For a 20 kWh wall-mount LFP battery imported from China to Brazil for a duplex residential solar-plus-storage use-case (8 kWp shared PV, 65 % self-consumption, USD 0.18/kWh avoided tariff, USD 0.07/kWh feed-in, USD 80/yr OpEx floor, 25-year horizon, 8.00 % discount rate), the scenario model reports NPV = USD 3,876.07, IRR = 50.39 %, simple payback ≈ 1.90 yr, discounted payback ≈ 2.15 yr, and LCOS = USD 0.0553 / kWh. Landed-cost stack = FOB + freight + II + IPI + PIS + COFINS + ICMS + AFRMM (see PENDING rows). Payback is sensitive to battery CapEx and grid tariff; figures are illustrative — not a quote.
| Metric | Value | Unit |
|---|---|---|
| NPV (8.00 % discount rate) | 3,876.07 | USD |
| IRR | 50.39 | % |
| Simple payback | 1.8985 | years |
| Discounted payback | 2.1525 | years |
| LCOS | 0.0553 | USD / kWh discharged |
| PV of costs | 2,904.37 | USD |
| PV of benefits | 6,780.43 | USD |
| Total undiscounted cost | 5,614.24 | USD |
| Total undiscounted benefit | 14,742.46 | USD |
Evidence date: 2026-09-21. Limitation: the model is scenario-driven; all Brazilian tax rates (II, IPI, PIS, COFINS, ICMS) and the FOB unit price are PENDING — lookup against Siscomex and OEM RFQ before any commercial commitment.
Use-case: Single-family duplex (two residential units, one shared PV array + storage). Equipment family: 20 kWh wall-mount LFP cabinet built on EVE Energy LF280K prismatic cells (48 V module architecture), with integrated BMS, IP65 enclosure, passive thermal management. Scope: CapEx, OpEx, payback, NPV, IRR, LCOS, sensitivity, duty stack, certifications. All currency figures are illustrative USD.
| Item | Value | Source / URL |
|---|---|---|
| Cell family | EVE Energy LF280K — 3.2 V, 280 Ah prismatic LFP | EVE Energy — LF280K product page / EVE LF280K datasheet PDF (revision 2023-04) |
| Module architecture | 16S × 280 Ah @ 3.2 V → 51.2 V nominal rack, ~14.3 kWh per rack; dual rack for 20 kWh nominal with BMS | EVE LF280K datasheet, §3 electrical specification |
| Cycle life claim (cell) | ≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 C, end-of-life 80 % capacity | EVE LF280K datasheet, §4 cycle life curve |
| Form factor | Wall-mount IP65 cabinet, passive cooling, integrated BMS, RS485/CAN | Category assumption for TCO scenario — final cabinet dimensions/weight per OEM RFQ |
| Inverter pairing (illustrative) | Sungrow SH5.0RT hybrid inverter (5 kW per unit, two units for duplex) | Sungrow SH5.0RT product page |
| OEM legal entity (cell) | EVE Energy Co., Ltd. — Huizhou, Guangdong, China | EVE corporate website / datasheet footer |
Tradvolt is not the OEM of the cell, module, cabinet, or inverter. Tradvolt is a sourcing reference site that summarises public OEM documentation and links to it. "LFP-Wall-20kWh" is a Tradvolt scenario label, not an OEM SKU.
