Headline TCO verdict (illustrative, computed): NPV ≈ USD 698,268; simple payback ≈ 5.41 yr; discounted payback ≈ 6.97 yr; LCOE ≈ USD 0.1457/kWh; IRR ≈ 18.57% on a 20-year horizon at a 7.00% discount rate with stated inputs. Illustrative payback band ~4.0–7.2 yr across a CapEx band of 450,000–800,000 NZD-equivalent on the same operating envelope. All figures ILLUSTRATIVE — NOT A QUOTE; firm pricing via RFQ. Equipment: Sungrow SG350HX, 350 kW on-grid string inverter, manufactured by Sungrow Power Supply Co., Ltd. (Hefei, CN). Location: New Zealand (commercial rooftop, stadium). Horizon: 20 yr. Discount rate: 7.00%/yr. Evidence date: 2026-09-22. Limitation: no PVSyst site-specific yield, no firm EPC quote, no confirmed NZ Customs Working Tariff ruling for HS 8504.40 — all marked PENDING.

Decision summary (computed from page scenario)
ItemValue
Equipment / OEMSungrow SG350HX — Sungrow Power Supply Co., Ltd.
Site / countryStadium rooftop, New Zealand
DC system size350 kWp (DC/AC ≈ 1.0)
Horizon / discount rate20 yr / 7.00%
Total undiscounted costUSD 625,000.00 (Day-0 CapEx, model assumption)
Total undiscounted benefit (20 yr)USD 2,580,833.88
PV of benefitsUSD 1,323,268.15
NPVUSD 698,268.15
IRR18.57%
Simple payback5.41 yr
Discounted payback6.97 yr
LCOEUSD 0.1457/kWh
Illustrative payback band~4.0–7.2 yr (CapEx 450k–800k NZD-equivalent on same envelope)
VerdictPositive NPV on stated inputs; site-specific yield, tariff and finance terms to be confirmed via RFQ.

OEM datasheet reference: Sungrow SG350HX product family datasheet, published by Sungrow Power Supply Co., Ltd. — see Sungrow product portal for current revision (datasheet PDF returned by the manufacturer behind a JS-rendered product page; revision, cert numbers and torque/SOC limits confirmed at RFQ).

Request a firm quote

RFQ form is the only Tradvolt channel that returns a binding quote.

Open Tradvolt RFQ form →

1. System definition (inputs)

ParameterValueUnitSource / Note
DC system size350kWpUse-case definition, stadium rooftop
Inverter AC output (per unit)350kWSungrow SG350HX product family datasheet — OEM portal sungrowpower.com/en; specific datasheet PDF revision confirmed at RFQ
Inverter topologyOn-grid, transformerless string inverter—Sungrow SG350HX datasheet, OEM portal sungrowpower.com/en
Grid interface standardAS/NZS 4777.2:2020 (inverter requirements); AS/NZS 4777.1:2016 (installation)—Claim: AS/NZS 4777.2:2020 is the standard for inverter-connected generation in NZ. Src: Standards New Zealand — AS/NZS 4777.2:2020 record. URL: standards.govt.nz — AS/NZS 4777.2:2020. accessed: 2026-09-22.
Product safety standardIEC 62109-1 / IEC 62109-2—Claim: IEC 62109 is the base safety standard for PV power converters. Src: IEC Webstore — IEC 62109-1 publication page. URL: webstore.iec.ch — IEC 62109-1. accessed: 2026-09-22.
Performance / utility interfaceIEC 61683, IEC 61727—Claim: IEC 61683 and IEC 61727 define measurement procedures and utility-interface characteristics for PV inverters. Src: IEC Webstore. URL: webstore.iec.ch — IEC 61683 and webstore.iec.ch — IEC 61727. accessed: 2026-09-22.
Annual energy yield reference1 200kWh/kWp/yrIndicative NZ-specific yield range; site-specific PVSyst result overrides. Src: PENDING — model assumption
Self-consumption assumption90%Stadium daytime-match load profile (day-loaded venue) — model assumption
Electricity price assumption0.28NZD/kWhILLUSTRATIVE — NZ commercial tariff, retailer-dependent. Src: PENDING — model assumption
PV module (companion) reference familyLONGi Hi-MO 5 / Hi-MO 6 (550 Wp class) or Jinko Tiger Neo (550 Wp class)—OEM portals: longi.com/en, jinkosolar.com/en; specific SKU and datasheet revision confirmed at RFQ
Discount rate (WACC)7.00% / yrModeller input
Analysis horizon20yrModeller input

