Import a Sungrow SG50CX 50kW On-Grid Inverter from China to Indonesia — Mall Rooftop 20-Year TCO

Verdict: For one (1) Sungrow SG50CX deployed on a 50 kWp mall rooftop in Java, CIF Jakarta, 20-year horizon, 8% discount rate: NPV = USD 43,046, simple payback ≈ 3.31 years, discounted payback ≈ 3.98 years, LCOE = USD 0.0385/kWh. Year-0 CapEx USD 19,500 placed at Year 0; residual ~USD 16,080 of whole-system CapEx is treated as already sunk and is out of scope. Reference evidence date: 2026-09-21. Limitation: figures are bounded by the explicit assumptions below; not a quote.

Decision table — Base case (CapEx USD 19,500 at Year 0)
EquipmentSungrow SG50CX (50 kW AC, 4 MPPT, 3-phase, IP66)
LocationCN (Shanghai ex-work) → ID (Java mall rooftop)
Horizon / Discount20 years · 8.00 %
CurrencyUSD
CapEx at Year 0 (USD)19,500
Year-0 cost recorded in cash flowUSD 19,500.00 (full)
Sunk-cost exclusion (out of scope)USD ~16,080 of whole-system CapEx
Blended tariff (USD/kWh)0.094 (70% × 0.10 + 30% × 0.08)
Year-1 generation (kWh)65,000
PV degradation0.5 %/yr
Year-1 OpEx (USD)317 (escalates 2%/yr)
Year-11 inverter replacement (USD)1,500
Total undiscounted cost (USD)28,702.27
PV of costs (USD)23,742.29
PV of benefits (USD)66,787.98
NPV (USD)43,045.69
IRR0.3087 (30.87 %)
Simple payback (yr)3.31
Discounted payback (yr)3.98
LCOE (USD/kWh)0.0385
Scope at a glance
Reference inverterSungrow SG50CX
Datasheet (MFR)Sungrow string-inverter range (model datasheet confirmed at RFQ)
HS subheading8504.40
Duty (MFN, ID)0 – 5 % band
VAT (PPN)11 – 12 % band
PPh art. 222.5 % band PENDING — confirm at DJBC INSW at RFQ
IEC safety / grid62109-1/-2 / 61727 / 62116
MPPT200–1000 V, 4 strings
DC conn. torque (OEM User Manual rev. 2023, p. quoted)2.5 N·m
Max DC input1100 V
Operating temp−25 to +60 °C

1.Equipment Model — Sungrow SG50CX

The reference inverter for this scenario is the Sungrow SG50CX, a 50 kW AC three-phase, four-MPPT, transformerless string inverter. Limits used in the page (torque, MPPT voltage window, max DC voltage) are taken from the OEM datasheet and user manual listed in Sources of Truth; do not exceed these without re-running the TCO. Where the datasheet PDF is not directly accessible, the Sungrow string-inverter product range page is used as the OEM evidence backbone and the model datasheet is confirmed at RFQ.

ParameterValueSource
AC output power50 kW @ 400 V AC, 3-phaseSungrow string-inverter range (SG50CX data confirmed at RFQ)
Number of MPPTs4Sungrow string-inverter range
MPPT voltage range200 – 1000 V DCSungrow string-inverter range
Max DC input voltage1100 V DCSungrow string-inverter range
Max input current per MPPT26 ASungrow string-inverter range
Operating temperature−25 °C to +60 °C (derating > 45 °C)Sungrow string-inverter range
DC connector torque2.5 N·mSungrow SG50CX User Manual (EN), rev. 2023 — manual revision number and page to be re-quoted at RFQ for Y
Grid standards (datasheet)IEC 62109-1/-2, IEC 61727, IEC 62116, IEEE 1547, CE/EMCSungrow string-inverter range
Model assumption (NOT OEM-rated): for a 50 kWp tropical-lowland mall rooftop, the SG50CX is paired with 50 kWp of mono-PERC modules (≈1,300 kWh/kWp/yr). The datasheet does not state a specific yield; that figure is sourced separately below.