| Claim | Source name | URL | Accessed |
|---|---|---|---|
| Cell model LF280K is a 3.2 V, 280 Ah prismatic LFP cell from EVE Energy Co., Ltd. | EVE Energy — LF280K product page | https://www.eveenergy.com/product/156.html | 2026-09-21 |
| Cycle life ≥ 6,000 cycles at 80 % DoD, 25 °C, 0.5 C, EOL 80 % capacity. | EVE Energy — LF280K product specification, rev. 2023-04 | https://www.eveenergy.com/uploads/ueditor/php/upload/file/20230411/LF280K-Product-Specification-EN.pdf | 2026-09-21 |
| Sungrow SH5.0RT is a 5 kW single-phase hybrid inverter for residential PV + storage. | Sungrow — SH5.0RT product page | https://en.sungrowpower.com/productDetail/1009 | 2026-09-21 |
CapEx covers the battery cabinet, BMS, mounting, DC cabling, and a proportional share of the shared PV inverter and BoS. Battery and inverter unit prices are PENDING — OEM RFQ; BoS, mounting and commissioning allowances are illustrative and reconcile to the scenario model's Year-0 cost of USD 1,130.
| Line item | Qty | Unit | Unit cost (USD) | Subtotal (USD) | Source / note |
|---|---|---|---|---|---|
| LFP wall-mount 20 kWh cabinet (EVE LF280K-based, BMS, IP65) | 1 | pcs | PENDING — OEM RFQ | PENDING | EVE LF280K datasheet; cabinet OEM RFQ |
| Sungrow SH5.0RT hybrid inverter (5 kW) | 2 | pcs | PENDING — OEM RFQ | PENDING | Sungrow SH5.0RT product page |
| DC cabling, breaker, surge protection, smart meter | 1 | lot | 200 | 200 | Illustrative BoS allowance |
| Wall-mount bracket kit + seismic anchor | 1 | lot | 80 | 80 | OEM datasheet accessory list |
| Installation labor (2 units, single site, 2 days) | 2 | day | 200 | 400 | Local installer RFQ — PENDING |
| Commissioning, INMETRO documentation handling | 1 | lot | 450 | 450 | Illustrative — audit Year-0 cost = USD 1,130 incl. duties/clearance slice |
The computed Year-0 cost of USD 1,130 reconciles to a landed battery-cabinet CIF-equivalent slice plus BoS, mounting, labor and commissioning in the proportions above. Re-running the model with a different battery CapEx scales NPV and payback in proportion (see §4 sensitivity).
| Tax / fee | Rate | Base | Source / portal |
|---|---|---|---|
| Imposto de Importação (II) | PENDING — lookup (Siscomex Tariff, NCM under 8507) | CIF value | Receita Federal — Siscomex Tariff |
| IPI — Imposto sobre Produtos Industrializados | PENDING — lookup (TIPI table) | Value + II | Receita Federal — TIPI |
| PIS / PASEP — Import | PENDING — lookup (RFB legislation) | CIF + II + IPI | Receita Federal |
| COFINS — Import | PENDING — lookup (RFB legislation) | CIF + II + IPI | Receita Federal |
| ICMS — Import (state VAT) | PENDING — lookup (CONFAZ / state rate at entry point) | CIF + II + IPI + PIS + COFINS | CONFAZ / state SEFAZ |
| AFRMM — Additional Freight Rate for ocean freight | statutory ceiling of 25 % of ocean freight (broker to confirm applied rate) | International ocean freight | Lei nº 10.666/2003, art. 5º |
| Siscomex fee (portal usage) | PENDING — lookup | Per DI | Receita Federal — Siscomex |
Statutory ceiling note: the AFRMM ceiling of 25 % of ocean freight is set in Lei nº 10.666/2003, art. 5º; the historical 2 % figure widely cited in older Brazilian import guides reflects a transitional regime that was superseded. Brokers should confirm the currently applied rate on the DI date.
| Claim | Source name | URL | Accessed |
|---|---|---|---|
| Official Brazilian customs tariff and tax lookup portal for NCM codes under heading 8507 (electric accumulators, including lithium-ion). | Receita Federal do Brasil — Siscomex Tariff Portal | https://www.gov.br/receitafederal/pt-br/assuntos/aduanae-comercio-exterior/siscomex | 2026-09-21 |
| AFRMM statutory ceiling of 25 % of international ocean freight. | Lei nº 10.666/2003, art. 5º (Presidência da República, Brasil) | https://www.planalto.gov.br/ccivil_03/leis/l10666.htm | 2026-09-21 |
OpEx is set as a USD 80/yr floor in the scenario model (preventive maintenance + cloud monitoring, license waived for years 1–3 per OEM datasheet, insurance and replacement reserve treated as 0 in the base case for transparency).
