Import On-Grid Inverter 100 kW from China to Georgia — Warehouse Rooftop 100 kW TCO & Landed-Cost

Vertical: Solar Balance-of-System (BoS). Use-case: commercial/industrial warehouse rooftop, 100 kW three-phase grid-tied PV, origin China → destination Georgia. Reference inverter: Sungrow SG100CX (100 kW, three-phase string inverter, 400 V AC). All figures are ILLUSTRATIVE — NOT A QUOTE. Computed by Tradvolt's scenario TCO model from the scenario inputs on this page; financial figures are computed for the stated inputs. Replace inputs with site-specific measured irradiance, Georgian commercial tariff, and self-consumption before any commercial decision.

Request Quote — replies in 48 h

Answer / Verdict

For a 100 kW commercial warehouse rooftop PV system in Georgia using a Sungrow SG100CX three-phase on-grid inverter sourced from China, at the computed inputs the project's NPV is USD 36,341.59 over a 25-year horizon at a 10.00% discount rate, with a simple payback of 7.04 years, a discounted payback of 11.94 years, an IRR of 14.91%, and an LCOE of USD 0.0737/kWh. Equipment: Sungrow SG100CX (100 kW three-phase string inverter). Location: Georgia (Tbilisi-area irradiance assumption). Horizon: 25 years. Discount rate: 10.00 %. Evidence date: 2026-09-21. Limitation: results depend on bounded model assumptions for opex, residual value, export tariff, PV degradation, and the dropped inverter-replacement reserve; see §3.

MetricValue
Net Present Value (NPV)USD 36,341.59
Internal Rate of Return (IRR)14.91 %
Simple payback7.04 years
Discounted payback11.94 years
Levelised Cost of Energy (LCOE)USD 0.0737 / kWh
Reference inverterSungrow SG100CX (100 kW, 3-phase, 400 V AC)
Origin → DestinationChina → Georgia
Horizon / Discount rate25 years / 10.00 %
PV of lifetime costs (numerator of LCOE)USD 80,000.00
PV of lifetime generation (denominator of LCOE)1,084,989 kWh → LCOE 0.0737 USD/kWh

1. Equipment & Reference Inverter

The reference inverter used for the BoS sizing and TCO is the Sungrow SG100CX, a 100 kW three-phase grid-tied string inverter from Sungrow Power Supply Co., Ltd. The Sungrow SG100CX datasheet specifies: 100 kW AC nominal output, 400 V AC three-phase, multi-MPPT configuration, IP66 enclosure, integrated DC switch, Type II DC/AC SPD. Inverter-level inputs (MPPT voltage window, max DC voltage, AC voltage window, max efficiency) are taken from that datasheet. Source — Sungrow product range page (incl. SG100CX) — URL https://www.sungrowpower.com/en/products/string-inverter — accessed 2026-09-21. (Exact per-SKU datasheet and CB test-report identity provided on request via RFQ.)

ParameterValueSource
Model / familySungrow SG100CXSungrow string-inverter product range page
AC nominal output100 kWSungrow SG100CX datasheet (per-SKU)
AC voltage400 V, three-phaseSungrow SG100CX datasheet (per-SKU)
Max. PV input voltage (DC)per datasheetSungrow SG100CX datasheet (per-SKU)
MPPT count / stringsper datasheetSungrow SG100CX datasheet (per-SKU)
Max. efficiencyper datasheetSungrow SG100CX datasheet (per-SKU)
Enclosure / coolingIP66Sungrow SG100CX datasheet (per-SKU)
Reference safety standardIEC 62109-1:2010 / IEC 62109-2:2011https://webstore.iec.ch/en/publication/6470 ; https://webstore.iec.ch/en/publication/6471
Reference utility-interface standardsIEC 61727, IEC 62116IEC Webstore catalogue — https://webstore.iec.ch/

Sungrow supplier profile (company: Sungrow Power Supply Co., Ltd., founded 1997; PV inverters, ESS, wind converters, EV charging, floating PV, hydrogen): URL https://www.sungrowpower.com/about.html — accessed 2026-09-21.

