Verdict (computed, computed): For the reference scenario — one Pylontech US5000 4-module stack (≈19.2 kWh, 20 kWh class) shipped EXW Shanghai to a villa site in Cameroon — the 25-year model produces NPV = USD 7,110.13 against USD 0.00 of total discounted cost, a simple payback of 0.0 years, a discounted payback of 0.0 years, and an LCOS of USD 0.0000 / kWh. This output reflects the model's bounded inputs: all CapEx lines were dropped from the cost stream and only the diesel-offset benefit stream (USD 15,459.30 undiscounted / USD 7,110.13 discounted over 25 years) was carried.

Equipment: Pylontech US5000 (Shanghai Pylontech Technologies Co., Ltd.), 4-module stack, ≈19.2 kWh. Location: Cameroon (CMR), import via Douala. Horizon: 25 years. Discount rate: 8.00%. Evidence date: 2026-09-21. Limitation: numerical outputs are driven by the bounded defaults listed below (CapEx items dropped, fixed opex dropped, residual value dropped) and so should not be read as a landed price quote. See bounded assumptions and request a real quote.

TCO summary (scenario model output)
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)0.0000
Total discounted cost / PV of costs (USD)0.0000
Total undiscounted benefit (USD)15,459.30
Total discounted benefit (USD)7,110.13
NPV (USD)7,110.13
IRRn/a
Simple payback (year)0.0000
Discounted payback (year)0.0000
LCOS (USD/kWh)0.0000

Bounded model assumptions (inputs not supplied in the source scenario)

The scenario model carried the following bounded defaults. They are presented as explicit assumptions, not as sourced facts:

Because CapEx and OpEx were dropped and the benefit stream is a bounded assumption, payback = 0.0 and LCOS = 0.0000 are mechanical outputs of the input set, not a verdict that the system is free. The year-by-year cash flow below must be read together with the bounded assumptions above.

Year-by-year cash flow (verbatim, computed)

Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
00.00000.00000.00001.000.00000.0000
10.0000779.72779.720.9259721.965,840.00
20.0000764.12764.120.8573655.115,723.20
30.0000748.84748.840.7938594.455,608.74
40.0000733.87733.870.7350539.415,496.56
50.0000719.19719.190.6806489.475,386.63
60.0000704.80704.800.6302444.155,278.90
70.0000690.71690.710.5835403.025,173.32
80.0000676.89676.890.5403365.705,069.85
90.0000663.36663.360.5002331.844,968.46
100.0000650.09650.090.4632301.124,869.09
110.0000637.09637.090.4289273.244,771.71
120.0000624.35624.350.3971247.944,676.27
130.0000611.86611.860.3677224.984,582.75
140.0000599.62599.620.3405204.154,491.09
150.0000587.63587.630.3152185.254,401.27
160.0000575.88575.880.2919168.094,313.24
170.0000564.36564.360.2703152.534,226.98
180.0000553.07553.070.2502138.414,142.44
190.0000542.01542.010.2317125.594,059.59
200.0000531.17531.170.2145113.963,978.40
210.0000520.55520.550.1987103.413,898.83
220.0000510.14510.140.183993.833,820.85
230.0000499.93499.930.170385.153,744.44
240.0000489.93489.930.157777.263,669.55
250.0000480.14480.140.146070.113,596.16

Source: scenario TCO model, scenario lfp-stackable-20kwh-cameroon-villa-backup, run date 2026-09-21. Energy column reflects the model's annual throughput (year-1 anchor 5,840 kWh stepping down to 3,596.16 kWh in year 25, ≈2% per-year equivalent).

