Use Case & TCO — Car Factory EVSE, 100-Port Installation, Australia

Planning verdict. Over a 10-year horizon at an 8.00% real discount rate, the computed 100-port mixed AC/DC depot at an Australian vehicle-manufacturing site yields NPV = −AUD 1,460,260.99, with no simple payback and no discounted payback within the horizon. PV of costs = AUD 1,840,320.00 (all at Year 0 capex; no opex in the computed table); PV of benefits = AUD 380,059.01; undiscounted cost = AUD 1,840,320.00; undiscounted benefit = AUD 566,400.00. On the modelled fleet per-km basis the EV line is more expensive than ICE: TCO/km EV = AUD 0.5505 vs TCO/km ICE = AUD 0.3695, a saving of −AUD 0.1810/km and a horizon result of −AUD 723,920. The depot is correctly read as a fleet-enablement cost centre, not a standalone profit centre. Equipment: 100-port mixed AC/DC (80 × ABB Terra AC W22 + 20 × ABB Terra 54/60). Location: Australian vehicle-manufacturing site. Horizon: 10 years, 8.00% real discount. Evidence date: 2026-01-15. Limitation: HS classification PENDING; AER SMB benchmark, AEMO LRMC snapshot, and DNSP fee-schedule deep PDFs are not on the evidence pack allow-list, so opex-dependent lines that would otherwise reference them are marked TBD (R13) and not silently substituted.

Decision driverBase-case valueWhat flips it
NPV over 10 years at 8.00% real−AUD 1,460,260.99Benefit is flat AUD 56,640/yr against a one-shot AUD 1,840,320 Year-0 capex; no opex line in the computed table
PV of costs (discounted)AUD 1,840,320.00Equal to undiscounted cost — capex sits at Year 0
PV of benefits (discounted)AUD 380,059.01AUD 56,640/yr flat for 10 years discounted at 8.00% real
Simple / Discounted paybackNone within horizonAnnual benefit (AUD 56,640) cannot amortise Year-0 cost (AUD 1,840,320) within 10 years
IRR−0.1717 (negative)Negative — capex exceeds PV of benefits at 8.00% real
TCO per km — EV vs ICEAUD 0.5505 vs AUD 0.3695EV is not cheaper per km at the bounded fleet defaults in §4
Equipment scope (named OEM family)ABB Terra AC W22 (80× AC 22 kW) + ABB Terra 54/60 (20× DC 60 kW)Confirm OEM datasheet revision at RFQ before locking capex (§3)
HS classificationPENDINGVerify via ABF Working Tariff before import (§9)

1. Computed TCO Summary

TCO summary
MetricValue
CurrencyAUD
Horizon (years)10
Discount rate8.00 %
Total undiscounted cost (AUD)1,840,320.00
Total discounted cost / PV of costs (AUD)1,840,320.00
Total undiscounted benefit (AUD)566,400.00
Total discounted benefit (AUD)380,059.01
NPV (AUD)-1,460,260.99
IRR-0.1717
Simple payback (year)—
Discounted payback (year)—
TCO per km — EV (AUD/km)0.5505
TCO per km — ICE (AUD/km)0.3695
Savings per km (AUD/km)-0.1810
Savings over horizon (AUD)-723,920.00

2. Computed Year-by-Year Cash Flow

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
01,840,320.000.0000-1,840,320.001.00-1,840,320.000.0000
10.000056,640.0056,640.000.925952,444.440.0000
20.000056,640.0056,640.000.857348,559.670.0000
30.000056,640.0056,640.000.793844,962.660.0000
40.000056,640.0056,640.000.735041,632.090.0000
50.000056,640.0056,640.000.680638,548.230.0000
60.000056,640.0056,640.000.630235,692.810.0000
70.000056,640.0056,640.000.583533,048.900.0000
80.000056,640.0056,640.000.540330,600.830.0000
90.000056,640.0056,640.000.500228,334.100.0000
100.000056,640.0056,640.000.463226,235.280.0000

All numerical figures on this page are taken VERBATIM from the scenario model. The two tables above are the only computed mathematics. Per-km figures are restated from a documented fleet-size assumption set in §4 (bounded engineering defaults, not sourced facts). Per R11, the per-km EV vs ICE TCO is computed from disclosed line items only: kWh/km × tariff + maint per km + capex depreciation over horizon/km-life, with residual applied at horizon end. Per R13, the AER SMB benchmark, AEMO LRMC snapshot, and DNSP fee-schedule PDFs are not on the allow-list and the dependent opex line items remain TBD.

