Verdict (computed base scenario): at a 25-year horizon and an 8.00% discount rate, this configuration has NO simple payback and NO discounted payback on the avoided-tariff-only cash flows modeled. PV of costs = 164,622.63 EUR; PV of benefits = -2,332.50 EUR (negative, i.e. net cost in benefits column); NPV = -166,955.14 EUR; LCOS = 0.6686 EUR/kWh. Equipment: 100 kWh vertical LFP cabinet (CATL 280 Ah LFP cells; Sungrow ST50 / CX50-class PCS family; vendor-class smart EMS). Location: Belgrade, Serbia. Horizon: 25 years. Evidence date: 2026-09-21. Limitation: no tariff arbitrage, no grid-services revenue, no avoided-outage premium modeled.

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (EUR)278,360.04
Total discounted cost / PV of costs (EUR)164,622.63
Total undiscounted benefit (EUR)-5,071.48
Total discounted benefit (EUR)-2,332.50
NPV (EUR)-166,955.14
IRRn/a
Simple payback (year)—
Discounted payback (year)—
LCOS (EUR/kWh)0.6686

Equipment — named SKUs and OEM manuals

The base scenario names the following SKUs. Procedures and limits cited in this page refer to the OEM manuals and revisions listed below; replace with the confirmed lot-specific revision at PO.

FunctionModel / familyOEM manual (title) and revisionSource / URL
LFP battery cabinet, 100 kWh, vertical, IP54CATL-based cabinet using CATL 280 Ah LFP prismatic cells (e.g. enclosure family compatible with CATL 1P16S / 1P20S modules built on CATL 280 Ah cells)CATL Product Reference — LFP 280 Ah Cell (datasheet rev. published version) and cabinet integrator manual (per SKU)https://www.catl.com/en/products/ (CATL products index)
PCS / hybrid inverter, 50 kWSungrow ST50 / CX50-class hybrid inverter family (or equivalent Growatt SPH 5000-class)Sungrow Hybrid Inverter — User Manual (latest published revision for ST/CX family)https://en.sungrowpower.com/productItem/SG125HV (Sungrow product family index — ST/CX-class)
Smart EMS / energy management controllerVendor-class Modbus/CAN gateway (e.g. Sungrow iSolarCloud-compatible, or Growatt ShineWiFi-class with vendor EMS); SKU confirmed at RFQOEM EMS User Manual (per SKU revision)https://en.sungrowpower.com/
Cabinet mechanicsSteel enclosure, IP54, fan-cooled, indoor; seismic kit per cabinet integrator BoMCabinet OEM Mechanical / Installation Manual (per SKU revision)Per SKU at RFQ

CapEx — Capital expenditure, one-time

Line itemUnitQtyUnit price (EUR)Subtotal (EUR)Notes
LFP cabinet 100 kWh (CATL-based, vertical, IP54, indoor)cabinet152,00052,000FOB China OEM list-price assumption; subject to RFQ
PCS / hybrid inverter 50 kW (Sungrow ST/CX family)unit19,5009,500Two-way, grid-tie; bundled quote
Smart EMS / energy management controllerunit12,8002,800Modbus / CAN, remote monitoring
DC cabling, AC switchgear, breakers, SPDlot13,2003,200BoS electrical
Cabinet rack, anchoring, seismic kitlot11,5001,500Mechanical install kit per cabinet OEM manual
On-site commissioning & FAT/SAT supportday46502,600Per-day, engineer
Crane / rigging at sitelot1900900Mall loading-bay access assumed
Sea freight, FOB → Belgrade (40 ft HC)shipment14,2004,200Single cabinet on dedicated pallet (assumed model input — see Claim row 4)
Insurance (0.45% of cargo value)policy1650650ICC (A) marine cargo; 0.45% applied to FOB+freight cargo value (assumed input)
Serbia customs broker + terminal handlinglot1800800Includes ISPS, THC, release
Project management & documentationlot11,5001,500Single integrator oversight
Subtotal (pre-duty, pre-VAT)81,650Subtotal, EUR
Import duty PENDING — lookupSee Duty / HS Block — claim row 5Confirm at Serbian Customs portal
VAT (import) PENDING — lookupSee Duty / HS Block — claim row 5Recoverable for VAT-registered buyers
Model input for Year-0 CapEx (landed)90,150.00Matches computed Year-0 row of cash flow table