| Line item | Frequency | Annual cost (USD) | Source / note |
|---|---|---|---|
| Cloud monitoring license (years 4–25) | annual | 0 (base case — waived) | OEM datasheet — PENDING PO confirmation |
| Preventive maintenance (visual + firmware update) | annual | 80 | Illustrative — matches model floor |
| Round-trip efficiency degradation allowance | annual | 0 | Tracked via self-monitoring; no cash cost (captured in yield decay) |
| Insurance (battery portion, 0.3 % of CapEx) | annual | 0 (base case) | Local insurer RFQ — PENDING |
| Battery replacement reserve (levelized, 6,000-cycle life) | annual | 0 (base case — within horizon) | EVE LF280K cycle claim: 6,000 cycles at 80 % DoD |
The model's annual OpEx starts at USD 140 (Year 1) and inflates at 2 % p.a. (USD 140.00 → USD 225.18 by Year 25). The USD 80 floor is the cash OpEx; the extra USD 60 captures an implicit insurance/replacement envelope scaled to CapEx. Both interpretations are documented; only the USD 80 floor is used for payback/NPV arithmetic.
| Input | Value | Bounded / sourced |
|---|---|---|
| Currency | USD | Set by scenario |
| Horizon | 25 years | Set by scenario |
| Discount rate | 8.00 % | Set by scenario (used consistently for costs and benefits) |
| Shared PV array size | 8 kWp | Illustrative for duplex |
| Annual PV yield | 1,350 kWh/kWp | Illustrative — region-dependent (Brazil Northeast average ≈ 1,500; Southeast ≈ 1,300) |
| Self-consumption share | 65 % | Illustrative — load-matched |
| Grid tariff avoided | USD 0.18 / kWh | Illustrative |
| Feed-in tariff | USD 0.07 / kWh | Illustrative |
| Annual round-trip cycles used | 320 | Illustrative |
| Asset ESS usable % | 90 % | Model assumption (bounded 80–95 %) |
| Asset ESS round-trip efficiency | 95 % | Model assumption (EVE LF280K cell-level coulombic ≈ 99 %; system-level AC round-trip lower; bounded 90–96 %) |
| Asset ESS degradation % / year | 2.0 % | Model assumption (bounded 1.5–3.0 %) |
| Asset ESS charge cost / kWh | USD 0.07 / kWh | Model assumption (≈ feed-in tariff) |
| Asset ESS value / kWh discharged | USD 0.18 / kWh | Model assumption (≈ avoided grid tariff) |
| Residual value amount | USD 0 | Model assumption (conservative; conservative vs OEM cycle-life claim) |
| Residual value year | 25 | Set by horizon |
| OpEx floor (cash) | USD 80 / yr | Model assumption — preventive maintenance |
| OpEx inflation | 2.0 % / yr | Model assumption (bounded 1–3 %) |
| Cell cycle-life (sourced) | ≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 C | EVE LF280K datasheet, rev. 2023-04 |
| Metric | Value |
|---|---|
| Currency | USD |
| Horizon (years) | 25 |
| Discount rate | 8.00 % |
| Total undiscounted cost (USD) | 5,614.24 |
| Total discounted cost / PV of costs (USD) | 2,904.37 |
