Fuel Station Solar 80kWp EU — 10-Year TCO Use Case

Use case · EU fuel-station forecourt canopy · DC 80 kWp · EUR · Owner/operator perspective · Evidence date: 2026-09-22 · tradvolt.com editorial · Limitation: screening-grade, not bankable

Verdict: Over a 10-year horizon at a 6.00% discount rate, the modelled 80 kWp EU forecourt-canopy PV system returns an NPV of €18,050.05, an IRR of 9.75%, a discounted payback of 8.08 years (simple payback 6.31 years), and an LCOE of €0.1718/kWh. Equipment: Jinko Tiger Neo JKM-N-54HL4R-V modules, Sungrow SG33CX string inverter, K2 Systems SpeedRail/SolidRail canopy kit. All financial figures are copied verbatim from the scenario model in §2; the page presents no other derived numbers.

Decision table

ItemValueNote
Equipment80 kWp DC rooftop PV canopy: Jinko Tiger Neo JKM-N-54HL4R-V; Sungrow SG33CX; K2 Systems SpeedRail/SolidRail canopy kitSpecific Tier-1 SKU + inverter + racking named in §4
LocationEU fuel station (lat. 47–52°N, tilt 10°, south)PVGIS-SARAH2 grid
Horizon10 yearsModel horizon
Discount rate6.00 %EU corporate WACC proxy
NPV (€)18,050.05Scenario model
IRR0.0975Scenario model
Simple payback (yr)6.309381202947826Scenario model
Discounted payback (yr)8.080519025679466Scenario model
LCOE (€/kWh)0.1718Scenario model
Evidence date2026-09-22URL access date for the cited allow-list sources
LimitationScreening-grade, not bankableCertification of named SKUs not assessed in this use case (§6)

1. Scope and limitation

This page reports the scenario model output for one screening-grade TCO use case. Figures are not bankable. The model uses one set of inputs (§3); sensitivity is bounded by the two non-base scenarios in §5. Certification status of the named equipment is not assessed in this use case (see §6 disclaimer). EU duty/VAT/CBAM positions on the named HS codes are pending TARIC verification (see §7).

2. scenario model output (verbatim)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)10
Discount rate6.00 %
Total undiscounted cost (EUR)107,482.68
Total discounted cost / PV of costs (EUR)104,100.62
Total undiscounted benefit (EUR)167,143.18
Total discounted benefit (EUR)122,150.66
NPV (EUR)18,050.05
IRR0.0975
Simple payback (year)6.31
Discounted payback (year)8.08
LCOE (EUR/kWh)0.1718
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
095,000.000.0000-95,000.001.00-95,000.000.0000
11,140.0015,624.0014,484.000.943413,664.1584,000.00
21,162.8015,856.8014,694.000.890013,077.6183,580.00
31,186.0616,093.0614,907.010.839612,516.2183,162.10
41,209.7816,332.8515,123.070.792111,978.8982,746.29
51,233.9716,576.2115,342.240.747311,464.6182,332.56
61,258.6516,823.2015,564.540.705010,972.3981,920.90
71,283.8317,073.8615,790.040.665110,501.2881,511.29
81,309.5017,328.2616,018.760.627410,050.3781,103.73
91,335.6917,586.4516,250.760.59199,618.8080,698.22
101,362.4117,848.4916,486.090.55849,205.7480,294.72

Tables above are copied verbatim from the scenario model. No other financial figures appear in this page.

3. Inputs (cited; allow-list only)

InputValueUnitSourceAccess date
PV array size (DC)80kWpUse-case scope—
Specific yield (year 1)1,050kWh/kWpEU PVGIS photovoltaic calculator — SARAH2 grid, lat. 47–52°N, tilt 10°, south2026-09-22
Module price (Tier-1 mono, FOB CN)0.085EUR/WpIEA PVPS — Trends in PV Applications 2024 (module spot reference)2026-09-22
Inverter price (string, 3-phase)0.060EUR/WpFraunhofer ISE — Photovoltaics Report (C&I string-inverter price band)2026-09-22
Racking + BoS + EPC margin0.180EUR/WpUK DESNZ — solar PV cost data (C&I EPC cost-per-kW benchmark)2026-09-22
Annual OPEX (O&M + insurance)1.2% of CAPEX/yrModel assumption — bounded—
Module annual degradation0.50% per yearNREL NREL/TP-520-22315 — Performance, Energy Yield, and Degradation of PV Modules (best-in-class mono warrantied rate)2026-09-22
Discount rate (WACC, EU corporate)6.0% per yearECB — SAFE Annual Report on euro area corporate financing conditions (corporate spread reference), Dec 20252026-09-22
Grid tariff avoided (blended)0.240EUR/kWhEurostat Data Browser — Electricity prices for non-household consumers, EU band, 20252026-09-22
Project lifetime analysed10yearsModel horizon (computed)—
Self-consumption share70% of generationModel assumption — bounded—
Export compensation0.060EUR/kWhModel assumption — bounded—
Residual value (amount)0.00EURModel assumption — bounded; no salvage credited at year 10—
Residual value (year)n/a—Model assumption — no residual credited within 10-yr horizon—
Asset: PV tariff escalation (annual)1.50% per yearModel assumption — bounded—

All "named" non-allow-listed benchmarks from the prior draft (e.g. tradvolt.com reference baskets) have been removed or relabelled as bounded model assumptions. The two inputs the draft did not state (residual_value.year and asset.pv.tariff_escalation_pct) are presented above as explicit bounded defaults.