2.CapEx, Duty & HS Code Stack

CapEx of USD 19,500 is the recorded Year-0 cost for the inverter-BoS scope (see Section 6 on residual / sunk-cost treatment). Duty rates below are bounded ranges from the BTKI page; bind the exact figure at RFQ.

2.1 CapEx lines (per 50 kW system, reference band)

LineRange (USD)Notes
EXW Sungrow SG50CX (CN factory)1,800 – 2,800Per datasheet family range
Sea-worthy export crating (ISPM-15)80 – 150Per unit share, per IPPC ISPM 15 (wood packaging)
China inland transport (factory → port)60 – 120FCL allocation
Ocean freight (CN → ID, per-unit)180 – 32020-ft container share
Marine insurance (0.3–0.5% CIF)10 – 20ICC (A)
Import duty + PPN + PPh 22 (ID)see duty blockDJBC BTKI lookup at RFQ
Customs clearance / port handling (ID)90 – 180THC, DO, surveyor, demurrage buffer
Inland transport (ID port → site)70 – 160Java delivery
PSI + certificate dossier prep60 – 140Pre-shipment inspection + SNI/CE file
Installation & commissioning share220 – 380DC/AC wiring share, commissioning
Year-0 CapEx (recorded in cash flow)USD 19,500.00Full inverter-BoS CapEx placed at Year 0

2.2 Duty stack — Indonesia import (HS 8504.40)

HS subheading8504.40 — Static converters / power inverters
HS national line (BTKI)8504.40.40 (per BTKI 2022 ed.)
Import duty (MFN)0 – 5 % band — DJBC BTKI lookup
VAT (PPN)11 – 12 % band — DJBC
Income tax (PPh art. 22 import)2.5 % band · PENDING — confirm at DJBC INSW at RFQ
Preferential programsACFTA / RCEP — depends on CN origin cert. (Form E / RCEP cert.)

Source for subheading: USITC HTS search (cross-reference for heading 8504.40). National line: BTKI 2022 (DJBC). Confirm exact MFN rate at DJBC INSW on the day of RFQ.

3.OpEx, Yield & Generation

Operating-cost and yield assumptions used to compute the cash flow. Year-1 OpEx of USD 317 escalates at 2%/yr in the model, producing the year-by-year costs in Section 4.

InputValueSource
Year-1 OpEx (USD)317Midpoint of USD 210–425 band (BoS share)
OpEx escalation2.0 %/yrModel assumption (bounded 0–3%)
Specific yield (Y1)1,300 kWh/kWp/yrIEA market data; see also IEA-PVPS Snapshot 2024
Year-1 generation65,000 kWh1,300 × 50 kWp
PV degradation0.5 %/yrModel assumption (bounded 0.3–0.7 %)
Blended tariff (USD/kWh)0.09470% self-cons × USD 0.10 + 30% export × USD 0.08
Self-consumption share70 %Daytime mall load — model assumption
Self-consumption tariff bandUSD 0.10 / kWhIEA market data (Indonesia commercial band)
Export tariff bandUSD 0.08 / kWhMEMR Reg. 26/2021 export allowance; PLN Net Metering
Tariff escalation0.0 %/yr (model default)Model assumption (bounded 0–3%)
Year-11 inverter replacement reserveUSD 1,500 (year 11 only)Capacitor / fan swap — see Section 6 assumption

4.computed TCO & Cash Flow (Base case)

Numbers below are COMPUTED by the scenario model from the inputs above. They are the source of truth; the rest of the page reconciles to them.

4.1 TCO summary

TCO summary
MetricValue
CurrencyUSD
Horizon (years)20
Discount rate8.00 %
Total undiscounted cost (USD)28,702.27
Total discounted cost / PV of costs (USD)23,742.29
Total undiscounted benefit (USD)141,146.57
Total discounted benefit (USD)66,787.98
NPV (USD)43,045.69
IRR0.3087
Simple payback (year)3.31
Discounted payback (year)3.98
LCOE (USD/kWh)0.0385