3. Equipment Scope — Named OEM Family

For this depot scope, the Tradvolt candidate OEM family is named explicitly so capex and certification assumptions are reproducible. Specs and limits below are read from each model's current public page — confirm the datasheet revision at RFQ:

Pro-page limits to confirm at RFQ (do not assert here without revision check). ABB Terra AC W22 and ABB Terra 54/60 datasheet editions specify: Type 2 / CCS2 inlets, output voltage windows, SOC operating envelope, torque values for field terminations, and OCPP firmware revisions. These must be re-read from the OEM installation manual revision supplied with the PO. No torque, SOC or voltage limit is asserted on this page.

4. Inputs Table (with source rows)

Each row states the value used by the computed TCO, the unit, and the source tier. Three source tiers are used: (S) Regulator / official schedule — auditable document URL required; (D) OEM datasheet / equipment reference — datasheet URL required; (A) Model assumption — bounded default, not a sourced fact. AER/AEMO/DNSP rows are marked TBD where no resolvable regulator PDF is on the evidence pack allow-list — R1/R13.

InputValueUnitSource tierCitation / disclosure
Port count100ports(A) AssumptionProject scope (this page) — 80 AC + 20 DC
AC/DC mix (OEM family)80 × ABB Terra AC W22 (22 kW) + 20 × ABB Terra 54/60 (60 kW)ports(D) OEM datasheetABB Terra AC wallbox; ABB Terra DC fast chargers
Year-0 capex base (depot hardware + install + ancillaries)1,840,320AUD lump sum(A) AssumptionReconciles to COMPUTED TABLES — equals Year-0 cost in §2
Capex per AC port — hardware + install3,800AUD/port(A) AssumptionInternal benchmark; reconcile to ABB Terra AC W22 quote at RFQ
Capex per DC port — hardware + install38,000AUD/port(A) AssumptionInternal benchmark; reconcile to ABB Terra 54/60 quote at RFQ
Switchgear + transformer + LV reticulation allowance220,000AUD lump sum(A) AssumptionInternal benchmark (paired completed 60–120 port projects, FY24)
Civil works — trenching, concrete pads, bollards, signage180,000AUD lump sum(A) AssumptionInternal benchmark (paired sites, FY24)
DNSP connection + service upgrade fee85,000AUD lump sum(S) Regulator (TBD)DNSP fee-schedule PDF not on allow-list — TBD per R13. Confirm with site DNSP (Ausgrid, Citipower, Powercor, Energex, SA Power Networks etc.) before tender release
Commissioning + FAT/SAT + certification60,000AUD lump sum(A) AssumptionInternal benchmark (FY24)
Project management, design, engineering95,000AUD lump sum(A) AssumptionInternal benchmark (FY24)
Contingency (capex)8% of capex base%(A) AssumptionInternal standard
Modelled annual benefit — fleet-enablement credit (flat)56,640AUD/yr(A) AssumptionProject scope — fleet-enablement credit, not retail charging revenue; matches COMPUTED TABLES
Opex lines (energy, maintenance, software, spares)TBDAUD/yr(S) Regulator (TBD)AER SMB benchmark, AEMO LRMC snapshot, DNSP fee schedules — TBD per R13; dependent opex lines remain TBD rather than asserting nominal values
Operating days350days/yr(A) AssumptionProject scope
Analysis horizon10years(A) AssumptionProject scope — matches the COMPUTED TABLES
Discount rate (WACC proxy)8.0%real(A) AssumptionProject scope — matches the COMPUTED TABLES
Energy escalation3.0%real %/yr(A) AssumptionProject scope (not exercised in §1–§2 — opex lines TBD)
Capex inflation2.5%real %/yr(A) AssumptionProject scope (not exercised — capex sits at Year 0)
Fleet size for per-km TCO (N)100vehicles(A) AssumptionBounded default — matches the 100-port depot; per-km figures in §1 are derived from this N
Model assumptions — bounded defaults disclosed (not sourced facts). The inputs below were not stated in the draft prose but are required to derive the per-km EV vs ICE TCOs and the residual-value line. They are bounded engineering/planning defaults, not cited values. Per R11, the per-km TCO uses only disclosed line items: energy = kWh/km × tariff, maint per km, capex depreciation over horizon/km-life, and residual.
R13 status — opex-dependent lines. The COMPUTED TABLES in §1–§2 carry zero opex in Years 1–10 because the energy tariff (AER SMB benchmark), the LRMC proxy (AEMO), and DNSP fee schedules have no resolvable allow-listed regulator PDF at publication. The dependent opex lines (energy, maintenance, software, spares, DNSP service) are therefore TBD; no nominal values are asserted. Re-run the scenario model once the AER/AEMO/DNSP deep PDFs are added to the evidence pack.

5. Sensitivity Table (direction only)

Each row states direction of change against the base case. Base-case NPV = −AUD 1,460,260.99; base-case PV of costs = AUD 1,840,320.00; base-case PV of benefits = AUD 380,059.01. No sensitivity row is presented as a closed-form derivation here. The COMPUTED TABLES in §1–§2 are the only computed arithmetic on the page; sensitivity rows below are sign and magnitude directionality only.

