Greenhouse + 1 MWp Solar PV: Use-Case & Total Cost of Ownership (South Africa)
Verdict (first 100 words): A 1 MWp grid-tied solar PV array, modelled as LONGi Hi-MO 6 Explorer LR5-54HTH modules with a Sungrow SG125HV string inverter, co-located with a South African greenhouse, returns NPV = ZAR 17,969,658 at a 12.00% discount rate over a 25-year horizon, with IRR = 28.97%, simple payback = 3.97 years, discounted payback = 5.48 years, and LCOE = ZAR 1.01/kWh. Equipment: LONGi Hi-MO 6 LR5-54HTH (LR5-54HTH 515–545 W class HPBC cells) + Sungrow SG125HV three-phase string inverter. Location: South Africa. Horizon: 25 years. Evidence date: 2025-01-15. Limitation: every financial figure below is taken verbatim from the COMPUTED TABLES (computed); equipment performance parameters are model assumptions pending RFQ confirmation.
| Metric | Value |
|---|---|
| Equipment (DC) | LONGi Hi-MO 6 Explorer LR5-54HTH (HPBC cell, mono-Si; product page longi.com/.../hi-mo-x6) |
| Inverter (AC) | Sungrow SG125HV three-phase string inverter (C&I string range, product page sungrowpower.com/.../string-inverter) |
| Location | South Africa (Highveld / Limpopo / Western Cape) |
| Horizon | 25 years |
| Discount rate (WACC) | 12.00% |
| NPV (ZAR) | 17,969,658 |
| IRR | 28.97% |
| Simple payback (years) | 3.97 |
| Discounted payback (years) | 5.48 |
| LCOE (ZAR/kWh) | 1.01 |
| Evidence date | 2025-01-15 |
| Limitation | No certificate issued for the modelled project; model assumes compliant Tier-1 components |
1. Use-Case Description
The scenario models a 1 MWp DC ground-mount PV system co-located with a commercial greenhouse in South Africa. The DC side is built from LONGi Hi-MO 6 Explorer LR5-54HTH mono-Si modules (HPBC cell technology, HPBC+ efficiency up to 25.8% per the Hi-MO X6 product page: https://www.longi.com/en/products/modules-series/hi-mo-x6/; module wattage and warranty revision confirmed at RFQ). The AC side uses a Sungrow SG125HV three-phase string inverter from the Sungrow C&I string-inverter range (https://www.sungrowpower.com/en/products/string-inverter; the SG125HV is the 125 kW utility/C&I model listed on this page; exact datasheet revision confirmed at RFQ). The greenhouse load is daytime-aligned (drip fertigation pumps, horizontal airflow fans, LED supplemental lighting, pad-and-fan evaporative cooling, screen motors), giving a high self-consumption ratio.
2. Inputs Table (Cited) & Model Assumptions
Financial figures in the TCO tables below are taken verbatim from the COMPUTED TABLES supplied by TradVolt's scenario model. The numeric inputs driving them are stated here; rows that are not directly published as a single document are flagged as model assumption.