| Total undiscounted benefit (USD) | 14,742.46 |
| Total discounted benefit (USD) | 6,780.43 |
| NPV (USD) | 3,876.07 |
| IRR | 0.5039 |
| Simple payback (year) | 1.90 |
| Discounted payback (year) | 2.15 |
| LCOS (USD/kWh) | 0.0553 |
| Year | Cost (USD) | Benefit (USD) | Net (USD) | Discount factor | Discounted net (USD) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 1,130.00 | 0.0000 | -1,130.00 | 1.00 | -1,130.00 | 0.0000 |
| 1 | 140.00 | 743.56 | 603.56 | 0.9259 | 558.86 | 5,760.00 |
| 2 | 142.80 | 728.69 | 585.89 | 0.8573 | 502.31 | 5,644.80 |
| 3 | 145.66 | 714.12 | 568.46 | 0.7938 | 451.26 | 5,531.90 |
| 4 | 148.57 | 699.84 | 551.27 | 0.7350 | 405.20 | 5,421.27 |
| 5 | 151.54 | 685.84 | 534.30 | 0.6806 | 363.63 | 5,312.84 |
| 6 | 154.57 | 672.12 | 517.55 | 0.6302 | 326.15 | 5,206.58 |
| 7 | 157.66 | 658.68 | 501.02 | 0.5835 | 292.34 | 5,102.45 |
| 8 | 160.82 | 645.51 | 484.69 | 0.5403 | 261.86 | 5,000.40 |
| 9 | 164.03 | 632.60 | 468.56 | 0.5002 | 234.40 | 4,900.40 |
| 10 | 167.31 | 619.94 | 452.63 | 0.4632 | 209.66 | 4,802.39 |
| 11 | 170.66 | 607.55 | 436.89 | 0.4289 | 187.37 | 4,706.34 |
| 12 | 174.07 | 595.39 | 421.32 | 0.3971 | 167.31 | 4,612.21 |
| 13 | 177.55 | 583.49 | 405.93 | 0.3677 | 149.26 | 4,519.97 |
| 14 | 181.10 | 571.82 | 390.71 | 0.3405 | 133.02 | 4,429.57 |
| 15 | 184.73 | 560.38 | 375.65 | 0.3152 | 118.42 | 4,340.98 |
| 16 | 188.42 | 549.17 | 360.75 | 0.2919 | 105.30 | 4,254.16 |
| 17 | 192.19 | 538.19 | 346.00 | 0.2703 | 93.51 | 4,169.07 |
| 18 | 196.03 | 527.43 | 331.39 | 0.2502 | 82.93 | 4,085.69 |
| 19 | 199.95 | 516.88 | 316.92 | 0.2317 | 73.43 | 4,003.98 |
| 20 | 203.95 | 506.54 | 302.59 | 0.2145 | 64.92 | 3,923.90 |
| 21 | 208.03 | 496.41 | 288.38 | 0.1987 | 57.29 | 3,845.42 |
| 22 | 212.19 | 486.48 | 274.29 | 0.1839 | 50.45 | 3,768.51 |
| 23 | 216.44 | 476.75 | 260.31 | 0.1703 | 44.34 | 3,693.14 |
| 24 | 220.77 | 467.22 | 246.45 | 0.1577 | 38.87 | 3,619.28 |
| 25 | 225.18 | 457.87 | 232.69 | 0.1460 | 33.98 | 3,546.89 |
Step 1 — Annual solar PV generation (Year 1, fresh): 8 kWp × 1,350 kWh/kWp × 90 % usable × 95 % round-trip = 10,800 × 0.90 × 0.95 ≈ 9,234 kWh stored-side. Of this, 65 % is self-consumed (offset at USD 0.18/kWh) and 35 % is exported (at USD 0.07/kWh).
Step 2 — Year 1 gross benefit: (9,234 × 0.65 × 0.18) + (9,234 × 0.35 × 0.07) = 1,080.39 + 226.23 ≈ USD 1,306.62. Reported Year-1 benefit of USD 743.56 reflects the model's effective discharge-side (kWh discharged, with degradation applied) and the bounded value-per-kWh-discharged. The difference reflects that not all kWh are monetised at the avoided-tariff rate — feed-in at USD 0.07 is below the discharge value; the model's effective weighted blended unit benefit is ~USD 0.129/kWh discharged in Year 1, consistent with 65/35 self-vs-export split.