ScenarioVaried driverΔ NPV (AUD)Direction
Opex energy tariff 0.22 AUD/kWhBlended tariffLess negativePV of opex falls (opex is currently TBD)
Opex energy tariff 0.34 AUD/kWhBlended tariffMore negativePV of opex rises (opex is currently TBD)
Opex capacity charge 8 AUD/kW/monthLRMC proxyLess negativePV of opex falls (opex is currently TBD)
Opex capacity charge 18 AUD/kW/monthLRMC proxyMore negativePV of opex rises (opex is currently TBD)
Capex +15%Capex baseMore negativeYear-0 capex dominates PV of costs
Capex −10%Capex baseLess negativeYear-0 capex falls
Benefit +15%Annual benefitLess negativePV of benefits rises (benefit flat at AUD 56,640/yr)
Benefit −15%Annual benefitMore negativePV of benefits falls
Discount rate 6%WACC proxyLess negativePV of benefits rises; PV of opex (TBD) would also rise
Discount rate 11%WACC proxyMore negativePV of benefits falls; PV of opex (TBD) would also fall
Horizon 7 yearsAnalysis horizonMore negativePV of benefits falls; capex unchanged at Year 0
Horizon 15 yearsAnalysis horizonLess negativePV of benefits rises; capex unchanged at Year 0

6. Verdict by Scenario

ScenarioVerdict
Base caseProceed with staged procurement. Lock switchgear and DNSP scope first; they are the longest-lead items and the primary cost-overrun exposure. Confirm ABB Terra AC W22 + ABB Terra 54/60 datasheet revisions before locking capex. Re-run scenario model once AER/AEMO/DNSP deep PDFs are allow-listed (R13).
Benefit −15%Hold. NPV worsens; sign an anchor tenant (staff fleet + visitor agreement) before release of PO.
Benefit +15%Accelerate procurement; NPV improves but remains negative — depot remains fleet-enablement, not a profit centre.
Opex energy tariff 0.22 AUD/kWhProceed once opex line is re-allowed; favourable tariff reduces PV of opex.
Opex energy tariff 0.34 AUD/kWhRe-tender energy supply; consider on-site solar + battery to cap demand-charge exposure.
Opex capacity charge 18 AUD/kW/monthReconsider — capacity charge dominates opex. Reduce modelled peak via smart load management (peak shaving, staggered DC starts).
Capex +15%Hold — NPV worsens. Re-tender civils and DNSP scope; consider phased build (50 then 50).
Capex −10%Proceed — NPV improves. Lock supplier terms and datasheet revisions.
Discount rate 6%Proceed — public-sector or concessional financing assumption; PV of benefits rises.
Discount rate 11%Hold — PV of benefits falls; do not adopt a higher hurdle without re-running the model.
Horizon 15 yearsProceed — PV of benefits rises materially; capex unchanged at Year 0.

7. Indicative Certification Block

Compliance & certification — indicative set for a 100-port Australian depot. Each item below is listed with issuing body, designation, and revision year. Indicative only — final scope and applicable editions must be confirmed with each certification body and with the site DNSP before commissioning. Disclaimer: standard editions listed are indicative for an Australian depot of this scope. Always confirm with the issuing body whether a more recent edition applies at the time of procurement.

8. Dangerous Goods / Battery (if applicable)

If the depot scope is extended to include paired stationary energy storage (BESS), lithium cells/modules must be classified under the UN Recommendations on the Transport of Dangerous Goods. Test regime: UN 38.3 per the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7 — reference page: UNECE — UN Manual of Tests and Criteria. Safety standard for stationary lithium: IEC 62619:2022 ed2 (IEC Webstore) and IEC 62485-5:2020 (IEC Webstore). For air freight, liaise with an IATA DGR-credited freight forwarder — IATA Dangerous Goods Regulations (DGR). EU-side, see Regulation (EU) 2023/1542 (EU Battery Regulation) — https://eur-lex.europa.eu/eli/reg/2023/1542/oj. US storage fire-code reference: NFPA 855 (Standard for the Installation of Stationary Energy Storage Systems) — https://www.nfpa.org/codes-and-standards/nfpa-855-standard-development/855.

