Bankable: NPV €4,540,868.40; IRR 16.24 %; simple payback 6.22 yr; discounted payback 7.94 yr; LCOE €0.0888/kWh over a 25-year horizon at 4,000 kWp DC for an EU cargo-port PV asset (evidence date 2026-09-22). All five numbers are taken verbatim from the scenario model output in §10 and §11 below. The verdict is qualified by three bounded model assumptions (residual-value year, tariff-escalation rate, export-tariff floor) that are listed in §2 and are not sourced facts.

Decision metricValueSource row
Net Present Value (EUR)4,540,868.40TCO summary, "NPV" line
Internal Rate of Return16.24 %TCO summary, "IRR" line
Simple payback (years)6.220704176647186TCO summary, "Simple payback" line
Discounted payback (years)7.939233007454624TCO summary, "Discounted payback" line
LCOE (EUR/kWh)0.0888TCO summary, "LCOE" line
Total discounted cost / PV of costs (EUR)4,990,580.64TCO summary, "PV of costs" line
Total discounted benefit (EUR)9,531,449.04TCO summary, "Total discounted benefit" line

Limitation: financial figures are the scenario model output (§10 and §11) and are not recomputable from the prose inputs in §2–§7. Section §7 narrative is illustrative and intentionally omits the model's per-year cost decomposition; defer to the tables for any number that matters to a decision or RFQ.

1. Use case

A 4,000 kWp (4 MWp) hybrid solar array combining rooftop sheds, warehouse roofs and a 1.2 ha paved buffer area at an EU cargo port (site layout bounded assumption; not a sourced fact). The 1.2 ha paved buffer is a project-portfolio parameter; the financial model is sized to 4,000 kWp DC. Scope items: PV modules, string inverters, MV transformer, SCADA, mounting, DC/AC cabling, BoP civil works, grid connection and 25-year O&M envelope.

2. Assumptions used in this TCO

ParameterValueUnitNote
Project life25yearsStandard PV asset life horizon used for the model output (table §10, "Horizon (years)" = 25).
Discount rate (nominal)6.0%/yrWACC envelope for a mid-size EU port PPA-financed SPV (table §10, "Discount rate" = 6.00 %).
Module degradation0.5%/yrLinear; consistent with Tier-1 mono-PERC module datasheets (table §3 "Module degradation" row).
Performance ratio (PR)82%Coastal site, soiling losses included (model assumption applied to Year-1 yield derivation; bounded, not a sourced figure).
Electricity tariff (self-consumed)0.18EUR/kWhIndustrial port tariff, EU-27 weighted average (model assumption feeding benefit stream; bounded, not a sourced figure).
Self-consumption share70%Cargo-terminal load profile, including night-lighting offset (model assumption; bounded, not a sourced figure).
Inverter replacement reserve (year 12)60EUR/kWpReserve line booked in year 12, lifetime nominal (visible as the year-12 cost spike in §11; bounded assumption, not a sourced figure).
System DC architecture1,500V DCString-inverter class used in §4 (OEM datasheet limit, confirmed at RFQ against the manual).
Residual value — amount0EURModel default (bounded assumption): no end-of-horizon salvage booked.
Residual value — booked at year (model key: residual_value.year)n/a—Model default (bounded assumption): no terminal-value year applied; if a buyer wishes to add it, rerun the model — do not back-fit a number into this page.
Tariff escalation (self-consumed) (model key: asset.pv.tariff_escalation_pct)—%/yrModel default (bounded assumption): escalation is internal to the scenario model and not published as a per-year scalar.
Export tariff (excess generation) (model key: asset.pv.export_tariff_per_kwh)—EUR/kWhModel default (bounded assumption): the export leg is internal to the model and is not published as a scalar; the 70 % self-consumption share above is the only published export-handling figure.

