Vertical: Solar BoS  ·  Use-case: Plant Rooftop 350 kW  ·  Lane: CN → UK  ·  Horizon: 25 years  ·  Discount rate: 8.00%  ·  Currency: GBP  ·  Evidence date: 2026-09-22

Import a 350 kW On-Grid Inverter from China to a UK Plant Rooftop — CapEx, OpEx & Payback

Verdict — DO NOT PROCEED on this 25-year horizon at an 8% discount rate. For the stated scenario (350 kW on-grid inverter on a UK plant rooftop, 420 kWp DC, ~378,000 kWh/yr, 70% self-consumption, 4% electricity-price escalation, 2% OpEx escalation, Year-1 imported tariff £0.30/kWh, Year-1 SEG export £0.075/kWh, initial CapEx band £1,050,000, initial annual OpEx £18,000, zero residual value at end of year 25), the scenario model returns NPV = −£1,492 (effectively zero, slightly negative), simple payback = 12.09 years, discounted payback = — (never within horizon), and LCOE = £0.3299 / kWh. Discounted payback is not reached inside 25 years at 8% WACC; the IRR is 7.99%, marginally below the 8.00% hurdle. The investment is on the knife-edge of acceptability — binding payback, IRR and LCOE will move sharply with the final CapEx band, the actual electricity-tariff path, and the confirmed HS national line.

Equipment: 3-phase string on-grid inverter in the 350 kW AC class (candidate OEM shortlist: Sungrow SG350HX, Growatt MAX 350 KTL3-XL2, Huawei SUN2000-330KTL-H1). Location: United Kingdom, plant rooftop C&I. Horizon: 25 years. Evidence date: 2026-09-22. Limitation: numbers below are MODEL-OUTPUT, illustrative, NOT A QUOTE — submit the RFQ for a binding quote.

Decision metricValueRead
NPV (25 yr, 8% WACC)−£1,492≈ break-even, marginal NEGATIVE
IRR7.99%Below 8.00% hurdle
Simple payback12.09 yearsInside horizon, but only just
Discounted payback— (not reached)NPV never crosses zero inside 25 yr
LCOE£0.3299 / kWhCompare to buy-tariff only

B2B landed-cost and total-cost-of-ownership page for sourcing a three-phase 350 kW string on-grid solar inverter from a Chinese OEM and delivering it to a commercial / industrial rooftop in the United Kingdom. Built for asset owners, EPCs and procurement managers evaluating CN-sourced BoS components for G99 / UKCA compliant plants.

Request Quote — replies in 48h Download TCO model (CSV)
350 kWAC output (rated)
~12.09 yrSimple payback (illustrative, base)
NPV ≈ £025-yr, 8% WACC — knife-edge
UKCA / G99Target compliance set

1 · Equipment profile — 350 kW on-grid string inverter (candidate OEM shortlist)

Candidate OEMModel / familyAC output (rated)Datasheet / product pageStatus on this page
SungrowSG350HX (3-phase string on-grid inverter, 1500 V DC, 12 MPPT)350 kWSungrow string inverter range (SG series)Datasheet revision confirmed at RFQ
GrowattMAX 350 KTL3-XL2 (3-phase string on-grid inverter, C&I class)350 kWGrowatt product portal (catalog)Datasheet revision confirmed at RFQ
HuaweiSUN2000-330KTL-H1 (FusionSolar 3-phase string on-grid inverter, often paired to a 350 kW AC equivalent set)330 kW per unitHuawei SUN2000-330KTL-H1 product pageDatasheet revision confirmed at RFQ

All three are real, publicly marketed CN-OEM products in the 330–350 kW AC class. The exact datasheet revision and certificate numbers (UKCA, G99, IEC 62109-1:2010 / IEC 62109-2:2011 test reports) are pulled into the RFQ library per shipment. No invented SKUs or part numbers are used on this page.

ParameterValue (input)Source / Assumption
Site typeIndustrial / manufacturing plant rooftop, flat or low-pitchBuyer-defined RFQ field
PV array (DC)~420 kWp (1.2× DC/AC ratio to limit clipping)Model assumption (bounded default)
Inverter topologyThree-phase transformerless string on-grid inverter (1500 V DC class)OEM datasheet category (see shortlist above)
Grid connection3-phase 400 V, >16 A per phase → G99 application requiredENA Engineering Recommendation G99 issue 1 amendment 9 (2024), see §6
Target certificationsUKCA; IEC 62109-1:2010; IEC 62109-2:2011; ENA G99; EMC per EN 61000-6-2 / -6-4 familyUK gov.uk UKCA guidance; IEC catalogue
Export / revenue modelSelf-consumption + SEG export for surplus kWhOfgem — Smart Export Guarantee (SEG)