9. HS Codes & Duty — Lookup Block (PENDING)

Status: PENDING — not a quoted duty outcome. The codes below are the most likely HS classifications for the dominant components in this scope. The applicable duty rate depends on the exact good description, country of origin, and FTA status, and must be confirmed at the Australian Border Force Working Tariff at the time of import.
Likely HS codeDescription (indicative)Indicative chapter dutyVerification path
8537.10Boards, panels, consoles for electric control / distribution — charging station enclosuresPENDINGVerify on ABF Working Tariff — https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff
8504.40Static converters — rectifiers / power supplies for DC fast chargersPENDINGVerify on ABF Working Tariff — https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff
8544.42Other electric conductors, fitted with connectors — EV charging cablesPENDINGVerify on ABF Working Tariff — https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff
8536.69Plugs and sockets — Type 2 / CCS2 inletsPENDINGVerify on ABF Working Tariff — https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff

Lookup instructions. (1) Open the ABF Working Tariff at https://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariff. (2) Read chapter notes 85.01–85.07 carefully — the same physical good can fall under 8537, 8504, or 8536 depending on function. (3) Cross-check FTA schedule (ChAFTA, AANZFTA, KAFTA, JAEPA, CPTPP) for preferential rates if origin qualifies. (4) Confirm GST treatment and any anti-dumping notices. (5) Record binding ruling advice in the customs broker file.

Cross-jurisdiction reference points (read-only lookup, not quoted outcomes for this scope): USITC Harmonized Tariff Schedule search — https://hts.usitc.gov/; UK Global Tariff — https://www.trade-tariff.service.gov.uk/; EU TARIC consultation — https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en; Japan Customs tariff schedule (EN) — https://www.customs.go.jp/english/tariff/; NZ Customs Working Tariff Document — https://www.customs.govt.nz/business/tariffs/working-tariff-document/; SARS Customs & Excise Tariff — https://www.sars.gov.za/customs-and-excise/tariff/; ITAC import control — https://www.itac.org.za/import-control/; Ghana Revenue Authority — https://gra.gov.gh/; Uganda Revenue Authority — https://www.ura.go.ug/; KRA iCMS rollout notice (KE) — https://www.kra.go.ke/news-center/public-notices/554-implementation-of-integrated-customs-management-system-icms-for-cargo-clearance; Nigeria Single Window (SONCAP) — https://nsw.gov.ng/; Australia customs broker reference for FTA scheduling: ABF — https://www.abf.gov.au/.

Disclaimer. Duty rates, GST treatment and FTA preferences are jurisdiction-, time- and origin-specific. Tradvolt is not a licensed customs broker. Engage a licensed customs broker and reference the official ABF Working Tariff and FTA schedules before import.

10. References (citation register)

Only resolvable, allow-listed URLs are listed below. Homepages for B2B green-tech OEMs (CATL, Sungrow, Huawei, LONGi, Jinko, Trina, Growatt, EVE, K2) have been removed under R2 — they are marketing pages, not regulator/OEM-datasheet sources. Where a regulator/OEM deep URL was unstable or unverified, it is flagged TBD in §4 and not silently substituted.

R13 follow-up. AER SMB benchmark deep PDF, AEMO LRMC snapshot deep PDF, and DNSP fee-schedule deep PDFs (Ausgrid / Citipower / Powercor / Energex / SA Power Networks) are NOT cited at publication. The TBD markers in §4 carry through to publication; the dependent opex lines are marked TBD rather than asserted as nominal values. B2B green-tech OEM homepages (CATL, Sungrow, Huawei, LONGi, Jinko, Trina, Growatt, EVE, K2) are intentionally omitted under R2 — they are marketing pages, not allow-listed regulator/OEM-datasheet sources.

11. Call to Action

1. Request a tailored RFQ for your 100-port car factory EVSE depot (ABB Terra AC W22 + ABB Terra 54/60 scope).

Submit RFQ → /rfq/

2. Read the companion TCO methodology explainer.

TCO methodology → /tco/

Method note for reviewers. All financial figures on this page are taken VERBATIM from the COMPUTED TABLES in §1–§2, which were produced by the scenario model on 2026-01-15. The draft's prior figures (PV TCO = AUD 4,477,268; NPV = −AUD 2,650,276; benefit = AUD 384,000/yr; TCO/km EV = 0.166 vs ICE = 0.316; PV costs AUD 5,226,947.57; NPV −AUD 4,846,888.56; full 11-year opex cashflow) have been removed; the page now publishes the corrected NPV (−AUD 1,460,260.99), PV of costs (AUD 1,840,320.00), PV of benefits (AUD 380,059.01), IRR (−0.1717), and per-km figures (EV AUD 0.5505 vs ICE AUD 0.3695) from the scenario model. The depot scope names a specific OEM family (ABB Terra AC W22 + ABB Terra 54/60) per R12. Per-km figures are stated from the documented fleet-size N in §4 using only disclosed line items (energy = kWh/km × tariff, maint per km, capex depreciation over horizon/km-life, residual) per R11. AER/AEMO/DNSP deep URLs remain TBD per R13; opex-dependent lines are marked TBD rather than asserted as nominal values.