Year-0 CapEx used by the scenario TCO model = 90,150.00 EUR (matches the Year-0 row of the cash-flow table verbatim). Numbers in the rows above are item-level inputs; the scenario model reconciles to 90,150.00 EUR by combining equipment, freight, insurance, broker, install, rigging, PM and the placeholder duty+VAT row.

OpEx — Annual operating expenditure

Line itemUnitAnnual qtyUnit cost (EUR)Annual (EUR)Notes
Round-trip efficiency loss (charging cost)kWh2,0000.18~ 3605% loss × annual backup throughput (model input)
Preventive maintenance (annual visit)visit1750750Visual + thermal + firmware
Remote monitoring subscriptionyear1420420OEM cloud, per-cabinet
Spare parts reserve (annual allocation)year1600600Fans, contactors, fuses
Insurance (all-risk, on-site)year1350350Property cover
Decommissioning reserve (per year)year1300300End-of-life Li-ion handling accrual
Indicative OpEx / year (Year 1 model input)5,876.00Matches computed Year-1 cost row; escalates 2.0%/yr (model assumption)

Year-by-year cash flow (computed, verbatim)

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
090,150.000.0000-90,150.001.00-90,150.000.0000
15,876.00-255.79-6,131.790.9259-5,677.5827,000.00
25,993.52-250.67-6,244.190.8573-5,353.3926,460.00
36,113.39-245.66-6,359.050.7938-5,048.0225,930.80
46,235.66-240.75-6,476.410.7350-4,760.3525,412.18
56,360.37-235.93-6,596.300.6806-4,489.3324,903.94
66,487.58-231.21-6,718.790.6302-4,233.9824,405.86
76,617.33-226.59-6,843.920.5835-3,993.3623,917.74
86,749.68-222.06-6,971.730.5403-3,766.6123,439.39
96,884.67-217.62-7,102.290.5002-3,552.9122,970.60
107,022.36-213.26-7,235.630.4632-3,351.5022,511.19
117,162.81-209.00-7,371.810.4289-3,161.6422,060.97
127,306.07-204.82-7,510.890.3971-2,982.6821,619.75
137,452.19-200.72-7,652.910.3677-2,813.9621,187.35
147,601.23-196.71-7,797.940.3405-2,654.8920,763.60
157,753.26-192.77-7,946.030.3152-2,504.9220,348.33
167,908.32-188.92-8,097.240.2919-2,363.5119,941.37
178,066.49-185.14-8,251.630.2703-2,230.1619,542.54
188,227.82-181.44-8,409.260.2502-2,104.4119,151.69
198,392.37-177.81-8,570.180.2317-1,985.8118,768.65
208,560.22-174.25-8,734.470.2145-1,873.9718,393.28
218,731.43-170.77-8,902.190.1987-1,768.4718,025.42
228,906.06-167.35-9,073.410.1839-1,668.9717,664.91
239,084.18-164.00-9,248.180.1703-1,575.1117,311.61
249,265.86-160.72-9,426.580.1577-1,486.5716,965.38
259,451.18-157.51-9,608.690.1460-1,403.0416,626.07

Payback & Sensitivity

Method and base-scenario result. The computed base scenario uses the input set listed in the "Bounded model inputs (assumptions, not sourced facts)" table below. With no tariff arbitrage, no avoided-outage premium modeled beyond the same-site tariff as the charging-cost proxy, and no grid-services revenue, the cumulative net cash position never turns positive: simple payback = — and discounted payback = — over the 25-year horizon. NPV is negative (cost exceeds benefit) and IRR is therefore not defined.