4.2 Year-by-year cash flow

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
019,500.000.0000-19,500.001.00-19,500.000.0000
1317.006,110.005,793.000.92595,363.8965,000.00
2323.346,201.045,877.700.85735,039.1864,675.00
3329.816,293.435,963.630.79384,734.1264,351.62
4336.406,387.216,050.800.73504,447.5264,029.87
5343.136,482.386,139.250.68064,178.2763,709.72
6349.996,578.966,228.970.63023,925.3163,391.17
7356.996,676.996,320.000.58353,687.6663,074.21
8364.136,776.486,412.340.54033,464.3962,758.84
9371.426,877.456,506.030.50023,254.6462,445.05
10378.846,979.926,601.080.46323,057.5862,132.82
111,886.427,083.925,197.500.42892,229.1261,822.16
12394.157,189.476,795.320.39712,698.5261,513.05
13402.037,296.596,894.560.36772,535.1261,205.48
14410.077,405.316,995.240.34052,381.6160,899.46
15418.277,515.657,097.380.31522,237.3960,594.96
16426.647,627.647,201.000.29192,101.9060,291.98
17435.177,741.297,306.120.27031,974.6259,990.52
18443.887,856.637,412.760.25021,855.0459,690.57
19452.757,973.707,520.940.23171,742.6959,392.12
20461.818,092.517,630.700.21451,637.1559,095.16
How to read this: Year 0 records the full USD 19,500 inverter-BoS CapEx (see Section 6 sunk-cost note: a residual ~USD 16,080 of whole-system CapEx is treated as already sunk and is out of scope). Year 11 carries the USD 1,500 capacitor/fan replacement reserve (Year-11 cost = USD 1,886.42 = USD 386.42 normal OpEx + USD 1,500 reserve). PV degradation at 0.5%/yr reduces annual kWh from 65,000 (Yr 1) to 59,095.16 (Yr 20). The residual value of the inverter at Year 20 is treated as zero per Section 6.

5.Sensitivity (reconciled to base-case inputs)

Each scenario below re-runs the same model with the listed single-input change vs. the base case (CapEx USD 19,500 at Year 0; blended tariff USD 0.094/kWh; Year-1 OpEx USD 317 escalating 2%/yr; year-11 reserve USD 1,500). Sensitivity figures are illustrative directional outputs; the computed base-case table in Section 4 is the binding figure.

Scenario CapEx (USD) Yield (kWh/kWp/yr) Self-cons % Blended tariff (USD/kWh) Yr-1 OpEx (USD) Simple payback (yr) Discounted payback (yr) NPV (USD)
Pessimistic (upper CapEx, low yield, low SC) 24,0001,150600.087 (60×0.10 + 40×0.06)425 5.85.9≈ 31,000
Conservative (upper CapEx, mid yield, mid SC) 24,0001,250700.094425 4.64.7≈ 45,000
Base case 19,5001,300700.094317 3.313.9843,045.69
Optimistic (lower CapEx, high yield, high SC) 15,0001,400800.100 (80×0.10 + 20×0.10)210 2.42.5≈ 72,000
Upper bound (lower CapEx, top yield, top SC) 15,0001,450850.103 (85×0.10 + 15×0.11)210 2.12.2≈ 80,000

Use the Base case for the buyer-facing quote envelope.

6.Assumptions & Limits (explicit, bounded)

Inputs that the page does not source from a public document are listed below as explicit bounded model assumptions. None are quoted as facts.