| Input | Value | Unit | Source / Citation (specific document URL) |
|---|---|---|---|
| PV system size | 1,000 | kWp DC | System definition (TradVolt use-case brief) |
| Module family | LONGi Hi-MO 6 Explorer LR5-54HTH (HPBC cell) | mono-Si | https://www.longi.com/en/products/modules-series/hi-mo-x6/ (HPBC cell, Explorer variant; HPBC+ efficiency up to 25.8%; exact wattage class and warranty revision confirmed at RFQ) |
| Inverter model | Sungrow SG125HV (three-phase string) | 125 kW C&I | https://www.sungrowpower.com/en/products/string-inverter (SG125HV listed on this C&I string-inverter page; exact datasheet revision confirmed at RFQ) |
| Specific yield (Highveld baseline) | 1,650 | kWh/kWp/yr | EC JRC PVGIS about/method page and SAUER CVYield methodology: https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en; ZA Highveld zone treated as bounded model assumption |
| Performance ratio | 0.80 | ratio | Model assumption (bounded 0.78–0.82 for well-maintained Tier-1 utility-scale ZA PV); methodology reference: IEC 61724-1:2017 PV system performance, Part 1 (TC 82). IEC Webstore catalogue: https://webstore.iec.ch/ — cite designation «IEC 61724-1:2017» in any RFQ response |
| Module degradation | 0.50% | per year (linear) | Model assumption (bounded by LONGi Hi-MO 6 product page; linear performance warranty text confirmed at RFQ) |
| CapEx — modules | 4,500,000 | ZAR | Model assumption (no allow-listed public ZA large C&I module-price document exists; confirmed at RFQ) |
| CapEx — inverter | included in modules line | ZAR | Model assumption |
| CapEx — BoS + mounting | 2,200,000 | ZAR | Model assumption (K2 Systems N-Rack ground-mount + S-Rack rail family referenced: https://k2-systems.com/en/product-solutions/k2-n-rack-system/; exact rail/kit model + manual revision confirmed at RFQ) |
| CapEx — EPC + commissioning | 1,800,000 | ZAR | Model assumption (EPC scope per NRS 097-2-1:2017, ed. 2; SABS Webstore catalogue page; exact standard number cited in text) |
| CapEx — grid-tie + protection | 900,000 | ZAR | Model assumption (NRS 097-2-1:2017 referenced; the technical basis is cited through the SABS Webstore catalogue — confirm at RFQ) |
| Total CapEx | 9,400,000 | ZAR | Sum of above (matches Year 0 outflow) |
| Fixed O&M (year 1) | 200,000 | ZAR/yr | Model assumption (year-1 figure is the model input; O&M escalates at 8.0%/yr in the COMPUTED TABLES) |
| O&M escalation | 8.0% | per year | Model assumption (bounded by long-run ZA CPI) |
| Inverter replacement (year 12) | 750,000 | ZAR | Model assumption (Sungrow SG125HV replacement; confirmed at RFQ) |
| Insurance (year 1) | included in fixed O&M | ZAR/yr | Model assumption (insurance is bundled with fixed O&M in the COMPUTED TABLES) |
| Eskom tariff (year 1, base) | 1.50 | ZAR/kWh | https://www.nersa.org.za/electricity/pricing-and-tariffs/ (NERSA Eskom approved-tariff schedule; exact PDF confirmed at RFQ) |
| Eskom tariff escalation | 7.0% | per year | Model assumption (bounded by NERSA MYPD multi-year approved average); IEA cross-check on ZA electricity market: https://www.iea.org/ |
| Discount rate (WACC) | 12.00% | per year | Model assumption (typical ZA C&I project finance rate) |
| Project horizon | 25 | years | Module performance warranty term (LONGi Hi-MO 6 product page) |
| Greenhouse annual load (self-consumed) | 500,000 | kWh/yr | Model assumption (3 ha greenhouse benchmark) |
| Self-consumption ratio | 0.95 | ratio | Model assumption (daytime-aligned load) |
| Decommissioning reserve (year 25) | 350,000 | ZAR | Model assumption (end-of-life decommissioning) |
| Residual value (asset end-of-horizon) | bounded model default | ZAR | Model assumption (bounded default): end-of-horizon residual value set to ZAR 0 (asset is fully depreciated over the 25-year horizon in the COMPUTED TABLES; no residual line is added to the benefit stream) |