2. CapEx — Indicative landed cost (per site, 350 kW)

All values ILLUSTRATIVE — NOT A QUOTE. Duty and GST rates marked PENDING — lookup. The CapEx line items below are model assumptions; only the Day-0 total of USD 625,000 is used by the COMPUTED tables.

Line itemQtyUnitUnit value (USD)Subtotal (USD)Source / Note
Sungrow SG350HX, on-grid string inverter, 350 kW class1unitPENDING — lookupIncluded in Day-0 totalOEM unit price varies by region, warranty pack and configuration. Confirm via RFQ. Datasheet portal: sungrowpower.com/en
PV modules (LONGi Hi-MO 6 or Jinko Tiger Neo, 550 Wp class)636pcsPENDING — lookupIncluded in Day-0 totalIndicative DC/AC ratio ~1.0. OEM portals: longi.com/en, jinkosolar.com/en
Mounting structure, rooftop ballasted / fixed1lotPENDING — lookupIncluded in Day-0 totalRooftop-specific (wind load per AS/NZS 1170.2)
DC cabling, AC cabling, combiner boxes1lotPENDING — lookupIncluded in Day-0 totalBoS passive
MV transformer + switchgear (if required by lines co.)1lotPENDING — lookupIncluded in Day-0 totalFunction of point-of-connection voltage
Freight, sea, CN → NZ (LCL/FCL)1lotPENDING — lookupIncluded in Day-0 totalOrigin port (e.g. Shanghai/Ningbo) → Tauranga / Auckland / Lyttelton
Marine insurance——~0.3% of CIFIncluded in Day-0 totalIndustry typical; confirm with broker
Customs broker / clearance fees (NZ)——PENDING — lookupIncluded in Day-0 totalPer NZ Customs Service guidance for the entry type
Installation & commissioning labour (NZ)——PENDING — lookupIncluded in Day-0 totalLocal EPC scope
Day-0 CapEx (total, model assumption)———USD 625,000.00Single Year-0 outflow used by the COMPUTED tables

2.1 Duty / GST stack — NZ import (lookup pending)

HS national lineProgramAs-ofSoT
8504.40 (candidate — Static converters; static inverters)Working Tariff Document (NZ Customs Service) — MFN duty2026-09-22PENDING — exact 10-digit line, applicable rate and any concession to be confirmed on the NZ Working Tariff Document at the time of shipment. Src: NZ Customs Service Working Tariff Document — Section 85, Chapter 8504.40. URL: customs.govt.nz — Working Tariff Document. accessed: 2026-09-22.
8504.40 (candidate)GST on imported goods (15.0% standard rate, basis = VFD)2026-09-22PENDING — confirm on the IRD GST schedule at the time of entry. Src: NZ Inland Revenue — Goods and Services Tax (GST). URL: ird.govt.nz — GST. accessed: 2026-09-22.
8504.40 (candidate)China–NZ FTA (FORM N) preferential duty, if origin and certificate meet rules2026-09-22PENDING — confirm on the China–NZ FTA rules of origin chapter at the time of entry. Src: MFAT — China–NZ FTA rules of origin chapter (Chapter 3). URL: mfat.govt.nz — China–NZ FTA. accessed: 2026-09-22.

All duty / GST rates on this page are PENDING — lookup. The COMPUTED TCO tables do not load any duty or GST figure: the only Cost line in the cash flow is the Year-0 Day-0 outflow of USD 625,000.00 (model assumption).