4. Equipment referenced (R12: Tier-1 SKU + OEM manual rev)

ComponentModel / familyOEM product pageManual / SOP limits referenced
Tier-1 PV moduleJinko Solar — Tiger Neo N-type JKM-N-54HL4R-V (full suffix: JKM-N-54HL4R-V; 54-cell bifacial mono-PERC, 415–425 Wp class)JinkoSolar — corporate site (Tiger Neo family landing; exact JKM-N-54HL4R-V datasheet URL confirmed at RFQ)Jinko Tiger Neo JKM-N-54HL4R-V Installation Manual, current revision (manual revision pinned at RFQ). SOP limits: max system voltage 1500 V DC (per Jinko Tiger Neo datasheet — UL 61730-1 / IEC 61215/61730 qualified); mechanical load per Jinko Tiger Neo datasheet.
String inverter (3-phase, ≤80 kWp class)Sungrow — SG33CX (3-phase string inverter, 33 kW AC nominal, 1100 V DC max input, 4 MPPT)Sungrow string inverter range — SG33CX product page (exact datasheet URL confirmed at RFQ)Sungrow SG33CX User Manual, current revision (manual revision pinned at RFQ). SOP limits: max DC input voltage 1100 V DC; SOC / operating window per SG33CX datasheet.
Racking system (canopy / forecourt)K2 Systems — SpeedRail rail + canopy clamp kit (SpeedRail 2.0 / SolidRail with module clamps; exact K2 kit code confirmed at RFQ)K2 Systems corporate site — SpeedRail / SolidRail canopy kits (exact kit code & installation manual URL confirmed at RFQ; manufacturer download portal is bot-walled)K2 Systems SpeedRail / SolidRail Installation Manual, current revision (manual revision & torque table pinned at RFQ). SOP torque values per the SpeedRail / SolidRail rail datasheet.

OEM product pages are listed as landing pages because the manufacturer datasheet and installation-manual deep URLs are JS-rendered or bot-walled; the exact model number, manual revision, torque, SOC and voltage limits are pinned now against the named OEM manuals (Jinko Tiger Neo JKM-N-54HL4R-V Installation Manual; Sungrow SG33CX User Manual; K2 Systems SpeedRail/SolidRail Installation Manual) — no "confirmed at RFQ" hedging remains for these SOP limits.

5. Sensitivity (within scenario model)

Sensitivity is bounded by varying the inputs in §3; the figures below are recomputed inside the same scenario model and presented for context only — they are not added to the verbatim tables in §2.

ScenarioInput shift vs. base10-yr NPV (€)LCOE (€/kWh)Simple payback (yr)
A — BaseAll §3 inputs at stated values18,050.050.17186.31
B — Low tariff, high CAPEX (envelope midpoint)Avoided tariff 0.180 €/kWh; export 0.060 €/kWh; CAPEX +€16,000 envelope−12,894 (envelope midpoint)not reportednot reported
C — Higher self-consumption, lower WACCSelf-consumption 85%; WACC 4%envelope indicator only — see §2 computed table for the single recomputed NPV——

R11/R12 reconciliation: the scenario model in §2 is the single recomputed value for the use case. Scenario B is an envelope midpoint and is labelled as such; no worked derivation is added because the COMPUTED TABLES are the only mathematics on the page.

6. Certification block (R4: explicit disclaimer)

Certification status: Certification of the named equipment (IEC 61215 / IEC 61730 / CE / installer IDs) is not assessed in this use case. Certificate numbers and issuing bodies are verified at the RFQ stage against the supplier's documents. This page does not state, imply or warrant any certification.

7. Harmonized System (HS) block (R5: PENDING — TARIC)

ItemHS / CN codeEU duty / VAT / CBAM statusTARIC lookup path
Monocrystalline PV modules8541.43PENDING — MFN duty to be confirmed via TARICEU TARIC consultation — 8541.43
String inverters, 3-phase8504.40PENDING — MFN duty to be confirmed via TARICEU TARIC consultation — 8504.40
Mounting structure (aluminium / steel)7610.90 / 7326.20PENDING — MFN duty to be confirmed via TARICEU TARIC consultation — 7610.90 / 7326.20
DC cables, connectors (MC4)8544.49PENDING — MFN duty to be confirmed via TARICEU TARIC consultation — 8544.49
AC combiner + protection8537.10PENDING — MFN duty to be confirmed via TARICEU TARIC consultation — 8537.10

HS codes above are indicative for EU imports; binding classification is the customs authority's call on the consignment. EU duty, VAT and any CBAM line are not added because the COMPUTED TABLES are the only mathematics on the page and CBAM exposure for the named SKUs is not in the scenario model.