2. Scenario Inputs

InputValueCitation
System DC size100 kWpModel assumption — bounded by the SG100CX 100 kW AC rating and a 1:1 DC/AC ratio. Sungrow SG100CX datasheet confirms 100 kW AC.
Performance ratio (PR)0.80IEC 61724-1 defines PR and reports typical C&I rooftop system PRs in the 0.70–0.85 range; 0.80 is the midpoint used as a bounded model assumption. Source — IEC Webstore (PV system performance) — URL https://webstore.iec.ch/ — full designation IEC 61724-1 in text.
Specific yield1,240 kWh/kWp/yrDerived from PVGIS-SARAH2 for Tbilisi (long-term average GHI ≈ 1,550 kWh/m²/yr × PR 0.80). Source — EU JRC PVGIS — URL https://re.jrc.ec.europa.eu/pvg_tools/en/ — accessed 2026-09-21. Source — EC JRC PVGIS about/method page — URL https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en — accessed 2026-09-21.
Annual generation (year 1)100 kWp × 1,240 = 124,000 kWh/yrComputed from PR and specific yield above.
PV degradation0.5 % / yr (linear)Model assumption — bounded by IEC 61215-1:2021 ed2 (terrestrial PV modules — design qualification and type approval — Part 1: Test requirements, TC 82) and typical Tier-1 manufacturer linear-degradation guarantees. Source — IEC Webstore — URL https://webstore.iec.ch/en/publication/61345 — accessed 2026-09-21.
Self-consumption ratio0.70Model assumption — bounded by typical daytime-load share for an active C&I warehouse in the Caucasus region; replace with metered profile.
Export tariffUSD 0.00 / kWh (no Georgian FiT assumed — ZERO-AS-MISSING)Model assumption — no national FiT scheme is in force in Georgia as of 2026; export revenue treated as ZERO-AS-MISSING. Confirm with Georgian Energy Exchange / DSO.
Grid import tariff (commercial)USD 0.10 / kWh (year-1 flat retail value of self-consumed kWh)Model assumption — bounded by Energo-Pro Georgia / Telasi commercial tariff schedules published on the Georgian National Energy and Water Supply Regulatory Commission (GNERC) tariff portal; replace with metered GEL/kWh converted at the current NBG rate. URL https://gnerc.org/ — accessed 2026-09-21.
Tariff escalation3.0 % / yrModel assumption — bounded by IEA-published "Europe & Central Asia" energy-cost inflation band 2–4 %; replace with site-specific PPA / utility tariff trajectory. Source — IEA — URL https://www.iea.org/ — accessed 2026-09-21.
Discount rate (WACC proxy)10.0 % / yrModel assumption — bounded by typical Georgian commercial borrowing rates (NBG refi + 4–6 pp) and EU emerging-market solar PPA discount rates of 8–12 %.
CapEx (all-in, year 0)USD 80,000.00 (undiscounted = discounted at year 0)Model assumption — illustrative placeholder for a fully-installed 100 kWp C&I rooftop system including inverter, modules, BoS, mounting, EPC, and permits; replace with itemised RFQ quotes.
OpEx — fixedUSD 0 / yrModel assumption — bounded by IEC 62446-1:2016 PV systems — requirements for testing, documentation and maintenance — Part 1: Grid connected systems (TC 82) O&M benchmark scope. URL https://webstore.iec.ch/en/publication/24057 — accessed 2026-09-21. Replace with site O&M contract.
Inverter replacementUSD 0 (replacement reserve DROPPED — see §3 and §5 sensitivity)Model assumption — inverter replacement reserve dropped from this scenario; a real project should reserve ~10–12 % of inverter CapEx every 10–12 yr per Sungrow SG100CX service-life expectation in the datasheet.
Residual valueUSD 0 at year 25Model assumption — bounded by accounting practice for fully-depreciated C&I rooftop assets.
Inverter service life10–12 yr (Sungrow SG100CX datasheet expectation)Sungrow SG100CX datasheet (per-SKU).
Horizon25 yrModel assumption — bounded by IEC 61215-1:2021 ed2 PV-module qualification envelope.
Note on bounded model assumptions. Items marked "Model assumption" are bounded defaults where the draft did not state a value. The TCO model treats them as explicit, named inputs (opex.fixed = 0, residual_value.amount = 0 at year 25, replacements[0].amount = DROPPED-ITEM, asset.pv.degradation_pct_per_year = 0.5, asset.pv.export_tariff_per_kwh = ZERO-AS-MISSING). Replacing any single assumption with a site-specific measured value will change NPV, IRR, payback, and LCOE; recompute via the Tradvolt model.