3. OpEx — Indicative annual operating cost (model assumption)

The COMPUTED tables do not load any annual OpEx line: every annual row in the cash-flow table carries Cost = 0.0000. The OpEx line items below are model assumptions documenting the boundary of the model and the line items that would be quantified in a firm quote.

Line itemAnnual (USD/yr)Source / Note
Sungrow OEM service / extended warranty0.00 (not loaded)Optional 5→10 yr extension pack, region-dependent. Confirm via Sungrow warranty letter.
Preventive maintenance (annual site visit, thermography, sample-string IV curve)0.00 (not loaded)Local EPC scope
Module cleaning (rooftop, rainfall-dependent)0.00 (not loaded)Stadium roof — access and water-use rules apply
Monitoring SaaS / SCADA communications0.00 (not loaded)Sungrow iSolarCloud or third-party
Insurance (all-risk, property)0.00 (not loaded)Typically ~0.1–0.3% of replacement value / yr
Inverter replacement reserve (sinking fund)0.00 (not loaded)Reserve annualised over inverter service life

4. Computed TCO tables (computed)

The tables below are the only arithmetic on the page. Prose in this section is limited to restating inputs and the verbatim figures; no worked derivations, no closed-form checks, no other financial figures.

4.1 Inputs used by the COMPUTED model

4.2 TCO summary

TCO summary
MetricValue
CurrencyUSD
Horizon (years)20
Discount rate7.00 %
Total undiscounted cost (USD)625,000.00
Total discounted cost / PV of costs (USD)625,000.00
Total undiscounted benefit (USD)2,580,833.88
Total discounted benefit (USD)1,323,268.15
NPV (USD)698,268.15
IRR0.1857
Simple payback (year)5.41
Discounted payback (year)6.97
LCOE (USD/kWh)0.1457

4.3 Year-by-year cash flow

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0625,000.000.0000-625,000.001.00-625,000.000.0000
10.0000111,720.00111,720.000.9346104,411.21420,000.00
20.0000113,384.63113,384.630.873499,034.53417,900.00
30.0000115,074.06115,074.060.816393,934.71415,810.50
40.0000116,788.66116,788.660.762989,097.51413,731.45
50.0000118,528.81118,528.810.713084,509.41411,662.79
60.0000120,294.89120,294.890.666380,157.57409,604.48
70.0000122,087.29122,087.290.622776,029.83407,556.45
80.0000123,906.39123,906.390.582072,114.65405,518.67
90.0000125,752.59125,752.590.543968,401.08403,491.08
100.0000127,626.31127,626.310.508364,878.74401,473.62
110.0000129,527.94129,527.940.475161,537.79399,466.25
120.0000131,457.90131,457.900.444058,368.88397,468.92
130.0000133,416.63133,416.630.415055,363.16395,481.58
140.0000135,404.53135,404.530.387852,512.21393,504.17
150.0000137,422.06137,422.060.362449,808.08391,536.65
160.0000139,469.65139,469.650.338747,243.20389,578.97
170.0000141,547.75141,547.750.316644,810.39387,631.07
180.0000143,656.81143,656.810.295942,502.87385,692.92
190.0000145,797.30145,797.300.276540,314.17383,764.45
200.0000147,969.68147,969.680.258438,238.18381,845.63

4.4 Headline read-out

5. Sensitivity (illustrative — qualitative only)

No quantitative sensitivity is recomputed outside the COMPUTED tables. The table below restates the directional effect on payback only.

Variable−20 %Base+20 %Effect on payback
Specific yield (kWh/kWp/yr)9601 2001 440Payback scales inversely with yield.
CapEx (NZD-equivalent)−20 %Day-0 625,000 USD ≈ mid-band+20 %Payback scales linearly with CapEx.
Electricity price (NZD/kWh)0.2240.280.336Payback scales inversely with tariff.
Self-consumption (%)7290100Higher self-consumption shortens payback.

ILLUSTRATIVE — NOT A QUOTE. Run a site-specific PVSyst / SAM model and a fixed-price EPC proposal before committing capital.

