Modelled TCO and landed-cost for a Sungrow SG10RT (10 kW, 3-phase, 2 MPPT, transformerless string inverter) sourced from China and installed on a warehouse rooftop in Peru. Computed NPV, IRR, LCOE, payback and sensitivity — all figures from the scenario TCO model on this page.
4. Model assumptions (bounded — explicitly stated)
All assumptions below are explicit model inputs, not sourced facts. They define the bounded scenario on which the tables above are computed. Any change to an input changes the model outputs.
0.5 % / yr (so energy goes 15,000 → 14,925 → … → 13,299.80 in year 25)
Model input
Self-consumption ratio
70 % of generated kWh valued at retail tariff; remaining 30 % valued at export tariff
Model input
Retail tariff (grid offset)
USD 0.12 / kWh (Osinergmin-regulated bar tariff for industrial clients — Peru figure range; confirm at RFQ)
Model input — bounded assumption
Export tariff (surplus injection)
USD 0.06 / kWh (Peruvian regulated export / net-billing style — confirm at RFQ with Osinergmin / local utility)
Model input — bounded assumption
Annual yield (warehouse rooftop, Peru coast)
1,500 kWh/kWp/yr — bounded assumption cross-checked against PVGIS-SARAH2 / NASA POWER for the Lima/Coast region
Model input — bounded assumption (site-specific PVGIS query at RFQ)
Residual value (asset.pv)
USD 0 at year 25 (inverter BoS only; no residual)
Model input — bounded assumption
Residual value year
n/a (zero)
Model input — bounded assumption
Cycling profile
Diurnal warehouse-rooftop profile (no DC-side storage in this scenario)
Model input — bounded assumption
5. CapEx build-up (illustrative; reconciled to model year-0 cost)
The USD 7,080 year-0 cost in the model equals the inverter landed cost plus the all-in $/Wp for the BoS/share allocated to a 10 kWp DC system at this site. Individual duty/IGV rows must be confirmed against the SUNAT Arancel de Aduanas at the time of shipment.
ILLUSTRATIVE — NOT A QUOTE. Sensitivity cells below are arithmetic on the bounded inputs in Section 4; they re-derive IRR / NPV / payback under the listed yield and tariff perturbations. Replace with PVGIS site-specific yield and Osinergmin tariff before relying on the result.
Scenario
Annual yield (kWh/kWp/yr)
Self-consumption ratio
Retail tariff (USD/kWh)
Export tariff (USD/kWh)
Modelled NPV (USD)
Modelled IRR
Modelled simple payback (yrs)
Low yield, base tariff
1,200
70 %
0.12
0.06
PENDING — re-run
PENDING — re-run
PENDING — re-run
Base (matches Sections 2–3)
1,500
70 %
0.12
0.06
9,658.87
0.2120
4.80
High yield, base tariff
1,700
70 %
0.12
0.06
PENDING — re-run
PENDING — re-run
PENDING — re-run
Base yield, tariff USD 0.10 / kWh
1,500
70 %
0.10
0.05
PENDING — re-run
PENDING — re-run
PENDING — re-run
Base yield, tariff USD 0.15 / kWh
1,500
70 %
0.15
0.075
PENDING — re-run
PENDING — re-run
PENDING — re-run
Only the "Base" row in this table is the verbatim model output above; the other four rows require re-running the scenario model and are listed as pending because the figures above are the only authorised numbers for this page.
Confirm certificate number against the OEM CB test report at RFQ
IEC 62109-2:2011
Safety of power converters for PV, Part 2: Particular requirements for inverters; used jointly with IEC 62109-1 — see IEC 62109-2:2011 (IEC Webstore)
Confirm certificate number against the OEM CB test report at RFQ
IEC 61215-1:2021 ed2
Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (for module pairings) — see IEC 61215-1:2021 ed2 (IEC Webstore)
PENDING — confirm against module datasheet at RFQ
UL 1741 (incl. SB / Rule 21 supplement where applicable)
Inverter, converter, controller and interconnection system equipment for distributed energy resources
PENDING — request from OEM
UL 61730-1
PV Module Safety Qualification — Part 1: Requirements for construction — see UL 61730-1 (UL shop)
PENDING — request from module OEM
CE conformity (EMC + LVD)
EU conformity — confirm applicability for PE shipment
PENDING — request from OEM
Peru SEIN / Osinergmin grid-code alignment
Local utility approval (Enel Distribución, Luz del Sur, etc.)
PENDING — coordinate with end-user's utility
ISO 9001 (mfg. QMS)
Manufacturer quality system (Sungrow)
PENDING — request from OEM
9. Duty / VAT / HS-code block
HS national line
Program
As-of: 2026-09-22
SoT
HS 8504.40 (static converters; international 6-digit — Peruvian national sub-line PENDING — SUNAT lookup)
Import ad-valorem duty
PENDING — SUNAT lookup at the time of shipment (Peruvian national sub-line under HS 8504.40, "demás convertidores estáticos" / inverter sub-line)
IEC 62109-2:2011 (IEC Webstore) — Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters (jointly with IEC 62109-1).