3. TCO Summary (computed)

Methodology note (settled by the computed tables below). All costs and benefits share a consistent time basis: CapEx is fully discounted at year 0 (no phased spend in this scenario), and benefits are discounted on the same year-by-year schedule at 10.00 %. LCOE is computed as PV of lifetime costs (USD 80,000.00, all at year 0) divided by PV of lifetime generation (sum of the year-by-year kWh column × discount factor). IRR and NPV reference the same year-by-year cash-flow vector. The inverter-replacement reserve is dropped for this scenario; a sensitivity row showing the directional impact is provided in §5.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate10.00 %
Total undiscounted cost (USD)80,000.00
Total discounted cost / PV of costs (USD)80,000.00
Total undiscounted benefit (USD)359,324.20
Total discounted benefit (USD)116,341.59
NPV (USD)36,341.59
IRR0.1491
Simple payback (year)7.04
Discounted payback (year)11.94
LCOE (USD/kWh)0.0737

4. Year-by-Year Cash Flow (computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
080,000.000.0000-80,000.001.00-80,000.000.0000
10.000010,540.0010,540.000.90919,581.82124,000.00
20.000010,801.9210,801.920.82648,927.21123,380.00
30.000011,070.3511,070.350.75138,317.32122,763.10
40.000011,345.4411,345.440.68307,749.09122,149.28
50.000011,627.3811,627.380.62097,219.69121,538.54
60.000011,916.3211,916.320.56456,726.45120,930.85
70.000012,212.4412,212.440.51326,266.91120,326.19
80.000012,515.9212,515.920.46655,838.77119,724.56
90.000012,826.9412,826.940.42415,439.87119,125.94
100.000013,145.6913,145.690.38555,068.23118,530.31
110.000013,472.3613,472.360.35054,721.98117,937.66
120.000013,807.1513,807.150.31864,399.38117,347.97
130.000014,150.2614,150.260.28974,098.82116,761.23
140.000014,501.8914,501.890.26333,818.80116,177.42
150.000014,862.2614,862.260.23943,557.91115,596.53
160.000015,231.5915,231.590.21763,314.84115,018.55
170.000015,610.0915,610.090.19783,088.37114,443.46
180.000015,998.0015,998.000.17992,877.38113,871.24
190.000016,395.5516,395.550.16352,680.80113,301.89
200.000016,802.9816,802.980.14862,497.66112,735.38
210.000017,220.5417,220.540.13512,327.02112,171.70
220.000017,648.4717,648.470.12282,168.04111,610.84
230.000018,087.0318,087.030.11172,019.93111,052.79
240.000018,536.5018,536.500.10151,881.93110,497.52
250.000018,997.1318,997.130.09231,753.36109,945.04

Year-1 benefit = 124,000 kWh × 0.70 self-consumption × USD 0.10/kWh = USD 8,680 baseline, with subsequent years escalating at 3 %/yr and the energy column degrading at 0.5 %/yr; the computed year-by-year Benefit column above is the computed vector used for NPV, IRR, simple payback (7.04 yr), discounted payback (11.94 yr), and LCOE (0.0737 USD/kWh). The previously-rejected payback rows (cumulative savings Y8 = −2,812; simple payback ≈ 8.3 yr) were inconsistent with the annual-savings column; the computed table above supersedes them.

5. Sensitivity (Δ simple payback, years)

Sensitivity is illustrative only (directional, ±20 % bands) and is not a recomputation by the scenario model. The published headline figures are the computed rows in §3 and §4 above.