6. Compliance, certification & grid connection

7. Duty / HS code block

HS national lineProgramAs-ofSoT
8504.40 (Static converters; static inverters — candidate NZ working tariff line)Most-Favoured-Nation (MFN) duty2026-09-22PENDING — confirm on the NZ Customs Service Working Tariff Document, Section 85, Chapter 8504.40
8504.40China–NZ FTA preferential duty (FORM N), if origin and ROO met2026-09-22PENDING — confirm against the China–NZ FTA rules of origin (Chapter 3)
8504.40GST on imported goods (15.0 % standard rate, basis = VFD)2026-09-22PENDING — confirm on the IRD GST schedule at the time of entry

Official portal: NZ Customs Service Working Tariff Document — URL: customs.govt.nz — Working Tariff Document. HS code to look up: 8504.40 (candidate). All duty / GST rates on this page are PENDING — lookup and must be reconfirmed at the time of entry.

8. Request a firm quote

Submit your project details — Tradvolt returns a binding quote against an OEM-confirmed SKU, freight lane and duty ruling.

Open Tradvolt RFQ form →

FAQ

Q1. What HS code applies to a 350 kW on-grid solar inverter imported into New Zealand?

The candidate HS subheading commonly used for static converters (including solar inverters) is 8504.40. The exact 10-digit NZ Working Tariff line, applicable duty rate and GST treatment must be confirmed on the NZ Customs Service Working Tariff Document at the time of shipment. Tradvolt marks the rate as PENDING — lookup.

Q2. Does New Zealand require grid-connection certification for a 350 kW inverter?

Connection of generation equipment to a New Zealand distribution or transmission network is regulated by the Electricity Authority and the relevant lines company under the Electricity Industry Participation Code 2010, Part 6 (Connection of Distributed Generation) and Schedule 6.1 (Technical Code). The typical technical interface requirement for inverter-connected generation is AS/NZS 4777.2:2020 (with AS/NZS 4777.1:2016 for installation). Confirm the exact cert reference and issuer for the specific inverter SKU with the local lines company before procurement.

Q3. What is the indicative payback period for a 350 kW stadium rooftop installation on the Sungrow SG350HX?

On the illustrative inputs stated on this page (350 kWp DC, NZ-specific yield reference, electricity price assumption, fixed OpEx) the COMPUTED model returns simple payback ≈ 5.41 yr, discounted payback ≈ 6.97 yr, NPV ≈ USD 698,268, IRR ≈ 18.57% and LCOE ≈ USD 0.1457/kWh. Across an illustrative CapEx band of 450,000–800,000 NZD-equivalent on the same operating envelope, simple payback sits in the range ~4.0–7.2 yr. ILLUSTRATIVE — NOT A QUOTE; site-specific yield, shading, tariff and finance terms will move the result.

Q4. Is the pricing on this page a firm offer?

No. All unit pricing, freight, duty and OpEx figures on this page are labelled ILLUSTRATIVE — NOT A QUOTE. Use the RFQ form to receive a firm quotation within 48 hours.

Q5. What documents should accompany the shipment for NZ Customs clearance?

Typical set: commercial invoice, packing list, bill of lading or airway bill, certificate of origin (e.g. China–NZ FTA FORM N if applicable), product test certificates (e.g. IEC 62109-1/-2, IEC 61683, IEC 61727, AS/NZS 4777.2) and any lines-company pre-approval letter. Confirm with NZ Customs Service and your customs broker for the consignment.

Q6. What warranty is standard for the Sungrow SG350HX?

Sungrow's published standard warranty for the SG350HX utility-class string inverter is 5 years, with optional extension packs (typically to 10 years) sold separately by region. Confirm the exact term and labour/decommissioning coverage in the Sungrow warranty letter for the specific serial range before procurement.


All figures ILLUSTRATIVE — NOT A QUOTE. Duty, GST and certification outcomes are subject to confirmation against the official portals cited. Computed TCO tables are computed for the stated scenario; everything else is a model assumption. Last reviewed: 2026-09-22.