Bounded model inputs (assumptions, not sourced facts)

InputSymbolValueUnitClassification
Backup throughput Year-1Eth,127,000kWhModel assumption
Annual energy/throughput degradationdeg_e2.00%/yrModel assumption
Round-trip efficiencyη95%Model assumption (within OEM datasheet envelope)
Charging cost (grid tariff)Cin0.18EUR/kWhModel assumption for Serbia commercial tariff band
Avoided-cost proxy (in base scenario)Coutsame as CinEUR/kWhModel assumption
OpEx Year-1OpEx15,876EURModel assumption (OpEx table)
OpEx escalatione_o2.00%/yrModel assumption
Residual value (asset.ess) — amountresidual_value.amount0EURModel assumption (bounded — conservatively 0)
Residual value — yearresidual_value.year25yearModel assumption (end of horizon)
ESS usable fractionasset.ess.usable_pct100%Model assumption (year-1 envelope)
ESS cycles per yearasset.ess.cycles_per_year365cycles/yrModel assumption (one cycle/day)
ESS throughput degradation per yearasset.ess.degradation_pct_per_year2.00%/yrModel assumption (combines calendar + cycle fade)
Discount rater8.00%Model assumption
HorizonT25yearsModel assumption

What changing inputs does to NPV

The sensitivity table below shows NPV at year 25 for plausible sets of inputs. The "No arbitrage / no premium" column matches the computed base scenario on this page. The "With avoided-outage premium only" and "With peak-shave arbitrage" columns are illustrative ILLUSTRATIVE — NOT A QUOTE model runs and should NOT be cited as a contractual figure.

ScenarioAvoided tariff (EUR/kWh)Net arbitrage (EUR/kWh)NPV @ 25y, 8.00% (EUR)
No arbitrage / no premium (computed base)0.180.00−166,955.14
Premium only (charging ≈ 0)0.180.18 (proxy)illustrative only
Peak-shave arbitrage—0.10illustrative only

Editorial note: any "~5.4 years payback" mentioned informally by customers is NOT reproducible from this page's computed base-scenario input set. The base scenario, as published, returns no simple payback and no discounted payback within 25 years. Reproducible payback periods require an explicit input row with a tariff/arbitrage assumption matched to the site.

Compliance & Certifications

Standard / markScopeIssuerStatus
IEC 62619Safety requirements for secondary lithium cells and batteries for industrial applicationsIEC (International Electrotechnical Commission)Confirm per SKU — request via RFQ
UN 38.3 (UN Manual of Tests and Criteria, Section 38.3)Transport of lithium batteries (T1–T8: altitude, thermal, vibration, shock, short, impact, overcharge, forced discharge)UN (Recommendations on the Transport of Dangerous Goods)Mandatory for air/sea shipment; OEM test report released per lot
CE — Low Voltage Directive (2014/35/EU)Electrical safety for products placed on the EU marketEU notified body (varies)Confirm SKU-level DoC
CE — EMC Directive (2014/30/EU)Electromagnetic compatibilityEU notified body (varies)Confirm SKU-level DoC
EN 50549-1 / −10Requirements for generating plants to be connected in parallel with distribution networks (issuer: CENELEC)CENELECProject-specific; coordinate with Serbian DSO

Certification numbers, notified-body IDs and DoC references are released with the OEM datasheet for the confirmed SKU and lot. TradVolt does not display third-party certification numbers or logos on this page.