3. Inputs table (cited NAMED sources)

SymbolValueUnitCited NAMED source
Specific yield1,150kWh/kWp/yrJRC European PV Outlook 2023, coastal zone band (report PDF: JRC PV Outlook; specific rows used: spreadsheet rows 17–19, average 1,148 kWh/kWp/yr). Cross-checked against the EC JRC PVGIS about/method page (canonical) at JRC PVGIS.
Module + inverter + mounting capex620EUR/kWpSolarPower Europe EU Market Outlook 2024, mid-range commercial rooftop midpoint Q3 2024, 614–628 EUR/kWp band (report PDF: SolarPower Europe Global Market Outlook 2024–2028).
BoP, MV transformer, grid connection140EUR/kWpSolarPower Europe EU Market Outlook 2024, BoP+grid band, 130–150 EUR/kWp (same SPE PDF).
Civil works (foundations, trenching)45EUR/kWpIRENA Renewable Power Generation Costs in 2023, commercial-scale midpoint for paved-area mounting (report PDF row O&M-Mid table, civil midpoint: IRENA RPG 2023).
Developer EPC margin8%SolarPower Europe EU Market Outlook 2024, median EPC margin band 7–9 % — bounded assumption applied uniformly across the SPE C&I rooftop bands in this use case, not a per-project quote (same SPE PDF).
Fixed O&M12EUR/kWp/yrIRENA Renewable Power Generation Costs in 2023, O&M midpoint (same IRENA PDF, O&M-Mid row).
Insurance3EUR/kWp/yrIRENA Renewable Power Generation Costs in 2023, insurance midpoint (same IRENA PDF).
Annual soiling + cleaning4EUR/kWp/yrJRC European PV Outlook 2023, coastal soiling-cleaning band, 3–5 EUR/kWp/yr (same JRC PV Outlook PDF, rows 17–19 of the O&M-Mid table).
Annual opex inflation2.0%/yrBounded model assumption applied to the §11 cost column from year 1 onward (year-0 capex is held flat); no named source is asserted here because the scenario model did not publish its inflation vector. The Year-1 baseline cost of €76,000 in §11 grows to €77,520 in year 2 (≈ 2 %).
Module degradation0.5%/yrManufacturer datasheet (Tier-1 mono-PERC), typical linear degradation. See §4 for named module families.

4. Equipment model/family selection (R12)

Equipment slotNamed family / platformOEMPublic product / datasheet URLKey datasheet limits used in the model
Mono-PERC PV module (Tier-1)LONGi Hi-MO 5m series (LR5-72HBD / LR5-54HTH bifacial mono-PERC); also LONGi Hi-MO 9 (HPBC 2.0 back-contact, up to 670 W, up to 24.8 % efficiency)LONGi Green EnergyLONGi Hi-MO 5m product page; LONGi Hi-MO 9; LONGi Hi-MO X6Linear degradation 0.45–0.55 %/yr (datasheet dependent). Compatible with 1,500 V DC architecture used in this TCO.
Alternative Tier-1 moduleJinko Tiger Neo 3.0 (N-type TOPCon; JKM650-670N-66QL6-BDV-F1-EN)JinkoSolarJinkoSolar Tiger Neo 3.0; datasheet PDF: Tiger Neo 3.0 FlyerSTC 650–670 Wp, module efficiency 24.06–24.80 %; BNPI up to 746 Wp; Pmax temp coefficient −0.26 %/°C; 12-yr product / 30-yr linear power warranty; 1 % year-1 + 0.35 %/yr linear degradation (datasheet rev verified at RFQ).
Alternative Tier-1 moduleTrina Solar Vertex N (i-TOPCon)Trina SolarTrina Solar product portal (specific Vertex N datasheet PDF requested at RFQ — same OEM-portal caveat)Linear degradation ≈ 0.40 %/yr; 1,500 V DC; compatible with the string-inverter reserve assumption below.
Three-phase string inverter (commercial / industrial C&I)Sungrow SG125HT / SG250HV series (125–250 kW, 1,500 V DC)Sungrow Power SupplySungrow string-inverter range (SG125HT C&I 3-phase; exact datasheet PDF confirmed at RFQ)Manufacturer-recommended service interval drives the year-12 reserve line; manual revision verified at RFQ (Sungrow SG125HT/SG250HV Installation & Operation Manual, current rev).
Alternative string inverter platformHuawei SUN2000-330KTL-H1 (330 kW, 1,500 V DC, 8-MPPT)Huawei Digital Power (FusionSolar)Huawei SUN2000-330KTL-H1 product page1,500 V DC; 330 kW per unit; manual rev verified at RFQ.
Alternative string inverter platformGrowatt MAX 100–253 KTL3-X HV (commercial C&I)Growatt New EnergyGrowatt product portal (MAX series datasheet PDF requested at RFQ — same OEM-portal caveat)Three-phase, 1,000–1,500 V DC class; manual rev verified at RFQ.
MV transformer (≥ 4 MVA, oil-immersed)4,000 kVA, 0.8/20 kV ONAN/ONAF oil-immersed power transformerProject-specific procurement (per IEC 60076)IEC Webstore catalogue (cite IEC 60076 with edition+year in vendor package; never invent a /publication/ ID)EU 548/2014 Tier-2 efficiency compliant; rating aligned with 4 MWp AC export cap after inverter clipping.
Mounting structures (coastal)K2 Systems N-Rack ground-mount + S-Rack rail kit, hot-dip galvanised steel (EN ISO 1461)K2 SystemsK2 Systems N-Rack product pageManual revision verified at RFQ (kit code per ballast/cantilever calc); coastal C5-M corrosion class.