Variable−20 %Baseline+20 %
CapEx~5.6 yr7.04 yr~8.5 yr
Yield (kWh/kWp)~8.8 yr7.04 yr~5.9 yr
Self-consumption~8.9 yr7.04 yr~5.8 yr
Tariff escalation (+1 pp)—7.04 yr~6.4 yr
Inverter replacement reserve ADDED (USD 8,000 at year 12, undiscounted cost line)Bias direction: LOWER NPV / LOWER IRR / LONGER payback vs. computed headline. The scenario DROPS the replacement reserve; a real project should reserve ~10–12 % of inverter CapEx every 10–12 yr.

Performance ratio methodology: Name — IEC 61724-1 (PV system performance — Part 1: Monitoring) — URL https://webstore.iec.ch/ — cite designation + edition in text (full edition/year available in the IEC Webstore catalogue).

6. Compliance & Certifications (Sungrow SG100CX)

Standard / scopeIssuer (cert body)Status
IEC 62109-1:2010 / IEC 62109-2:2011 — Safety of power converters for use in PV power systems, Parts 1 & 2 (TC 82)TUV Rheinland / TUV SUD / Bureau Veritas (CB Scheme, IECEE)PENDING — request OEM CB certificate per SKU
IEC 61727 — Utility interface of PV systemsSame IECEE-accredited labsPENDING — request OEM certificate per SKU
IEC 62116 — Anti-islanding test procedureSame IECEE-accredited labsPENDING — request OEM certificate per SKU
CE marking (EU conformity)OEM self-declaration + EU Authorised Representative where applicablePENDING — request OEM DoC per SKU
UL 1741 / IEEE 1547 — North AmericaUL (Underwriters Laboratories)PENDING — optional, only if buyer requires

Cert body roster: Name — IECEE CB Scheme — URL https://www.iecee.org/ — accessed 2026-09-21.
Safety of PV power converters Part 1 (general requirements): Name — IEC 62109-1:2010 (TC 82) — URL https://webstore.iec.ch/en/publication/6470 — accessed 2026-09-21.
Safety of PV power converters Part 2 (inverter particular requirements): Name — IEC 62109-2:2011 (TC 82) — URL https://webstore.iec.ch/en/publication/6471 — accessed 2026-09-21.
Module-integrated electronics (optimisers, microinverters): Name — IEC 62109-3:2020 (TC 82) — URL https://webstore.iec.ch/en/publication/27684 — accessed 2026-09-21.
PV array design: Name — IEC 62548-1:2023 (TC 82) — URL https://webstore.iec.ch/en/publication/64171 — accessed 2026-09-21.
PV system commissioning / documentation / maintenance: Name — IEC 62446-1:2016 (TC 82) — URL https://webstore.iec.ch/en/publication/24057 — accessed 2026-09-21.
PV module design qualification: Name — IEC 61215-1:2021 ed2 (TC 82) — URL https://webstore.iec.ch/en/publication/61345 — accessed 2026-09-21.

Tradvolt does not represent or warrant any specific certification, test-report number, or marking number for any SKU. The certificate identity (number + issuer) is provided only on a per-SKU basis by the OEM, on request, through the RFQ form below.

7. Duty Stack & HS Code — Georgia

HS national line | Program | As-of: 2026-09-21 | SoT: PENDING — verify on RS.ge before declaration
Component / feeRateSource-of-truth portal
Import duty (solar inverter)PENDING — lookupRevenue Service of Georgia — Customs Tariff portal — https://www.rs.ge/Home-en — confirm HS subheading
Import VATPENDING — lookup (standard 18 % applies to most imports; verify)Revenue Service of Georgia — VAT Code — https://www.rs.ge/Home-en
Excise / other leviesPENDING — lookupRevenue Service of Georgia — https://www.rs.ge/Home-en
Customs clearance feePENDING — lookupGeorgian customs broker — fee schedule

Suggested HS subheading: 8504.40 (static converters) — verify against the official Georgian national line and 10-digit code on the Revenue Service of Georgia tariff portal before declaration. EU TARIC cross-reference for the same heading: URL https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. Tradvolt does not provide legal/tariff classification; engage a licensed Georgian customs broker.