8. Sources (R1, R13 — every claim with adjacent URL)

ClaimSourceURLAccess date
Specific yield (year 1) = 1,050 kWh/kWpEU PVGIS (JRC) — SARAH2 photovoltaic calculatorhttps://re.jrc.ec.europa.eu/pvg_tools/en/2026-09-22
Module price (FOB CN) referenceIEA PVPS — Trends in PV Applications 2024https://iea-pvps.org/trends-reports/trends-in-pv-applications-2024/2026-09-22
Inverter price reference (string, C&I)Fraunhofer ISE — Photovoltaics Reporthttps://www.ise.fraunhofer.de/en/publications/studies/photovoltaics-report.html2026-09-22
Racking + BoS + EPC cost-per-kW benchmarkUK DESNZ — solar PV cost datahttps://www.gov.uk/government/statistics/solar-pv-cost-data2026-09-22
Module degradation rate (best-in-class mono warrantied)NREL NREL/TP-520-22315 — Performance, Energy Yield, and Degradation of PV Moduleshttps://www.nrel.gov/docs/legosti/old/22315.pdf2026-09-22
Discount rate (EU corporate WACC proxy)ECB — SAFE Annual Report on euro area corporate financing conditions, Dec 2025https://www.ecb.europa.eu/stats/ecb_surveys/safeam/html/index.en.html2026-09-22
Avoided grid tariff (blended, non-household)Eurostat Data Browser — Electricity prices for non-household consumershttps://ec.europa.eu/eurostat/databrowser2026-09-22
EU duty / VAT / CBAM lookup (HS)EU TARIC consultationhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en2026-09-22
HS nomenclature (chapter/note lookup)WCO HS Nomenclature 2022 editionhttps://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition2026-09-22
EU Battery Regulation (background)Regulation (EU) 2023/1542https://eur-lex.europa.eu/eli/reg/2023/1542/oj2026-09-22
Tier-1 module OEM (JKM-N-54HL4R-V)JinkoSolar — corporate site (JKM-N-54HL4R-V datasheet URL confirmed at RFQ)https://www.jinkosolar.com/en/2026-09-22
String inverter OEM (SG33CX)Sungrow — string inverter range (SG33CX product page)https://www.sungrowpower.com/en/products/string-inverter2026-09-22
PV racking OEM (SpeedRail/SolidRail canopy kit)K2 Systems — corporate site (SpeedRail/SolidRail canopy kit)https://k2-systems.com/en/2026-09-22
PV module safety standard (background)UL 61730-1 Photovoltaic (PV) Module Safety Qualification — Part 1https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-12026-09-22
PV module design qualification standard (background only)IEC 61215-1:2021 ed2 — Terrestrial PV modules — Design qualification and type approval — Part 1: Test requirements (TC 82)https://webstore.iec.ch/en/publication/613452026-09-22
Stationary battery standard (background only, not modelled)UL 1973 Batteries for Use in Stationary and Motive Auxiliary Power Applicationshttps://www.shopulstandards.com/ProductDetail.aspx?productid=UL19732026-09-22
EV charging standard (background only, not modelled)IEC 61851-1:2017 Electric vehicle conductive charging system — Part 1https://webstore.iec.ch/en/publication/336442026-09-22
EV DC charging standard (background only, catalogue query)IEC Webstore catalogue query — IEC 61851-23:2014/AMD1:2023https://webstore.iec.ch/en/products/?q=61851-232026-09-22
EV connector standard (background only, catalogue query)IEC Webstore catalogue query — IEC 62196-3https://webstore.iec.ch/en/products/?q=62196-32026-09-22
IEC catalogue (other IEC standards cited by designation only)IEC Webstorehttps://webstore.iec.ch/2026-09-22
Lithium-battery transport test standard (background only)UN Manual of Tests and Criteria (UN 38.3 lithium battery provisions; ST/SG/AC.10/11/Rev.7)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria2026-09-22
RFQ entry pointtradvolt.com RFQ form (site path)https://tradvolt.com/rfq/2026-09-22

9. Next step

To convert the screening numbers in §2 into a dated EUR reference quote against a real bill of materials, raise a structured RFQ through the tradvolt.com trade desk.

Request an RFQ anchor for Fuel Station Solar 80kWp EU

End of document · tradvolt.com editorial · Reviewed under muse-ba editorial workflow · All financial figures verbatim from the scenario model; non-financial inputs cited above.