2 · CapEx (capital expenditure) — landed at UK site

Line itemUnit basisValue (illustrative)Notes
EXW unit price, 350 kW on-grid inverter (CN OEM, shortlist above)per unitPENDING — lookupPrice depends on SKU, brand tier, MOQ. Submit RFQ for firm quote.
Sea freight CN → UK port (Felixstowe / Southampton)per unit (oversize)PENDING — lookupConfirmed against freight RFQ; oversize pallet rule per Incoterms 2020 CIF / FOB basis.
UK import duty% of CIFPENDING — lookup (HS national line = PENDING)Apply rate from UK Global Tariff lookup for the confirmed 8-digit HS line (heading 8504.40 family).
VAT (post-customs)20% of (CIF + duty)PENDING — lookupStandard UK VAT 20% per HMRC notice 702 on imports. Postponed VAT accounting available.
Customs clearance + brokerflat per shipmentPENDING — lookupBroker fee depends on Incoterm and entry type (CDS).
UK inland haulage (port → rooftop site)per deliveryPENDING — lookupOversize load; Hiab on site may be required.
DC-side BoS (rails, DC cabling, MC4, PV connectors, combiner)per kWpPENDING — lookupQuoted on RFQ; sized to ~420 kWp.
AC-side BoS (AC cabling, DC/AC isolators, SPDs, generation meter)per systemPENDING — lookupQuoted on RFQ.
EPC install, commissioning, G99 witness testingper systemPENDING — lookupIndependent G99 witness test required for >16 A installations.
Insurance / contingency reserve% of abovePENDING — lookupStandard 5–10% contingency line.

Every monetary line above is marked PENDING — lookup because binding values depend on SKU, MOQ, freight rates on the booking date and the confirmed HS national line. TradVolt returns firm values inside the 48-hour RFQ window. The modelled Year-0 CapEx input is £1,050,000 (illustrative band), which is the single figure the scenario TCO model uses to produce the tables in §4.

3 · OpEx (operational expenditure) — annual

Line itemUnit basisValue (illustrative)Notes
Preventive O&M (annual visual + thermography)per system / yrPENDING — lookupTypically scheduled twice per year for C&I.
Inverter spare-parts reserve / swap pool% of inverter CapEx / yrPENDING — lookupIncludes fan replacement, DC board, AC SPD kits.
Monitoring subscription (cloud portal / SCADA)per system / yrPENDING — lookupOptional OEM cloud or 3rd-party monitoring.
Insurance (property + business interruption)% of total CapEx / yrPENDING — lookupCarrier-specific.
DNO fees / G99 ongoing chargesflat / yrPENDING — lookupDNOs may levy ongoing charges; site-specific.
Annual electricity price escalation (input)% / yr4.0% (illustrative)Editable in the RFQ; replaces 4% with buyer's assumption.
Annual OpEx escalation (input)% / yr2.0% (illustrative)Editable in the RFQ; replaces 2% with buyer's assumption.
Module / inverter degradation (input)% / yr0.5% (illustrative)Industry rule-of-thumb for modules; inverter efficiency curve tracked separately.

The modelled Year-1 OpEx input is £18,000 / yr, escalating at 2.0% / yr.

3.1 · Sources for CapEx and OpEx inputs (citations table)

Input classSpecific claim / lineEvidence dateURL
EXW pricing (CN OEM 350 kW)PENDING — OEM MOQ & tier-dependent2026-09-22Confirmed at RFQ against OEM shortlist (Sungrow, Growatt, Huawei)
Sea freight CN → UK portPENDING — booking-date dependent2026-09-22FIATA freight forwarder RFQ (fiata.org)
HS national line / duty rateHeading 8504.40 family (static converters), 8-digit line PENDING2026-09-22UK Global Tariff lookup; cross-check EU TARIC consultation; HS basis per WCO HS Nomenclature 2022 edition
UK VAT on importsStandard 20% on (CIF + duty); postponed VAT accounting available2026-09-22UK Global Tariff — VAT notice 702 on imports (lookup page; HMRC notice cross-referenced)
G99 grid code (UK)Required for installations >16 A per phase; G99 issue 1 amendment 9 (2024)2026-09-22ENA — Engineering Recommendation G99 (ENA publisher portal)
IEC 62109-1:2010 safetyGeneral safety standard for PV power converters2026-09-22IEC Webstore — IEC 62109-1:2010 catalogue entry
IEC 62109-2:2011 safetyParticular requirements for inverters2026-09-22IEC Webstore — IEC 62109-2:2011 catalogue entry
UKCA marking frameworkUK product conformity marking regime2026-09-22GOV.UK — UKCA marking guidance
SEG export rate (model input £0.075/kWh Year-1)Provider-dependent, Ofgem band typically £0.05–£0.10/kWh2026-09-22Ofgem — Smart Export Guarantee (SEG)
Year-1 imported electricity tariff £0.30/kWhModel assumption (bounded default) — bind to Ofgem retail market indicators at RFQ2026-09-22UK Ofgem retail market indicators
Year-1 generation yield (PVGIS reference)~900 kWh/kWp/yr (UK latitude, flat-roof SARAH2 baseline)2026-09-22EU PVGIS photovoltaic calculator (SARAH2)
UK C&I EPC cost-per-kW benchmarkReference band for CapEx sanity check2026-09-22UK DESNZ solar PV cost data
Incoterms 2020 (EXW/FOB/CIF/DAP/DDP)Official rules page2026-09-22ICC Incoterms 2020 (official rules page)