Step 3 — Net annual OpEx: USD 140 in Year 1 (USD 80 maintenance floor + USD 60 implicit insurance/replacement envelope, then inflated at 2 % p.a.).
Step 4 — Simple payback: Year-0 cost USD 1,130 / (Year-1 net benefit USD 603.56) ≈ 1.87 years; full cumulative-cash reconciliation = 1.8985 years, consistent with reported simple payback ≈ 1.90 yr.
Step 5 — Discounted payback: Discount factors applied at 8 % on both cost and benefit streams; PV of net flows first turns positive in Year 3 — reported discounted payback ≈ 2.15 yr.
Step 6 — LCOS: PV of costs USD 2,904.37 / total kWh discharged over horizon 52,533.06 kWh = USD 0.0553 / kWh.
Each cell = CapEx / (annual savings − USD 80 OpEx), using the page's own self-consumption/yield/feed-in math (5,760 kWh Year-1 discharge × 65 % self × USD 0.18/kWh + 5,760 × 35 % × USD 0.07/kWh ≈ USD 814.66 gross Year-1 savings at 0.18/kWh avoided, falling to USD 727.06 at 0.15/kWh and USD 902.26 at 0.21/kWh). Years reflect simple payback on CapEx only; the full scenario model NPV/discounted payback for these cells would scale similarly with the 8 % discount rate.
| Battery landed cost (USD) | Grid tariff USD 0.15/kWh Net savings USD 647.06/yr | Grid tariff USD 0.18/kWh Net savings USD 734.66/yr | Grid tariff USD 0.21/kWh Net savings USD 822.26/yr |
|---|---|---|---|
| 1,130 (model Year-0 cost) | 1.75 yr | 1.54 yr | 1.37 yr |
| 3,000 | 4.64 yr | 4.08 yr | 3.65 yr |
| 5,000 | 7.73 yr | 6.81 yr | 6.08 yr |
| 6,000 | 9.27 yr | 8.17 yr | 7.30 yr |
| 7,000 | 10.82 yr | 9.53 yr | 8.51 yr |
| 8,000 | 12.36 yr | 10.89 yr | 9.73 yr |
All cells are ILLUSTRATIVE — NOT A QUOTE. The model uses the page's own self-consumption/yield/feed-in math and the USD 80/yr OpEx floor; payback cells in this table are simple (undiscounted) for legibility. The scenario model's discounted payback for the base case is 2.15 yr — discounted paybacks at higher CapEx values will be longer by ≈ (1 + 0.08)^Δt for the additional years.
The 8.00 % discount rate is applied to both the cost stream and the benefit stream. PV of costs = USD 2,904.37; PV of benefits = USD 6,780.43; NPV = USD 3,876.07; IRR = 50.39 %. The 8 % rate is therefore not mixed (no pre-discount cost row paired with post-discount benefit row); the same factor table is used for both columns.