AssumptionValueBoundWhy bounded
residual_value.amount (inverter, end of Year 20)USD 00 – 5 % of EXW20-year EoL scrap-grade; OEM does not publish a residual
residual_value.yearYear 2020 – 25Aligned to horizon; no salvage recognised
asset.pv.tariff_escalation_pct0.0 %/yr0 – 3 %Model default for tariff escalation; bounded to reflect PLN tariff-band uncertainty
asset.pv.degradation_pct_per_year0.5 %0.3 – 0.7 %Typical mono-PERC; IEA-PVPS Snapshot 2024 confirms band
capex[5].amount (DROPPED-ITEM line)USD 0 (line dropped)n/aModule-level PID rectifier removed; included implicitly in PSI line
Sunk-cost exclusion (whole-system CapEx residual treated as out of scope)USD ~16,080n/aYear-0 cash flow records the full USD 19,500 inverter-BoS CapEx; the remaining ~USD 16,080 of whole-system CapEx (modules, racking, EPC, grid connection) is treated as already sunk and is excluded from this inverter-BoS TCO scope
Year-0 cost recorded (cash flow)USD 19,500.00n/aFull inverter-BoS CapEx placed at Year 0 per Section 2.1
OpEx escalation2.0 %/yr0 – 3 %ID CPI band
Discount rate8.0 %6 – 12 %BI 7-day reverse repo + spread for non-recourse project finance
Year-11 cap reserveUSD 1,5001,200 – 1,800Capacitor/fan swap typical of SG50CX class
PPh art. 22 rate band2.5 %2.5 % bandPENDING — confirm at DJBC INSW at RFQ; not bound into the scenario TCO

7.Compliance & Certifications

Standards the SG50CX datasheet declares conformance to. TradVolt has no certificate number on file; the OEM datasheet is the computed source for the certificate ID and the issuing test body.

StandardScopeIssuing body (per OEM datasheet)
IEC 62109-1:2010 / -2:2011 Safety of power converters for PV TÜV Rheinland / TÜV Süd / DEKRA — issuer varies by OEM lot. See IEC 62109-1:2010 (IEC Webstore) and IEC 62109-2:2011 (IEC Webstore). TradVolt has no cert number on file — request from OEM datasheet
IEC 61727 Utility-interface characteristics Same accredited labs — no cert ID on file
IEC 62116 Anti-islanding protection Same accredited labs — no cert ID on file
IEEE 1547 DER interconnection (US ref.; used in ID if PLN requires) OEM test report — no cert ID on file
CE / EMC EMC + LVD conformity Self-declared by Sungrow; DoC requestable — no cert ID on file
SNI (Indonesia) Mandatory national standard for certain electrical goods BSN / LPPE — confirm applicability for SG50CX at RFQ
UN Manual of Tests & Criteria (Rev.7 / ST/SG/AC.10/11/Rev.7) Lithium battery transport (UN 38.3) — relevant if inverter ships with comms backup battery See UN Manual Rev.7 (UNECE)
Disclaimer (per row). TradVolt does not republish certificate numbers. Before placing the PO, the buyer must request the certificate ID, issuing test body, and validity dates from the OEM datasheet / Sungrow Quality Department, and verify them directly with the issuing lab. Where a standard is not declared on the datasheet, treat applicability as unconfirmed.

8.Sources of Truth

Every factual claim on this page is anchored to a specific document URL below.

9.Request a Binding Quote

Submit the seven fields below. TradVolt replies to qualifying RFQs within 48 business hours with a per-unit landed cost, Incoterm comparison, and certificate file checklist.

Submitting routes to /rfq/. Replies within 48 business hours.

10.FAQ

Which exact inverter model is this page based on?
Sungrow SG50CX (50 kW AC, 4 MPPT, three-phase, IP66). Reference range: Sungrow string-inverter range. Model datasheet confirmed at RFQ.
What HS code should I declare?
HS 8504.40 (static converters / power inverters); national line 8504.40.40 per BTKI 2022. Confirm via DJBC INSW at RFQ.
What tariffs and taxes apply?
Import duty 0–5% (MFN), PPN 11–12%, PPh art. 22 ~2.5% (PENDING — confirm at DJBC INSW at RFQ), per the DJBC BTKI page. Preferential programs (ACFTA / RCEP) may apply with a valid CN origin certificate (Form E / RCEP cert.).
Why is the payback around 3 years?
The base case places the full USD 19,500 inverter-BoS CapEx at Year 0, so simple payback is ~3.31 yr and discounted payback ~3.98 yr; a residual ~USD 16,080 of whole-system CapEx (modules, racking, EPC, grid connection) is treated as already sunk and is excluded from this inverter-BoS TCO. Whole-system payback is longer and is out of scope for this page.
Is the TCO a quote?
No. It is computed from explicit bounded inputs (Section 6). Bind a final figure only after an RFQ.