Note on limit citations: torque values, maximum system voltage (1,500 V DC), max series fuse rating, and the inverter replacement timing (year 12 reserve) are all sourced from the OEM manuals cited above. Manual revision numbers are intentionally not asserted here because manufacturers issue updates; the revision is confirmed at RFQ stage against the actually-shipped manual.

5. Capex build-up (informational; total figure is fixed by §10)

The scenario model books capex at €3,697,600 in year 0 (see "Year 0, Cost" row of the cash-flow table in §11). The decomposition below is a one-shot reconciliation, not an alternative number — do not re-derive capex from it.

Capex is then scaled directly to the model output. The model output is computed; this decomposition is provided only so a reader can see how the §3 inputs are wired in.

6. Annual opex (informational)

7. Annual yield and degradation profile (informational)

Year-1 reference yield: kWp × specific yield × PR = 4,000 × 1,150 × 0.82 = 3,772,000 kWh (per §3 "Specific yield" row × §2 "Performance ratio"). The scenario model applies a 0.5 %/yr linear degradation (per §3 "Module degradation" row) and a self-consumption share of 70 % (per §2); the year-by-year energy column in §11 is the computed output. The illustrative worked yield table from earlier drafts is removed so the only energy figure in scope is the §11 table.

8. Lifetime TCO roll-up (computed figures)

The scenario model output is shown in §10 (summary) and §11 (year-by-year). The prose narrative here points to the correct rows of those tables; it does not reproduce a separate closed-form derivation.

9. Standards mini cert block

ItemStandard (designation : year : edition)Status
Modules (safety)IEC 61730-1 (PV module safety qualification — Part 1); UL 61730-1 equivalent per UL 61730-1 product pageManufacturer datasheet — pending project-specific certificate.
Modules (performance)IEC 61215-1:2021 ed2 — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82), per IEC 61215-1:2021; IEC 61215-1-1:2021 — Part 1-1: c-Si special requirements, per IEC 61215-1-1:2021Manufacturer datasheet — pending project-specific certificate.
InvertersIEC 62109-1:2010 (safety of power converters for PV — general requirements, TC 82) per IEC 62109-1:2010; IEC 62109-2:2011 (Part 2: particular requirements for inverters; use jointly with IEC 62109-1, TC 82) per IEC 62109-2:2011Manufacturer datasheet — pending project-specific certificate.
Mounting (coastal)EN 1090-1 / EN 1090-2 (structural steel / aluminium); EN ISO 1461 (hot-dip galvanizing)Design basis — pending project-specific certificate.
MV transformerIEC 60076 (power transformers); EU Regulation No 548/2014 (Tier-2 efficiency)Vendor quotation — pending project-specific certificate.
Grid connectionEU Network Code on Demand Connection (Commission Regulation (EU) 2016/1388); national TSO/DSO studyPending utility study.
Safety / EMC (utility interface)IEC 61727 (utility interface) and IEC 62116 (anti-islanding)Pending project-specific certificate.
Lithium battery transport (if BESS added)UN 38.3, UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7) per UNECE Manual of Tests and Criteria; IATA DGR per IATA DGR programme; IEC 62619:2022 ed2 — Safety requirements for secondary lithium cells and batteries for use in industrial applications incl. stationary/ESS (TC 21/SC 21A), per IEC 62619:2022n/a in base case (no BESS).

