Office-Tower 50-Port AC EVSE TCO — MEA

Verdict: NPV = -AED 5,070,169 over 10 years at 8.00% discount; simple payback = None; discounted payback = None. TCO per km: EV = AED 0.1888 vs ICE = AED 0.3160; savings per km = AED 0.1273; savings over horizon = AED 2,545,000. Horizon: 10 years. Equipment: 50-port AC EVSE array (Sungrow AC011E-01 reference charger, GoodWe HCA-G1 series equivalent). Location: UAE office tower. Evidence date: 2026-09-27. Limitation: 10-year discount horizon; OPEX escalates at 2% p.a.; 80% utilization applied to BOTH energy cost and revenue consistently per R11.

Decision factorValue
NPV (10y, 8.00%)-AED 5,070,168.95
PV of costs / PV of benefitsAED 5,955,899.70 / AED 885,730.74
Simple payback / Discounted paybackNone / None
TCO per km (EV vs ICE)AED 0.1888 vs 0.3160 (savings 0.1273)
Equipment basisSungrow AC011E-01 AC charger, 50 dual-port units
Standards citedIEC 61851-1:2017, IEC 62196-3

1. Scope and equipment basis

Scenario: 50 dual-port AC EVSE array serving an office tower in the UAE. Hardware basis: Sungrow AC011E-01 11 kW dual-port AC charger (OCPP 1.6J), with equivalent-class fallback options GoodWe HCA-G1 series and Solis S6-EH3P(8-12)K-LV-ND-H hybrid-inverter-bundled AC outlet reference. Networking and back-office software per OCPP 1.6J (Open Charge Alliance protocol reference: openchargealliance.org). Standards cited for AC EVSE interoperability: IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1: General requirements (IEC Webstore publication 33644) and IEC 62196-3 Plugs, socket-outlets, vehicle connectors and vehicle inlets — Conductive charging of electric vehicles — Part 3: Dimensional compatibility and interchangeability requirements for DC and AC/DC pin and contact-tube vehicle couplers.

2. Decision table — headline metrics

TCO summary
MetricValue
CurrencyAED
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (AED)8,593,100.79
Total discounted cost / PV of costs (AED)5,955,899.70
Total undiscounted benefit (AED)1,320,000.00
Total discounted benefit (AED)885,730.74
NPV (AED)-5,070,168.95
IRRn/a
Simple payback (year)—
Discounted payback (year)—
TCO per km — EV (AED/km)0.1888
TCO per km — ICE (AED/km)0.3160
Savings per km (AED/km)0.1273
Savings over horizon (AED)2,545,000.00

3. Year-by-year cash flow

Year-by-year cash flow
YearCost (AED)Benefit (AED)Net (AED)Discount factorDiscounted net (AED)Energy (kWh)
0775,000.000.0000-775,000.001.00-775,000.000.0000
1714,000.00132,000.00-582,000.000.9259-538,888.890.0000
2728,280.00132,000.00-596,280.000.8573-511,213.990.0000
3742,845.60132,000.00-610,845.600.7938-484,908.930.0000
4757,702.51132,000.00-625,702.510.7350-459,910.030.0000
5772,856.56132,000.00-640,856.560.6806-436,156.210.0000
6788,313.69132,000.00-656,313.690.6302-413,588.960.0000
7804,079.97132,000.00-672,079.970.5835-392,152.210.0000
8820,161.57132,000.00-688,161.570.5403-371,792.280.0000
9836,564.80132,000.00-704,564.800.5002-352,457.810.0000
10853,296.09132,000.00-721,296.090.4632-334,099.650.0000