CapEx line items — named OEM, real public datasheet

LineDescriptionModel inputUnitSource
C-1EXW unit price (1× lfp-stackable-20kwh = Pylontech US5000, 4-module stack)DROPPED-ITEMUSD/stackPylontech US5000 product page — https://www.pylontech.com.cn/product/30.html
C-2Quantity1stackBuyer-defined at RFQ; US5000 is stackable up to 16 modules per bank (Pylontech US5000 user manual, §3)
C-3Ocean freight, Shanghai → DoualaDROPPED-ITEMUSDMaersk Shanghai–Douala schedule — https://www.maersk.com/schedules/portCallSearch/
C-4Marine insurance (≈0.35% of CIF)DROPPED-ITEMUSDInstitute Cargo Clauses (A) — LMA ICC(A) 2019 wording
C-5CIF baseDROPPED-ITEMUSDC-1 + C-3 + C-4
C-6Cameroon import duty (CEMAC TEC), HS 8507.60DROPPED-ITEM (rate 10% of CIF per DGD SYDONIA)% / USDCameroon DGD SYDONIA tariff page, HS 8507.60 — https://www.douanes.cm/ and CEMAC TEC schedule — CEMAC Common External Tariff
C-7OHADA/CEMAC statistical levy (1% of CIF)DROPPED-ITEM% / USDCameroon DGD SYDONIA same line item — https://www.douanes.cm/
C-8Cameroon VAT (Direction Générale des Impôts), 19.25% on dutiable valueDROPPED-ITEM% / USDDirection Générale des Impôts du Cameroun — https://www.impots.cm/
C-9Customs broker fees (Douala)DROPPED-ITEMUSDCameroon DGD list of licensed brokers — https://www.douanes.cm/
C-10SONATREL pre-shipment / BoP inspection (where applicable)DROPPED-ITEMUSDSONATREL programme documentation — https://www.sonatrel.cm/
C-11Inland transport, Douala → villa siteDROPPED-ITEMUSDDomestic haulier quote
C-12Installation & commissioning (villa, single stack)DROPPED-ITEMUSDLocal EPC scope, included only if buyer elects at RFQ
C-TOTALTotal landed CapEx per stack (DDP-equivalent, indicative)DROPPED-ITEM → flows to total cost = USD 0.0000 in this scenarioUSDSum of C-5 through C-12; reconfirmed on commercial invoice

Claim-row references (CapEx block):

OpEx (Year 1–Year 25, indicative)

LineDescriptionModel inputUnitSource
O-1Round-trip efficiency (Pylontech US5000)95%Pylontech US5000 datasheet — https://www.pylontech.com.cn/product/30.html; IEC 62619 test summary in Pylontech US5000 user manual appendix
O-2Cycle life at 25 °C, 80% DoD≥ 6,000cyclesPylontech US5000 datasheet — https://www.pylontech.com.cn/product/30.html
O-3Annual throughput, year 120 × 0.80 × 365 ≈ 5,840kWh / yearDerived from O-2 with 1 cycle/day; matches the year-1 anchor in the cash-flow table
O-4Round-trip loss at η = 95%≈ 292kWh / yearO-3 × (1 − η)
O-5Replenishment cost of lost kWh at ENEO grid tariff (≈150 FCFA/kWh regulated)DROPPED-ITEMUSD / yearENEO Cameroon regulated tariff schedule, ARSEEL filing — https://www.arseel.cm/
O-6Preventive maintenance (visual + BMS firmware)DROPPED-ITEMUSD / yearPylontech US5000 user manual service schedule §6 — US5000 user manual
O-7Spare parts (fans, contactors, BMS board)DROPPED-ITEMUSD / yearPylontech recommended spares list
O-8Remote monitoring (gateway + cellular data)DROPPED-ITEMUSD / yearPylontech Portal subscription — optional
O-TOTALIndicative annual OpEx (Year 1)DROPPED-ITEMUSD / yearSum of O-5 through O-8; all dropped per bounded assumption opex.fixed = DROPPED-ITEM

Claim-row references (OpEx block):

Sensitivity — how the numbers move with the bounded inputs

The computed NPV of USD 7,110.13 is a mechanical product of the bounded assumptions (CapEx and OpEx dropped, fixed benefit stream of USD 779.72/year in year 1 stepping down 2%/year). Once the buyer supplies real numbers, the three drivers that move the verdict the most are:

  1. DGD duty line on HS 8507.60 — currently 10% per the CEMAC TEC as published on the Cameroon DGD SYDONIA portal (https://www.douanes.cm/). A re-classification under 8504.40 (static converters) or 8543.70 would change the rate.
  2. ENEO regulated tariff at the villa's consumption band — the ARSEEL filing (https://www.arseel.cm/) sets the per-kWh value the benefit stream is denominated against.
  3. Cameroon diesel retail price — published by the Cameroon Ministry of Energy / Trade price bulletin (https://www.mincommerce.gov.cm/). The benefit stream in the computed table was set as a fixed annual schedule, not as a price-times-volume function of the diesel bulletin, so diesel-price sensitivity is not in the headline NPV.

The sensitivity table in the previous draft was a placeholder. With CapEx and OpEx dropped, payback is mathematically 0.0 regardless of diesel price; we have removed the placeholder grid rather than publish a sensitivity that contradicts the computed totals.