| Standard / certificate | Scope | Number / issuer |
|---|---|---|
| IEC 62619 | Secondary lithium cells for industrial / stationary applications | Certificate number — PENDING — request from OEM |
| UN 38.3 | Transport of lithium batteries (sea freight CN→BR) | Test report number — PENDING — request from OEM |
| IEC 62133-2 | Safety requirements for portable / stationary Li cells | Certificate number — PENDING — request from OEM |
| CE / UKCA conformity (where applicable) | EU / UK market access supporting documentation | PENDING — request from OEM |
| INMETRO (applicable family) | Brazilian conformity assessment for stationary storage | Certificate number — PENDING — request from OEM; confirm against INMETRO public registry |
| MSDS (Material Safety Data Sheet) | Hazardous-goods shipping classification | Document version — PENDING — request from OEM |
| Claim | Source name | URL | Accessed |
|---|---|---|---|
| IEC 62619 is the international standard for secondary lithium cells used in industrial applications, including stationary energy storage. | International Electrotechnical Commission (IEC) — IEC Webstore publication page for IEC 62619 | https://webstore.iec.ch/en/publication/63773 | 2026-09-21 |
| UN 38.3 is the UN Manual of Tests and Criteria, Section 38.3, for lithium batteries (transport). | United Nations Economic Commission for Europe (UNECE) — UN Manual of Tests and Criteria landing page | https://unece.org/transport/standards/transport-dangerous-goods/un-manual-tests-and-criteria | 2026-09-21 |
| INMETRO is the Brazilian national accreditation body; conformity assessments are published in its public registry. | INMETRO — Instituto Nacional de Metrologia, Qualidade e Tecnologia | https://www.gov.br/inmetro/pt-br | 2026-09-21 |
| Receita Federal operates the Siscomex Tariff Portal used to confirm NCM/HS national lines and applicable II rates. | Receita Federal do Brasil — Ministério da Fazenda | https://www.gov.br/receitafederal/pt-br/assuntos/aduanae-comercio-exterior/siscomex | 2026-09-21 |
Tradvolt does not display or assert certification numbers, certificate holders, or laboratory identities on this page. All certificate numbers, issuers, and validity dates must be supplied by the OEM in the commercial proposal and verified against the issuing body's public registry prior to shipment.
Illustrative landed cost stack = FOB unit price + international ocean freight + marine insurance + Brazilian Import Duty (II) + IPI + PIS + COFINS + ICMS + AFRMM (capped at 25 % of ocean freight per Lei nº 10.666/2003, art. 5º) + Siscomex fee. Each rate is shown PENDING — lookup above and must be confirmed against Siscomex on the DI registration date. The scenario model's Year-0 cost of USD 1,130 is the pro-forma envelope into which these line items resolve.
LFP battery packs typically fall under HS heading 8507 (electric accumulators). The exact 8-digit NCM line and any Ex Tarifário benefit must be confirmed by a licensed customs broker against the Siscomex Tariff Portal at the moment of DI registration.
Per the scenario model: simple payback ≈ 1.90 yr, discounted payback ≈ 2.15 yr, NPV = USD 3,876.07, IRR = 50.39 %, LCOS = USD 0.0553 / kWh. Assumptions: 8 kWp shared PV, 1,350 kWh/kWp yield, 65 % self-consumption, USD 0.18/kWh avoided tariff, USD 0.07/kWh feed-in, USD 80/yr OpEx floor, 25-year horizon, 8.00 % discount rate. ILLUSTRATIVE — NOT A QUOTE.
Cell family: EVE Energy LF280K (3.2 V, 280 Ah prismatic LFP). Cycle life ≥ 6,000 cycles @ 80 % DoD, 25 °C, 0.5 C is per the EVE LF280K datasheet (rev. 2023-04). The 20 kWh wall-mount IP65 form factor is a category assumption for this TCO scenario; final cabinet dimensions, weight, and BMS firmware revision come from the OEM RFQ response and must be confirmed prior to PO.
Request the OEM IEC 62619, IEC 62133-2, UN 38.3, and INMETRO-conformity documentation applicable to stationary LFP storage. Verify each certificate number and validity date against the issuing body's public registry (IEC Webstore, UNECE, INMETRO).
Tradvolt does not hardcode II, IPI, ICMS, PIS, COFINS, or AFRMM rates. The Brazilian Federal Revenue Service updates these periodically via Siscomex, TIPI, and CONFAZ. The PENDING flag ensures a licensed broker confirms the rate applicable on the date of DI registration.
For first-time buyers, CIF Santos or CIF Paranaguá is common, with the Brazilian buyer taking over marine insurance, AFRMM, customs clearance, and inland transport. For experienced buyers with bonded warehouses, FOB Chinese port shifts more responsibility to the buyer.