| Export tariff (residual kWh) | bounded model default | ZAR/kWh | Model assumption (bounded default): surplus kWh beyond the self-consumed load are valued at the Eskom Megaflex avoided-cost rate referenced on the NERSA pricing page; the COMPUTED TABLES treat export revenue as part of the benefit stream that escalates with the Eskom tariff, so the exact export rate is implicit in the benefit column |
3. TCO Summary (COMPUTED — computed)
| Metric | Value |
|---|---|
| Currency | ZAR |
| Horizon (years) | 25 |
| Discount rate | 12.00 % |
| Total undiscounted cost (ZAR) | 25,121,187.99 |
| Total discounted cost / PV of costs (ZAR) | 12,598,844.70 |
| Total undiscounted benefit (ZAR) | 138,014,079.52 |
| Total discounted benefit (ZAR) | 30,568,502.56 |
| NPV (ZAR) | 17,969,657.87 |
| IRR | 0.2897 |
| Simple payback (year) | 3.97 |
| Discounted payback (year) | 5.48 |
| LCOE (ZAR/kWh) | 1.01 |
4. Year-by-Year Cash Flow (COMPUTED — computed)
| Year | Cost (ZAR) | Benefit (ZAR) | Net (ZAR) | Discount factor | Discounted net (ZAR) | Energy (kWh) |
|---|---|---|---|---|---|---|
| 0 | 9,400,000.00 | 0.0000 | -9,400,000.00 | 1.00 | -9,400,000.00 | 0.0000 |
| 1 | 200,000.00 | 2,355,375.00 | 2,155,375.00 | 0.8929 | 1,924,441.96 | 1,650,000.00 |
| 2 | 216,000.00 | 2,507,649.99 | 2,291,649.99 | 0.7972 | 1,826,889.34 | 1,641,750.00 |
| 3 | 233,280.00 | 2,669,769.57 | 2,436,489.57 | 0.7118 | 1,734,245.15 | 1,633,541.25 |
| 4 | 251,942.40 | 2,842,370.17 | 2,590,427.77 | 0.6355 | 1,646,263.68 | 1,625,373.54 |
| 5 | 272,097.79 | 3,026,129.40 | 2,754,031.61 | 0.5674 | 1,562,711.50 | 1,617,246.68 |
| 6 | 293,865.62 | 3,221,768.67 | 2,927,903.05 | 0.5066 | 1,483,366.80 | 1,609,160.44 |
| 7 | 317,374.86 | 3,430,056.01 | 3,112,681.14 | 0.4523 | 1,408,018.87 | 1,601,114.64 |
| 8 | 342,764.85 | 3,651,809.13 | 3,309,044.28 | 0.4039 | 1,336,467.48 | 1,593,109.07 |
| 9 | 370,186.04 | 3,887,898.59 | 3,517,712.55 | 0.3606 | 1,268,522.41 | 1,585,143.52 |
| 10 | 399,800.93 | 4,139,251.23 | 3,739,450.31 | 0.3220 | 1,204,002.92 | 1,577,217.80 |
| 11 | 431,785.00 | 4,406,853.83 | 3,975,068.83 | 0.2875 | 1,142,737.30 | 1,569,331.72 |
| 12 | 1,216,327.80 | 4,691,756.93 | 3,475,429.13 | 0.2567 | 892,056.09 | 1,561,485.06 |
| 13 | 503,634.02 | 4,995,079.01 | 4,491,444.99 | 0.2292 | 1,029,323.27 | 1,553,677.63 |
| 14 | 543,924.75 | 5,318,010.87 | 4,774,086.13 | 0.2046 | 976,872.61 | 1,545,909.24 |
| 15 | 587,438.72 | 5,661,820.27 | 5,074,381.55 | 0.1827 | 927,070.54 | 1,538,179.70 |
| 16 | 634,433.82 | 6,027,856.95 | 5,393,423.13 | 0.1631 | 879,784.14 | 1,530,488.80 |
| 17 | 685,188.53 | 6,417,557.91 | 5,732,369.38 | 0.1456 | 834,887.16 | 1,522,836.35 |
| 18 | 740,003.61 | 6,832,453.02 | 6,092,449.41 | 0.1300 | 792,259.62 | 1,515,222.17 |
| 19 | 799,203.90 | 7,274,171.11 | 6,474,967.21 | 0.1161 | 751,787.57 | 1,507,646.06 |
| 20 | 863,140.21 | 7,744,446.28 | 6,881,306.06 | 0.1037 | 713,362.74 | 1,500,107.83 |
| 21 | 932,191.43 | 8,245,124.73 | 7,312,933.30 | 0.0926 | 676,882.27 | 1,492,607.29 |
| 22 | 1,006,766.74 | 8,778,172.04 | 7,771,405.30 | 0.0826 | 642,248.44 | 1,485,144.26 |
| 23 | 1,087,308.08 | 9,345,680.86 | 8,258,372.78 | 0.0738 | 609,368.45 | 1,477,718.53 |
| 24 | 1,174,292.73 | 9,949,879.13 | 8,775,586.40 | 0.0659 | 578,154.09 | 1,470,329.94 |
| 25 | 1,618,236.15 | 10,593,138.82 | 8,974,902.67 | 0.0588 | 527,933.45 | 1,462,978.29 |
Notes on the COMPUTED TABLES: Year 0 is the CapEx outflow. The Year 12 cost line of ZAR 1,216,327.80 combines the Sungrow SG125HV inverter replacement (ZAR 750,000) with that year's escalated fixed O&M. The Year 25 cost line includes the ZAR 350,000 decommissioning reserve on top of the final-year O&M. All discount factors in the cash-flow table are at the 12.00% base WACC.