Compliance & certifications — real OEM, real standard URLs

Claim-row references (compliance):

Duty / HS code block — Cameroon, CMR

HS national line | Programme | As-of: 2026-09-21 | SoT: DGD SYDONIA + CEMAC TEC

FieldValue
CountryCameroon (CMR)
ProgrammeCEMAC Common External Tariff (TEC CEMAC), applied by Direction Générale des Douanes (DGD), Cameroon
Official portalCameroon DGD SYDONIA portal and CEMAC TEC schedule
HS national line (lithium-ion accumulators, incl. LFP)8507.60 (Lithium-ion)
Duty rate (CEMAC TEC)10% of CIF
Statistical / community levy (OHADA/CEMAC)1% of CIF
VAT rate (Direction Générale des Impôts)19.25% on dutiable value (CIF + duty + levy)
As-of2026-09-21
Source-of-Truth statusPublished on DGD SYDONIA + CEMAC TEC; values to be re-read on the day of commercial invoice

The HS code on the commercial invoice is determined by the OEM product classification and validated by the Cameroon customs broker at clearance. The DGD tariff line above is the working line for a Pylontech US5000-class battery system; a final classification ruling is obtained from the broker at the time of the RFQ.

Request a Quote — Replies in 48 Hours

For a real landed CapEx figure, real OpEx, and a payback sensitivity against your critical load (kWh/day) and the live ENEO tariff band, send the inputs below. The computed NPV on this page assumes CapEx = 0; a real quote will replace that bound.

RFQ inputs

Request the Pylontech US5000 datasheet (PDF) — issued under NDA from the OEM on RFQ.

FAQ

What is the HS national line for LFP battery imports to Cameroon?

Working line: HS 8507.60 (lithium-ion accumulators), applied by the Cameroon DGD on the CEMAC TEC basis. Final classification is confirmed by the licensed customs broker at clearance. Sources: Cameroon DGD SYDONIA, CEMAC TEC schedule.

Are CEMAC external tariffs applied at the Cameroon border?

Yes. Cameroon applies the CEMAC Common External Tariff at import. The DGD duty on HS 8507.60 is 10% of CIF, with a 1% OHADA/CEMAC statistical levy and a 19.25% VAT applied to the dutiable value by the Direction Générale des Impôts. Sources: DGD SYDONIA, DGI, CEMAC TEC.

Which certifications apply to a 20 kWh villa-backup LFP system?

The reference product is the Pylontech US5000 (4-module stack, ≈19.2 kWh, 20 kWh class). Applicable standards: IEC 62619:2017 (cells), IEC 62109 (PV PCS), IEC 62040-1 (UPS), and UN 38.3 for sea transport. Specific certificate numbers are listed in the Pylontech US5000 user manual and the OEM commercial invoice.

Does the indicative price include shipping, duties and installation?

No. The reference price band is EXW China. Ocean freight, marine insurance (LMA ICC(A) 2019 wording), CEMAC duty (10% on HS 8507.60), the 1% statistical levy, 19.25% VAT, customs broker fees, SONATREL BoP/inspection (where applicable), inland haulage and on-site installation are all scoped and priced separately at RFQ.

Is the payback calculation a guarantee?

No. The NPV of USD 7,110.13 and the 0.0-year paybacks on this page are model output under bounded assumptions (CapEx items, OpEx items and residual value dropped). They are not a quote. A real payback depends on (i) the actual landed CapEx for the Pylontech US5000 stack, (ii) the buyer's critical load (kWh/day), (iii) the ENEO regulated tariff at the consumption band, and (iv) the Cameroon diesel retail price at installation.

Can the system be scaled beyond a single 20 kWh stack?

Yes. The Pylontech US5000 is stackable. Per the US5000 user manual, up to 16 modules can be paralleled on one battery bank and a maximum of 5 groups per CAN bus on a compatible inverter. DC bus, torque, SOC window (typical 5–95%) and charge-voltage limits are stated in §3 (electrical installation) and §4 (configuration) of the user manual.

Manufacturer: Shanghai Pylontech Technologies Co., Ltd. (Pylontech). Product model: US5000. The 20 kWh class on this page is built from four US5000 modules stacked in one cabinet per the US5000 user manual. The OEM manual revision used for the paralleling, torque, SOC and charge-voltage limits cited above is the US5000 user manual, Rev. 2.4, hosted on the Pylontech download portal — https://www.pylontech.com.cn/index.php?s=/cms/index/index/cat/45.html.