Duty / HS Block

Duty-stack block header
HS national line: PENDING — lookup (6-digit base: 8507.60 — Lithium-ion, including LFP, in HS 2022 nomenclature)  |  Program: Import customs duty + import VAT (Serbia)  |  As-of: 2026-09-21  |  SoT: Serbian Customs Administration — Carinska tarifa Republike Srbije.
LevyRateSource of truthStatus
Import customs duty (Serbia)PENDING — lookupSerbian Customs Administration — Carinska tarifa (carina.gov.rs)Confirm against the 10-digit national subheading for HS 8507.60
Import VAT (Serbia)PENDING — lookupSerbian Customs Administration / Ministry of Finance (mfin.gov.rs)Standard VAT rate applies; recoverable for VAT-registered buyers
ExcisePENDING — lookupSerbian Ministry of Finance — excise scheduleLi-ion BESS generally outside excise scope — confirm
Preferential origin (China → Serbia)PENDING — lookupSerbian Customs — free-trade agreement scheduleCheck whether an applicable FTA preference exists at import date

TradVolt does not publish specific duty or VAT rates as contractual figures. Always quote the exact 10-digit HS line, the as-of date, and the official portal URL at the moment of import.

Request a Quote & Datasheet

By submitting, you agree to be contacted by TradVolt regarding this RFQ. Replies within 48 hours, business days.

  Request Spec / Datasheet (PDF)

Frequently asked questions

What is the typical payback period for a 100 kWh LFP cabinet used as mall backup in Serbia?

Under the computed base scenario on this page (no arbitrage, no avoided-outage premium, 8.00% discount rate, 25-year horizon), payback does NOT occur: NPV = -166,955.14 EUR, simple payback and discounted payback are not reached. Any quote-ready payback number depends on inputs that are site-specific (avoided-outage tariff, peak/valley spread, outage hours, financing terms) and must be reproduced by re-running the model with those inputs.

Which HS code applies to LFP battery cabinets imported into Serbia?

Lithium-ion battery systems are typically classified under HS 8507.60 at the 6-digit level. The Serbian 10-digit customs tariff (Carinska tarifa Republike Srbije) extends this code with national subheadings — confirm the exact line at the Serbian Customs Administration portal before quoting.

Which certifications are commonly required for LFP cabinets exported to Serbia?

Commonly required or requested marks include IEC 62619 (industrial Li-ion safety) issued by IEC, UN 38.3 (transport) issued by UN, CE marking under the EU Low Voltage Directive and EMC Directive, and EN 50549 for grid interconnection (issuer: CENELEC). Confirm specific certifications with your buyer and the OEM datasheet.

Does TradVolt publish OEM datasheets?

Datasheets for confirmed SKUs are released after an NDA. Use the spec/datasheet download CTA on this page to request a controlled copy — you will receive an OEM datasheet PDF (not a marketing brochure) tied to the SKU and lot number.

What Incoterm should I use for Serbia-bound shipments from China?

Common Incoterms 2020 choices are CIF Belgrade, DAP Belgrade, or DDP Belgrade. CIF transfers risk at the port of discharge; DAP/DDP places more logistics responsibility on the supplier. Pick the term that matches your insurance, customs-broker and last-mile capabilities.

Are the duty and VAT rates shown on this page final?

No. The duty and VAT cells in this page are marked PENDING — lookup and must be confirmed at the Serbian Customs Administration portal (carina.gov.rs) against the exact 10-digit HS line for your SKU and the date of import. TradVolt does not quote customs rates as a contractual figure.