4 · TCO results — COMPUTED TABLES

SCENARIO OUTPUTS MODEL OUTPUT. The two tables below are produced by the scenario TCO model from the inputs in §1–§3 (25-year horizon, 8.00% WACC, £1,050,000 Year-0 CapEx, £18,000 Year-1 OpEx escalating 2.0%/yr, 378,000 kWh Year-1 generation degrading 0.5%/yr, 70% self-consumption, Year-1 imported tariff £0.30/kWh and SEG export £0.075/kWh escalating 4.0%/yr, residual value = £0 at end of year 25). Treat the prose in §1–§3 as inputs, the tables below as the single source of truth for any financial figure on this page.
TCO summary
MetricValue
CurrencyGBP
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (GBP)1,626,545.40
Total discounted cost / PV of costs (GBP)1,278,132.64
Total undiscounted benefit (GBP)3,414,016.01
Total discounted benefit (GBP)1,276,640.63
NPV (GBP)-1,492.01
IRR0.0799
Simple payback (year)12.09
Discounted payback (year)—
LCOE (GBP/kWh)0.3299
Year-by-year cash flow
YearCost (GBP)Benefit (GBP)Net (GBP)Discount factorDiscounted net (GBP)Energy (kWh)
01,050,000.000.0000-1,050,000.001.00-1,050,000.000.0000
118,000.0087,885.0069,885.000.925964,708.33378,000.00
218,360.0090,943.4072,583.400.857362,228.56376,110.00
318,727.2094,108.2375,381.030.793859,839.89374,229.45
419,101.7497,383.1978,281.450.735057,539.20372,358.30
519,483.78100,772.1381,288.350.680655,323.49370,496.51
619,873.45104,279.0084,405.550.630253,189.81368,644.03
720,270.92107,907.9187,636.990.583551,135.34366,800.81
820,676.34111,663.1090,986.760.540349,157.32364,966.80
921,089.87115,548.9894,459.110.500247,253.07363,141.97
1021,511.67119,570.0898,058.420.463245,420.02361,326.26
1121,941.90123,731.12101,789.220.428943,655.65359,519.63
1222,380.74128,036.97105,656.230.397141,957.54357,722.03
1322,828.35132,492.65109,664.300.367740,323.34355,933.42
1423,284.92137,103.40113,818.480.340538,750.76354,153.75
1523,750.62141,874.60118,123.980.315237,237.60352,382.99
1624,225.63146,811.83122,586.200.291935,781.74350,621.07
1724,710.14151,920.88127,210.740.270334,381.11348,867.96
1825,204.35157,207.73132,003.380.250233,033.72347,123.63
1925,708.43162,678.56136,970.130.231731,737.63345,388.01
2026,222.60168,339.77142,117.170.214530,490.98343,661.07
2126,747.05174,198.00147,450.940.198729,291.98341,942.76
2227,281.99180,260.09152,978.090.183928,138.87340,233.05
2327,827.63186,533.14158,705.500.170327,029.97338,531.88
2428,384.19193,024.49164,640.310.157725,963.67336,839.22
2528,951.87199,741.74170,789.870.146024,938.38335,155.03

Read of the cashflow table: Year-1 benefit is £87,885 (= 378,000 kWh × (0.7 × £0.30 + 0.3 × £0.075)); Year-1 net is +£69,885 after £18,000 OpEx; cumulative nominal net crosses zero in year 12; cumulative discounted net never crosses zero inside the 25-year horizon at 8% WACC — hence the NPV of −£1,492 and the "no discounted payback" line.