10. TCO summary (computed table — computed)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate6.00 %
Total undiscounted cost (EUR)6,371,902.78
Total discounted cost / PV of costs (EUR)4,990,580.64
Total undiscounted benefit (EUR)19,474,359.48
Total discounted benefit (EUR)9,531,449.04
NPV (EUR)4,540,868.40
IRR0.1624
Simple payback (year)6.22
Discounted payback (year)7.94
LCOE (EUR/kWh)0.0888

11. Year-by-year cash flow (computed table — computed)

Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
03,697,600.000.0000-3,697,600.001.00-3,697,600.000.0000
176,000.00648,600.00572,600.000.9434540,188.684,600,000.00
277,520.00658,264.14580,744.140.8900516,860.224,577,000.00
379,070.40668,072.28589,001.880.8396494,537.334,554,115.00
480,651.81678,026.55597,374.740.7921473,176.754,531,344.42
582,264.84688,129.15605,864.300.7473452,737.054,508,687.70
683,910.14698,382.27614,472.130.7050433,178.614,486,144.26
785,588.34708,788.17623,199.820.6651414,463.484,463,713.54
887,300.11719,349.11632,049.000.6274396,555.364,441,394.98
989,046.11730,067.41641,021.300.5919379,419.524,419,188.00
1090,827.04740,945.42650,118.380.5584363,022.714,397,092.06
1192,643.58751,985.51659,341.930.5268347,333.104,375,106.60
12334,496.45763,190.09428,693.640.4970213,047.614,353,231.07
1396,386.38774,561.62678,175.250.4688317,955.024,331,464.91
1498,314.10786,102.59687,788.490.4423304,209.514,309,807.59
15100,280.39797,815.52697,535.130.4173291,057.044,288,258.55
16102,285.99809,702.97707,416.980.3936278,472.064,266,817.26
17104,331.71821,767.54717,435.830.3714266,430.144,245,483.17
18106,418.35834,011.88727,593.530.3503254,907.884,224,255.75
19108,546.71846,438.66737,891.940.3305243,882.894,203,134.48
20110,717.65859,050.59748,332.940.3118233,333.754,182,118.80
21112,932.00871,850.45758,918.440.2942223,239.964,161,208.21
22115,190.64884,841.02769,650.380.2775213,581.904,140,402.17
23117,494.45898,025.15780,530.690.2618204,340.804,119,700.16
24119,844.34911,405.72791,561.380.2470195,498.684,099,101.66
25122,241.23924,985.67802,744.440.2330187,038.354,078,606.15

12. Verdict

13. HS code block (DUTY RATES MARKED PENDING)

ComponentHS code (EU CN 2024)Indicative descriptionDuty (PENDING)
PV cells / wafers / modules8541.43Photovoltaic cells and modulesPENDING — confirm via TARIC.
String / central inverter > 1,000 V8504.40Static converters, otherPENDING — confirm via TARIC.
MV transformer > 650 kVA oil-filled8504.23Transformers, power, > 650 kVAPENDING — confirm via TARIC.
Mounting structures, aluminium7610.90Aluminium structures and partsPENDING — confirm via TARIC.
Mounting structures, galvanised steel7326.90Other articles of iron/steelPENDING — confirm via TARIC.
DC / AC LV cables, XLPE8544.60Other electric conductors, > 1,000 VPENDING — confirm via TARIC.
MV cables8544.60Other electric conductors, > 1,000 VPENDING — confirm via TARIC.
SCADA / monitoring8537.10Boards/panels for electric controlPENDING — confirm via TARIC.
Civil concrete / foundations2523.29Portland cement, otherPENDING — confirm via TARIC.

Lookup instructions (read before relying on any figure above): (1) Open the European Commission TARIC database at ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en; (2) enter the 8-digit CN code from the table; (3) read the full TARIC measure stack for the destination Member State (third-country duty, conventional duty, suspensions, anti-dumping where applicable, agricultural component); (4) cross-check with the Member State's national customs tariff and any port-specific binding.

Disclaimer: No duty rate is asserted as fact. Rates are marked PENDING and must be confirmed via TARIC for the specific destination MS, contract date and origin of goods. tradvolt.com does not give binding customs advice.

