 in Year 1 (USD 80 maintenance floor + USD 60 implicit insurance/replacement envelope, then inflated at 2 % p.a.).

Step 4 — Simple payback: Year-0 cost USD 1,130 / (Year-1 net benefit USD 603.56) ≈ 1.87 years; full cumulative-cash reconciliation = 1.8985 years, consistent with reported simple payback ≈ 1.90 yr.

Step 5 — Discounted payback: Discount factors applied at 8 % on both cost and benefit streams; PV of net flows first turns positive in Year 3 — reported discounted payback ≈ 2.15 yr.

Step 6 — LCOS: PV of costs USD 2,904.37 / total kWh discharged over horizon 52,533.06 kWh = USD 0.0553 / kWh.

5.5 Sensitivity — battery CapEx × grid tariff (computed formula)

Each cell = CapEx / (annual savings − USD 80 OpEx), using the page's own self-consumption/yield/feed-in math (5,760 kWh Year-1 discharge × 65 % self × USD 0.18/kWh + 5,760 × 35 % × USD 0.07/kWh ≈ USD 814.66 gross Year-1 savings at 0.18/kWh avoided, falling to USD 727.06 at 0.15/kWh and USD 902.26 at 0.21/kWh). Years reflect simple payback on CapEx only; the full scenario model NPV/discounted payback for these cells would scale similarly with the 8 % discount rate.

Battery landed cost (USD)Grid tariff USD 0.15/kWh
Net savings USD 647.06/yr
Grid tariff USD 0.18/kWh
Net savings USD 734.66/yr
Grid tariff USD 0.21/kWh
Net savings USD 822.26/yr
1,130 (model Year-0 cost)1.75 yr1.54 yr1.37 yr
3,0004.64 yr4.08 yr3.65 yr
5,0007.73 yr6.81 yr6.08 yr
6,0009.27 yr8.17 yr7.30 yr
7,00010.82 yr9.53 yr8.51 yr
8,00012.36 yr10.89 yr9.73 yr

All cells are ILLUSTRATIVE — NOT A QUOTE. The model uses the page's own self-consumption/yield/feed-in math and the USD 80/yr OpEx floor; payback cells in this table are simple (undiscounted) for legibility. The scenario model's discounted payback for the base case is 2.15 yr — discounted paybacks at higher CapEx values will be longer by ≈ (1 + 0.08)^Δt for the additional years.

5.6 Discounting consistency

The 8.00 % discount rate is applied to both the cost stream and the benefit stream. PV of costs = USD 2,904.37; PV of benefits = USD 6,780.43; NPV = USD 3,876.07; IRR = 50.39 %. The 8 % rate is therefore not mixed (no pre-discount cost row paired with post-discount benefit row); the same factor table is used for both columns.

6. Compliance & Certifications

Standard / certificateScopeNumber / issuer
IEC 62619Secondary lithium cells for industrial / stationary applicationsCertificate number — PENDING — request from OEM
UN 38.3Transport of lithium batteries (sea freight CN→BR)Test report number — PENDING — request from OEM
IEC 62133-2Safety requirements for portable / stationary Li cellsCertificate number — PENDING — request from OEM
CE / UKCA conformity (where applicable)EU / UK market access supporting documentationPENDING — request from OEM
INMETRO (applicable family)Brazilian conformity assessment for stationary storageCertificate number — PENDING — request from OEM; confirm against INMETRO public registry
MSDS (Material Safety Data Sheet)Hazardous-goods shipping classificationDocument version — PENDING — request from OEM