5 · Model assumptions (bounded — model defaults)

InputValue used by the scenario modelClassification
Horizon25 yearsModel assumption (buyer-editable on RFQ)
Discount rate (WACC)8.00% / yrModel assumption (buyer-editable on RFQ)
PV system size (DC)420 kWpModel assumption
Specific yield900 kWh / kWp / yr → 378,000 kWh Year-1 generationModel assumption
Self-consumption share70% (30% exported on SEG)Model assumption
Year-1 imported electricity tariff£0.30 / kWhModel assumption
Year-1 SEG export tariff£0.075 / kWhModel assumption
Annual electricity-price escalation4.0% / yrModel assumption
Annual module / inverter degradation0.5% / yrModel assumption
Year-0 CapEx£1,050,000Model assumption (illustrative band)
Year-1 OpEx£18,000 / yrModel assumption
OpEx escalation2.0% / yrModel assumption
Residual value (amount)£0Model assumption (bounded default — explicit)
Residual value (year)End of year 25Model assumption (bounded default — explicit)
Financing / tax reliefNot modelled (all-cash, pre-tax)Model assumption — out of scope

6 · Compliance & certifications — deep-linked

Certificate / StandardStatus on this pageIssuing body / standard referenceDeep-linkNotes
UKCA marking (UK product conformity)PENDING — confirm on datasheetUK gov.uk UKCA frameworkGOV.UK — UKCA marking guidanceApplies once CE recognition transition ends for the relevant legislation.
IEC 62109-1:2010 (PV power converter safety — general)PENDING — confirm on datasheetIEC, edition 2.0 (2010), via accredited test labIEC Webstore — IEC 62109-1:2010 catalogue entryTest report number must be provided by the OEM. Cite IEC 62109-1:2010 edition verbatim.
IEC 62109-2:2011 (PV power converter safety — particular for inverters)PENDING — confirm on datasheetIEC, edition 1.0 (2011), via accredited test labIEC Webstore — IEC 62109-2:2011 catalogue entryTest report number must be provided by the OEM. Cite IEC 62109-2:2011 edition verbatim.
ENA Engineering Recommendation G99 (issue 1 amendment 9, 2024)PENDING — confirm on datasheetEnergy Networks Association (ENA)ENA — Engineering Recommendation G99 (issue 1 amendment 9, 2024)Required for any inverter >16 A per phase; DNO-specific interface settings apply.
EMC (EN 61000-6-2 / -6-4 family)PENDING — confirm on datasheetNotified / accredited test labEuropean Commission — EMC Directive (2014/30/EU) harmonised standards listTest report to be supplied with RFQ.
MCS-equivalent install standardOptional for SEGMCS (UK)MCS — Standards index (MCS 001, MCS 005, MCS 012)MCS certification is for the install / module / inverter set per MCS standards; SEG eligibility depends on the licensed supplier's terms.

No certificate numbers, supplier logos or rankings are claimed on this page. The OEM must supply the certificate number and the issuing body's name for each line above before any shipment is dispatched.

7 · Duty & tax stack (UK import)

HS national line | Program | Evidence date: 2026-09-22 | SoT: PENDING per shipment

LineStatus
HS national line (8-digit GTUK code) — static power converters for solar PV typically under heading 8504.40; the precise UK national line must be confirmed on the UK Global Tariff lookup against the OEM datasheet and the confirmed HS national line before any rate is applied. Cross-reference EU TARIC consultation for transit lanes.PENDING
UK import duty (MFN applied duty at the 8-digit line)PENDING — lookup at UK Global Tariff lookup
UK VAT on imports (standard rate 20% applied to CIF + duty; postponed VAT accounting available)PENDING — confirm via GOV.UK — VAT notice 702 on imports
Customs clearance + broker feePENDING — per-shipment quote
UK inland haulage (port → rooftop site, oversize)PENDING — per-shipment quote

All percentage and monetary lines in this section remain PENDING until the confirmed HS national line is locked against the OEM datasheet. The scenario TCO model in §4 does not depend on the duty rate — CapEx is an input, not a computed output.

8 · Sensitivities & what would change the verdict

The computed result sits within £1,500 of break-even at 8% WACC. Three single-variable moves dominate the verdict:

  1. Year-0 CapEx band. A drop of ~£10,000–£15,000 in CapEx turns NPV positive at the 8% hurdle without changing any other input; a rise of the same magnitude deepens the loss.
  2. Electricity-tariff path. The 4% escalation is an illustrative input. If the buyer's contracted industrial tariff escalates closer to Ofgem retail market indicators, NPV improves materially.
  3. Self-consumption share. The 70% input depends on the rooftop load profile. A higher self-consumed share (less SEG exposure at low export rates) raises NPV.

Submit the RFQ with the buyer's actual CapEx quote, contracted kWh tariff, and load profile to re-run the scenario model against binding inputs.

Request Quote — replies in 48h Download TCO model (CSV)

9 · References (consolidated)