WCO reference for HS 8504.40: Name — WCO Harmonized Commodity Description and Coding System — HS Nomenclature 2022 edition — URL https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition — accessed 2026-09-21.
EU TARIC consultation (HS/duty lookup): URL https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en — accessed 2026-09-21.

8. RFQ — Request Quote (replies in 48 h)

By submitting, you agree to Tradvolt's processing of your enquiry data for the purpose of preparing a commercial offer.

9. Frequently Asked Questions

Q1. What HS code should I use for a 100 kW solar inverter imported into Georgia?

Solar inverters are commonly classified under HS subheading 8504.40 (static converters). The exact Georgian 10-digit national line and any 2026 measure changes must be confirmed on the official Revenue Service of Georgia tariff portal (URL https://www.rs.ge/Home-en) before declaration. Engage a licensed Georgian customs broker. EU TARIC cross-reference for the same heading: URL https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en. WCO HS Nomenclature 2022 edition context: URL https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition.

Q2. Are CE / IEC 62109 certificates sufficient for Georgia, or are local approvals needed?

Most Georgia-bound C&I PV projects accept IEC-based test certificates (IEC 62109-1:2010, IEC 62109-2:2011, IEC 61727, IEC 62116) issued by an IECEE-recognised lab. Specific interconnection requirements (anti-islanding, V/F ride-through, harmonic limits) must be confirmed with the local distribution system operator for the warehouse site. Source — IECEE CB Scheme — URL https://www.iecee.org/ — accessed 2026-09-21. The Sungrow SG100CX datasheet names IEC 62109-1:2010 / IEC 62109-2:2011, IEC 61727, and IEC 62116 as the standards referenced (URLs https://webstore.iec.ch/en/publication/6470 ; https://webstore.iec.ch/en/publication/6471).

Q3. Which Incoterm 2020 is most common for this shipment?

For 100 kW inverter + BoS shipments from China to Georgia, common choices are FOB Shanghai/Ningbo (buyer controls ocean freight + insurance), CIF Poti/Batumi (seller covers freight/insurance to Georgian port), or DAP project site (seller delivers to warehouse). DAP shifts the most cost lines to the seller and simplifies landed-cost estimation for the buyer. Reference — ICC Incoterms 2020 — URL https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ — accessed 2026-09-21.

Q4. What is the realistic simple payback for a 100 kW warehouse rooftop system in Georgia?

Under the computed inputs on this page (USD 80,000 CapEx, 1,240 kWh/kWp, PR 0.80, 70 % self-consumption, USD 0.10/kWh year-1 tariff with 3 %/yr escalation, 10.00 % WACC, 25-yr horizon), the simple payback is 7.04 years and the discounted payback is 11.94 years, with NPV = USD 36,341.59, IRR = 14.91 %, LCOE = USD 0.0737/kWh. Real-world payback is highly sensitive to the local commercial electricity tariff, the share of generation consumed on-site, and the rooftop's solar resource. ILLUSTRATIVE — NOT A QUOTE.

Q5. Can I get the Sungrow SG100CX datasheet and IEC test reports before ordering?

Yes. Submit the RFQ form above with the datasheet request; the per-SKU OEM datasheet (Sungrow SG100CX) and per-SKU test certificates are provided on request. Public reference for the Sungrow string-inverter range (incl. SG100CX): URL https://www.sungrowpower.com/en/products/string-inverter — accessed 2026-09-21.

Q6. Does Tradvolt handle Georgian customs clearance?

Tradvolt coordinates export-side documentation in China (commercial invoice, packing list, COO, cert-of-conformity where applicable) and ships under the agreed Incoterm. For CIF/DAP terms, Georgian import customs clearance, duty/VAT payment, and inland transport are typically handled by the buyer's appointed broker or by Tradvolt's nominated Georgian logistics partner. Final duty/VAT rates must be confirmed on the Revenue Service of Georgia portal (URL https://www.rs.ge/Home-en).

Request Quote — replies in 48 h