5. Sensitivity Table
Each row holds the time basis (25-year horizon, year-by-year cash-flow basis) constant and varies a single input. CapEx- and yield-adjusted rows reuse the same O&M, inverter-replacement, and decommissioning lines as the base case; only CapEx and/or annual generation scale linearly. The LCOE, NPV, IRR, payback, and discount factor figures quoted below are illustrative scenario ratings for the decision table; the only computed TCO figures are those in the COMPUTED TABLES above.
| Scenario | CapEx (ZAR) | Yield (kWh/kWp/yr) | WACC | LCOE (ZAR/kWh) | Discounted payback (yrs) | Verdict |
|---|---|---|---|---|---|---|
| Base case | 9,400,000 | 1,650 | 12.00% | 1.01 | 5.48 | GO — viable; NPV = ZAR 17.97M, IRR = 28.97% |
| Low tariff escalation (5.0%) | 9,400,000 | 1,650 | 12.00% | 1.01 (cost unchanged) | lengthens | CAUTION — cost LCOE unchanged; benefit stream compresses |
| High tariff escalation (12.0%) | 9,400,000 | 1,650 | 12.00% | 1.01 (cost unchanged) | shortens | GO — strongly favourable upside |
| Low specific yield (coastal cloud belt) | 9,400,000 | 1,400 | 12.00% | rises vs. base | lengthens vs. base | CAUTION — thin margin; verify on-site yield via PVGIS methodology: https://joint-research-centre.ec.europa.eu/photovoltaic-geographical-information-system-pvgis_en |
| CapEx +20% | 11,280,000 | 1,650 | 12.00% | rises vs. base | lengthens vs. base | CAUTION — borderline vs. tariff; secure fixed-price EPC |
| CapEx −10% | 8,460,000 | 1,650 | 12.00% | falls vs. base | shortens vs. base | GO — highly competitive |
| Low yield + high CapEx (worst) | 11,280,000 | 1,400 | 12.00% | rises materially | lengthens materially | NO-GO without subsidy |
| High yield + low CapEx (best) | 8,460,000 | 1,800 | 12.00% | falls materially | shortens materially | GO — excellent |
| WACC 16% (stressed) | 9,400,000 | 1,650 | 16.00% | rises vs. base | lengthens vs. base | CAUTION — negotiate blended green finance |
6. Verdict by Scenario
- Base case — GO. LCOE = ZAR 1.01/kWh sits well below the ZAR 1.50/kWh Eskom year-1 tariff; discounted payback 5.48 years sits inside the LONGi Hi-MO 6 product warranty window.
- Low tariff escalation (5.0%) — CAUTION. Costs are unchanged, but the benefit stream compresses; equity IRR drops and payback lengthens. Negotiate a tariff-escalation pass-through in the PPA or accept a lower IRR.
- High tariff escalation (12.0%) — strongly GO. Upside case; the project remains comfortably NPV-positive.
- Coastal cloud-belt yield — CAUTION. Knysna / southern Cape yield can drop below 1,500 kWh/kWp/yr; commission a 12-month on-site yield assessment (PVGIS methodology) before commit.
- CapEx +20% — CAUTION. LCOE rises versus base, still below tariff but with a thin margin; secure fixed-price EPC and a 10% contingency.
- Stressed WACC (16%) — CAUTION. LCOE rises versus base; negotiate blended green finance or concessional DFIs to bring WACC back below 12%.
- Worst-case combined — NO-GO without subsidy. Only an Eskom demand-market incentive or the Section 12B Income Tax Act renewable-energy allowance rescues this stack. SARS is the cited reference for Section 12B (see SARS Customs & Excise Tariff landing page: https://www.sars.gov.za/customs-and-excise/tariff/; the Section 12B interpretation note is the relevant SARS publication and exact URL is confirmed at RFQ).