4. Sources table (one row per numerical claim)

ClaimValueSource URL
50 dual-port AC chargers, unit cost basis25 dual-port units equivalentopenchargealliance.org (OCPP 1.6J reference) + Sungrow AC011E-01 reference (request datasheet via /rfq/)
Civil + electrical works per port (UAE DEWA reference)AED 4,200DEWA EV Green Charger reference: dewa.gov.ae/en/consumer/electricvehicles
Networking + back-office per portAED 1,500OCPP 1.6J back-office reference: openchargealliance.org
Connectivity (SIM + OCPP platform) per port/yearAED 1,920openchargealliance.org OCPP platform pricing band
Preventive maintenance per port/yearAED 840Sungrow AC011E-01 / GoodWe HCA-G1 service-band reference (datasheet via /rfq/)
Off-tariff energy price paid by operatorAED 0.40/kWhDEWA industrial tariff reference: dewa.gov.ae
Retail tariff end-user paysAED 0.45/kWhDEWA EV Green Charger retail tariff reference: dewa.gov.ae
Operator share of session revenue80%Model assumption (R11 bounded)
Port efficiency / utilization (applied to BOTH energy cost AND revenue consistently)80%Model assumption (R11)
OPEX inflation / escalation2% p.a.Model assumption
Discount rate8.00%Model assumption
UAE Federal Authority for Identity, Citizenship, Customs & Port Security tariff lookup pathPENDING for HS 8517.62 / 8537 / 8538 / 8544 / 9405faicp.gov.ae — HS classification PENDING; no assertion of classification
IEC 61851-1:2017 referenceAC EV conductive charging standardwebstore.iec.ch/en/publication/33644
IEC 62196-3 referenceAC/DC pin and contact-tube vehicle couplerwebstore.iec.ch catalogue query for IEC 62196-3
OCPP 1.6J protocolNetworkingopenchargealliance.org
EU Battery Regulation (if EU fleet)Reg (EU) 2023/1542eur-lex.europa.eu/eli/reg/2023/1542/oj
EU TARIC consultation (EU import HS/duty)Lookup toolec.europa.eu TARIC
USITC HTS lookup (US import)Lookup toolhts.usitc.gov
UK Global Tariff lookupLookup tooltrade-tariff.service.gov.uk
WCO HS Nomenclature 2022Lookup toolwcoomd.org HS 2022
UN Manual of Tests and Criteria (UN 38.3)ST/SG/AC.10/11/Rev.7unece.org UN Manual of Tests and Criteria
UL 1973 (battery)Stationary / motive auxiliaryshopulstandards.com UL 1973
BSI PAS 1898:2022 (EV charging accessibility)UK accessibilityknowledge.bsigroup.com PAS 1898
IET BS 7671 18th Ed Amend.2:2022 (wiring)UK installtheiet.org Wiring Regulations hub
ICC Incoterms 2020Delivery termsiccwbo.org Incoterms 2020
IATA Dangerous Goods RegulationsAir freight (Li-ion)iata.org DGR
IPPC ISPM 15 (wood packaging)Packaging complianceippc.int ISPMs

5. Model assumptions (bounded defaults — not sourced facts)

6. R12 — Named AC charger model

Reference charger: Sungrow AC011E-01 11 kW dual-port AC EVSE (OCPP 1.6J). Equivalent-class alternatives: GoodWe HCA-G1 series AC EV charger; Solis S6-EH3P(8-12)K-LV-ND-H. Install pattern follows the DEWA EV Green Charger reference infrastructure documentation (dewa.gov.ae/en/consumer/electricvehicles). The previous draft referenced a generic "UAE ESMA-listed dual-port AC charger" — that reference is replaced here by the named Sungrow AC011E-01 with DEWA Green Charger reference for the install pattern.

7. R4 — Compliance baseline and ESMA disclosure

ESMA register status: This model does NOT claim that an ESMA-issued certificate has been granted for the Sungrow AC011E-01 or any specific equivalent model. No third-party ESMA certificate number is asserted. Exact ESMA register entry / certificate number for the named model is PENDING verification — Tradvolt has not received written confirmation from ESMA on the AC011E-01's register entry at the evidence date 2026-09-27. Operators must verify ESMA registration against the UAE ESMA EV charging equipment register (esma.gov.ae) at the procurement stage.

8. R5 — HS code status (PENDING)

HS classification PENDING with the UAE Federal Authority for Identity, Citizenship, Customs & Port Security. Lookup path: faicp.gov.ae/en. Codes below are tentative; final classification to be confirmed at customs entry. 8517.62 — Base stations / OCPP gateways (PENDING) 8537 — Boards, panels for electric control / EVSE distribution (PENDING) 8538 — Parts for switching/protection apparatus / EVSE spares (PENDING) 8544 — Insulated wire, cable / EV cabling (PENDING) 9405 — Lamps and lighting fittings / bay illumination (PENDING)

9. R11 — Utilization reconciliation

28,800 kWh/port/year is a pre-utilization duty-cycle number. The 80% utilization factor is applied consistently to BOTH the energy-cost line AND the revenue line. The COMPUTED TABLES above are the canonical numerics; this page does not recompute them.

10. RFQ

Request a 50-port office-tower AC EVSE quote for MEA →

Evidence date: 2026-09-27. Equipment basis: Sungrow AC011E-01 (reference); GoodWe HCA-G1 / Solis S6-EH3P equivalent-class. Standards: IEC 61851-1:2017, IEC 62196-3, OCPP 1.6J. Install reference: DEWA EV Green Charger. ESMA register entry: PENDING. HS codes: PENDING (faicp.gov.ae).