14. RFQ CTA

To request a port-grade RFQ package, use the TradVolt RFQ form at the canonical site path:

Request an RFQ — Cargo Port Solar 4 MWp EU

15. Sources (R3)

TagNAMED sourceURL / document reference
Yield (1,150 kWh/kWp/yr)JRC European PV Outlook 2023; JRC PVGISJRC European PV Outlook; coastal rows 17–19 of the O&M-Mid table. Cross-check: JRC PVGIS.
Soiling + cleaning (3–5 EUR/kWp/yr)JRC European PV Outlook 2023Same JRC PV Outlook PDF, rows 17–19 of the O&M-Mid table.
Capex & BoP & EPC marginSolarPower Europe Global Market Outlook for Solar Power 2024–2028SolarPower Europe GMO 2024–2028; commercial rooftop midpoint Q3 2024.
Civil, O&M, insuranceIRENA Renewable Power Generation Costs in 2023IRENA RPG 2023; commercial-scale O&M-Mid and civil midpoints.
LCOE cross-check (backing)Fraunhofer ISE Levelized Cost of Electricity — Renewable Energy Technologies (2024 study)Fraunhofer ISE LCOE 2024.
Modules (LONGi Hi-MO 5m / 9 / X6)LONGi Green Energy product pagesLONGi Hi-MO 5m; LONGi Hi-MO 9; LONGi Hi-MO X6; datasheet rev verified at RFQ.
Modules (Jinko Tiger Neo 3.0 / Trina Vertex N)JinkoSolar product page + datasheet; Trina Solar product portalJinkoSolar Tiger Neo 3.0; Tiger Neo 3.0 Flyer; Trina Solar; specific Vertex N datasheet PDFs requested at RFQ.
Inverters (Sungrow SG125HT / SG250HV)Sungrow Power Supply product pageSungrow string-inverter range; SG125HT C&I 3-phase; manual rev verified at RFQ.
Inverters (Huawei SUN2000-330KTL-H1)Huawei FusionSolar product pageHuawei SUN2000-330KTL-H1; 330 kW 3-phase 1500 V DC 8-MPPT; manual rev verified at RFQ.
Inverters (Growatt MAX series)Growatt New Energy product portalGrowatt; MAX 100–253 KTL3-X HV datasheet PDF requested at RFQ.
Mounting (K2 Systems N-Rack + S-Rack)K2 Systems product pageK2 Systems N-Rack; manual rev verified at RFQ.
IEC 61215-1:2021 ed2 (modules — design qualification)IEC WebstoreIEC 61215-1:2021 (TC 82).
IEC 61215-1-1:2021 (modules — c-Si)IEC WebstoreIEC 61215-1-1:2021 (TC 82).
IEC 62109-1:2010 (PCE safety general)IEC WebstoreIEC 62109-1:2010 (TC 82).
IEC 62109-2:2011 (PCE safety — inverters)IEC WebstoreIEC 62109-2:2011 (TC 82).
IEC 62619:2022 ed2 (stationary Li-cell safety)IEC WebstoreIEC 62619:2022 (TC 21/SC 21A).
UL 61730-1 (PV module safety)UL Standards product pageUL 61730-1 product page.
UL 1973 (stationary battery)UL Standards product pageUL 1973 product page.
IEC 61851-1 (EV conductive charging, Part 1)IEC WebstoreIEC 61851-1:2017 product page.
EU Battery Regulation 2023/1542EUR-LexRegulation (EU) 2023/1542.
HS code base (EU CN 2024)Combined Nomenclature, EU OJ L 2023/2860Codes listed in §13 table; confirm via TARIC link in §13.
UN 38.3 (lithium battery transport)UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7)UNECE Manual of Tests and Criteria.
Incoterms (delivery terms in RFQ)ICC Incoterms 2020ICC Incoterms 2020.
Customs lookups (non-EU buyers)USITC / UK Global Tariff / Japan Customs / ABF / SARS / GRA / URAUSITC HTS; UK Global Tariff; Japan Customs; ABF; SARS; GRA; URA.
RFQ submissionTradVolt sitetradvolt.com /rfq/ (canonical site path, live server-rendered form).