7. Standards & Certification Block
Disclaimer: no certificate has been issued for the modelled project. The model assumes compliant Tier-1 components per the standards listed below; certificate numbers and issuing bodies are confirmed at RFQ award.
| IEC 61215-1:2021 / IEC 61215-1-1:2021 / IEC 61215-2:2021 (ed. 2) | Crystalline-silicon PV module design qualification — LONGi Hi-MO 6 Explorer LR5-54HTH assumed compliant. Reference (IEC 61215-1-1:2021 c-Si special requirements, TC 82): https://webstore.iec.ch/en/publication/61346; full family IEC 61215-1:2021 / IEC 61215-1-1:2021 / IEC 61215-2:2021 cited by designation. IEC Webstore catalogue: https://webstore.iec.ch/ |
| IEC 61730-1:2016 / IEC 61730-2:2016 (ed. 2) | PV module safety qualification — LONGi Hi-MO 6 Explorer LR5-54HTH assumed compliant. Reference: IEC Webstore catalogue https://webstore.iec.ch/ (cite designation IEC 61730-1:2016 / IEC 61730-2:2016 in any RFQ response); UL counterpart UL 61730-1: https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1 |
| IEC 62109-1:2010 (ed. 1) | Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82). Reference: https://webstore.iec.ch/en/publication/6470. Sungrow SG125HV assumed compliant. |
| IEC 62109-2:2011 (ed. 1) | Safety of power converters for use in PV power systems, Part 2: Particular requirements for inverters; used jointly with IEC 62109-1. Reference: https://webstore.iec.ch/en/publication/6471. Sungrow SG125HV assumed compliant. |
| NRS 097-2-1:2017 (ed. 2) | ZA grid-tie compliance for small/medium generators — assumed compliant; certificate issued at grid-tie commissioning. |
| SANS 10142-1:2017 (ed. 3.1) | Wiring of premises — assumed compliant; CoC issued at commissioning. |
| SAPVIA PV GreenCard | Installer certification programme — installer-level, not project-level; certificate issued to the EPC. |
8. HS Code Block — Duty Lookup
Duty rates below are lookup placeholders only. The computed rates are obtained by querying the official tariff pages cited for each row.
| HS code (2022) | Description | Duty rate | Lookup |
|---|---|---|---|
| 8541.43 | Photovoltaic cells assembled in modules | Lookup | SARS Customs & Excise Tariff landing page: https://www.sars.gov.za/customs-and-excise/tariff/ — Schedule 1, Part 1, Chapter 85 |
| 8504.40 | Static converters (inverters) | Lookup | SARS Customs & Excise Tariff landing page: https://www.sars.gov.za/customs-and-excise/tariff/ — Schedule 1, Part 1, Chapter 85 |
| 7610.90 | Aluminium mounting structures | Lookup | SARS Customs & Excise Tariff landing page: https://www.sars.gov.za/customs-and-excise/tariff/ — Schedule 1, Part 1, Chapter 76 |
| 8544.49 | DC cables, other conductors | Lookup | SARS Customs & Excise Tariff landing page: https://www.sars.gov.za/customs-and-excise/tariff/ — Schedule 1, Part 1, Chapter 85 |
Duty rate disclaimer: TradVolt does not assert any specific rate as fact. SARS publishes the official South African Customs and Excise Tariff at https://www.sars.gov.za/customs-and-excise/tariff/; consult a licensed clearing agent or SARS customs ruling before any import decision. Possible ITAC import-control measures or Section 12B Income Tax Act renewable-energy allowance apply but require independent verification against the ITAC import-control page: https://www.itac.org.za/import-control/.
9. Cross-Border Reference (Incidental)
If the equipment is sourced via a non-ZA port of entry, the EU TARIC consultation tool (https://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=en), USITC HTS (https://hts.usitc.gov/), UK Global Tariff (https://www.trade-tariff.service.gov.uk/), and ICC Incoterms 2020 (https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/) are the cited cross-border lookups. Wood packaging must comply with IPPC ISPM 15 (https://www.ippc.int/en/core-activities/standards-setting/ispms/). Lithium-bearing components fall under UN Manual of Tests and Criteria, UN 38.3 (ST/SG/AC.10/11/Rev.7) — reference: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria (cite designation «ST/SG/AC.10/11/Rev.7» verbatim).
10. Call to Action
Request a ZA-specific EPC and financing quote bundle for a 1 MWp greenhouse-coupled solar PV system (LONGi Hi-MO 6 Explorer LR5-54HTH + Sungrow SG125HV):
Submit a 1 MWp Greenhouse Solar PV RFQ (South Africa) — tradvolt.com/rfq/