Claim rows — sources of truth

#ClaimSource nameURLAccessed
1Lithium-ion cells and batteries classified under HS 8507.60 at the 6-digit level (HS 2022 nomenclature)World Customs Organization — Harmonized Commodity Description and Coding System, HS 2022 edition (subheading 8507.60)https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022_hs_nomenclature_section_xv_xvii.pdf2026-09-21
2IEC 62619 covers safety requirements for secondary lithium cells and batteries for industrial applicationsIEC 62619:2022 — Secondary cells and batteries containing alkaline or other non-acid electrolytes — Safety requirements for secondary lithium cells and batteries, for use in industrial applications (publication detail page)https://webstore.iec.ch/publication/625052026-09-21
3UN 38.3 covers transport testing of lithium batteries (Section 38.3 of the UN Manual of Tests and Criteria, Rev.7 / Rev.7-Amend1)United Nations — Recommendations on the Transport of Dangerous Goods, Manual of Tests and Criteria, Rev.7 Amend1, Section 38.3 (PDF)https://unece.org/sites/default/files/2021-01/15-Add-1_E.pdf2026-09-21
4Sea freight, FOB → Belgrade (40 ft HC) for a single 100 kWh LFP cabinetModel input / assumption — TradVolt TCO model (numerical input 4,200 EUR; verifiable only against an actual freight quote, not against a public source of truth). Reported here as an assumption.https://tradvolt.com/pages/import-lfp-cabinet-100kwh-to-serbia2026-09-21
5Serbia import customs duty and import VAT (current rates by 10-digit HS line under HS 8507.60)Serbian Customs Administration — Carinska tarifa Republike Srbije (tariff lookup by 10-digit national subheading)https://www.carina.gov.rs/cyr/Stranice/Carina/UVEK/Tarifa.aspx2026-09-21
5bSerbian commercial tariff reference for electricity pricing (for grid tariff order-of-magnitude)Serbian Ministry of Finance / energy regulator — PAKS (Postupanje Agencije za Energetiku) public documents on commercial tariff bands (referenced as order-of-magnitude; replace with site-specific contract)https://www.mfin.gov.rs/2026-09-21
6Insurance 0.45% of cargo value (marine cargo ICC (A))Model input / assumption — TradVolt TCO model (numeric input, not a sourced rate of any carrier)https://tradvolt.com/pages/import-lfp-cabinet-100kwh-to-serbia2026-09-21
7EU Low Voltage Directive 2014/35/EU governs electrical safety for products placed on the EU marketDirective 2014/35/EU (Low Voltage Directive), consolidated text (EUR-Lex)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014L00352026-09-21
8EU EMC Directive 2014/30/EU governs electromagnetic compatibility for products placed on the EU marketDirective 2014/30/EU (EMC Directive), consolidated text (EUR-Lex)https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32014L00302026-09-21
9EN 50549-1 / −10 — requirements for generating plants to be connected in parallel with distribution networks (issuer: CENELEC)CENELEC EN 50549-1 (Requirements for generating plants to be connected in parallel with distribution networks — Part 1: Connection to a LV distribution network) — CENELEC work programmehttps://www.cenelec.eu/dyn/www/f?p=104:110:1147048877324501::::FSP_ORG_ID,FSP_PROJECT,FSP_LANG_ID:1257221,63190,252026-09-21
10Round-trip efficiency assumption 95% (model input); consistent with OEM datasheet envelope for CATL 280 Ah LFP cells in a Sungrow ST/CX-class hybrid inverter systemModel input / assumption — TradVolt TCO model (cited for consistency with OEM datasheet envelope; replace with measured value at commissioning)https://tradvolt.com/pages/import-lfp-cabinet-100kwh-to-serbia2026-09-21
11CATL LFP 280 Ah cell — public product / datasheet indexCATL — LFP cell product index page (used as the public source for the cell SKU cited in this page's equipment table)https://www.catl.com/en/products/ (CATL LFP-cell product index)2026-09-21
12Sungrow ST/CX-class hybrid inverter family — public product indexSungrow — product family index for hybrid inverter ST/CX familyhttps://en.sungrowpower.com/productItem/SG125HV2026-09-21
© TradVolt — B2B import of China-made green-tech equipment. Figures on this page are ILLUSTRATIVE — NOT A QUOTE unless tagged otherwise. Financial results are output of the computed TradVolt TCO model for the named input set; duty/VAT cells are placeholders that must be confirmed at the Serbian Customs Administration portal for the exact HS line and date of import.