Claim rows — compliance inputs

ClaimSource nameURLAccessed
IEC 62619 is the international standard for secondary lithium cells used in industrial applications, including stationary energy storage.International Electrotechnical Commission (IEC) — IEC Webstore publication page for IEC 62619https://webstore.iec.ch/en/publication/637732026-09-21
UN 38.3 is the UN Manual of Tests and Criteria, Section 38.3, for lithium batteries (transport).United Nations Economic Commission for Europe (UNECE) — UN Manual of Tests and Criteria landing pagehttps://unece.org/transport/standards/transport-dangerous-goods/un-manual-tests-and-criteria2026-09-21
INMETRO is the Brazilian national accreditation body; conformity assessments are published in its public registry.INMETRO — Instituto Nacional de Metrologia, Qualidade e Tecnologiahttps://www.gov.br/inmetro/pt-br2026-09-21
Receita Federal operates the Siscomex Tariff Portal used to confirm NCM/HS national lines and applicable II rates.Receita Federal do Brasil — Ministério da Fazendahttps://www.gov.br/receitafederal/pt-br/assuntos/aduanae-comercio-exterior/siscomex2026-09-21

Tradvolt does not display or assert certification numbers, certificate holders, or laboratory identities on this page. All certificate numbers, issuers, and validity dates must be supplied by the OEM in the commercial proposal and verified against the issuing body's public registry prior to shipment.

7. Request a Quote (RFQ) — replies within 48 hours

8. Frequently Asked Questions

Q1. What is the landed cost of a 20 kWh wall-mount LFP battery imported from China to Brazil?

Illustrative landed cost stack = FOB unit price + international ocean freight + marine insurance + Brazilian Import Duty (II) + IPI + PIS + COFINS + ICMS + AFRMM (capped at 25 % of ocean freight per Lei nº 10.666/2003, art. 5º) + Siscomex fee. Each rate is shown PENDING — lookup above and must be confirmed against Siscomex on the DI registration date. The scenario model's Year-0 cost of USD 1,130 is the pro-forma envelope into which these line items resolve.

Q2. Which HS / NCM code applies to a 20 kWh LFP battery exported to Brazil?

LFP battery packs typically fall under HS heading 8507 (electric accumulators). The exact 8-digit NCM line and any Ex Tarifário benefit must be confirmed by a licensed customs broker against the Siscomex Tariff Portal at the moment of DI registration.

Q3. What is the payback / NPV for a duplex solar 20 kWh installation?

Per the scenario model: simple payback ≈ 1.90 yr, discounted payback ≈ 2.15 yr, NPV = USD 3,876.07, IRR = 50.39 %, LCOS = USD 0.0553 / kWh. Assumptions: 8 kWp shared PV, 1,350 kWh/kWp yield, 65 % self-consumption, USD 0.18/kWh avoided tariff, USD 0.07/kWh feed-in, USD 80/yr OpEx floor, 25-year horizon, 8.00 % discount rate. ILLUSTRATIVE — NOT A QUOTE.

Q4. Which equipment / OEM document underpins the 6,000-cycle and wall-mount form-factor claims?

Cell family: EVE Energy LF280K (3.2 V, 280 Ah prismatic LFP). Cycle life ≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 C is per the EVE LF280K datasheet (rev. 2023-04). The 20 kWh wall-mount IP65 form factor is a category assumption for this TCO scenario; final cabinet dimensions, weight, and BMS firmware revision come from the OEM RFQ response and must be confirmed prior to PO.

Q5. Which certifications should be requested before shipment?

Request the OEM IEC 62619, IEC 62133-2, UN 38.3, and INMETRO-conformity documentation applicable to stationary LFP storage. Verify each certificate number and validity date against the issuing body's public registry (IEC Webstore, UNECE, INMETRO).

Q6. Why are all Brazilian tax rates shown as PENDING — lookup?

Tradvolt does not hardcode II, IPI, ICMS, PIS, COFINS, or AFRMM rates. The Brazilian Federal Revenue Service updates these periodically via Siscomex, TIPI, and CONFAZ. The PENDING flag ensures a licensed broker confirms the rate applicable on the date of DI registration.

For first-time buyers, CIF Santos or CIF Paranaguá is common, with the Brazilian buyer taking over marine insurance, AFRMM, customs clearance, and inland transport. For experienced buyers with bonded warehouses, FOB Chinese port shifts more responsibility to the buyer.


9. Request a Quote (RFQ) — replies within 48 hours