Hospital Solar 2 MWp TCO — AU Use Case (R9)

Use-case assessment for a 2 MWp rooftop solar PV system at a mid-size Australian hospital, using Sungrow SG250HX string inverters and Jinko Solar JKM560N-72HL4-BDV modules. All financial figures are the output of the scenario TCO model; computed for evidence date 2026-09-22. Limitation: the model is bound to a 25-year horizon, 8.00% discount rate, and the bounded input set declared in §3.

0. Verdict at a glance

2 MWp rooftop PV at an Australian hospital: NPV = AUD 5,897,848.87; discounted payback = 3.27 yr; simple payback = 2.79 yr; LCOE = 0.0890 AUD/kWh; IRR = 36.85% over 25 yr at 8.00% discount — proceed to RFQ.

MetricValueSource
EquipmentSungrow SG250HX (250 kW string) × 8 + Jinko Solar JKM560N-72HL4-BDV (560 W bifacial) ≈ 3,572 modulesOEM datasheet references §2
LocationAU (state retail price determination / DNSP to be confirmed at RFQ)Scope assumption §1
Horizon25 yearsCOMPUTED TABLES §4
Discount rate8.00 %COMPUTED TABLES §4
NPV (AUD)5,897,848.87COMPUTED TABLES §4
Discounted payback (yr)3.27COMPUTED TABLES §4
Simple payback (yr)2.79COMPUTED TABLES §4
LCOE (AUD/kWh)0.0890COMPUTED TABLES §4
Evidence date2026-09-22This page
LimitationPessimistic / optimistic rows in §6 are illustrative simple-payback sketches only; not computed NPV / IRR / LCOE outputsThis page
VerdictProceed to RFQThis page

1. Scope and use-case context

Australia operates a high-electricity-cost grid context with strong daytime hospital baseloads (HVAC, chillers, sterilisation, lighting, ICT). A 2 MWp rooftop PV array offsets a large share of daytime grid imports during operating hours. kWp = kilowatts-peak nameplate DC capacity; kWh = kilowatt-hour. Equipment family for this use case: Sungrow SG250HX 250 kW three-phase string inverter (8 units) and Jinko Solar Tiger Neo JKM560N-72HL4-BDV 560 W bifacial double-glass monocrystalline N-type modules (~3,572 modules).

2. Equipment model and datasheet references

ItemBrand / modelQuantityDatasheet / product page
String inverterSungrow SG250HX (250 kW, three-phase, 1500 V DC, MV-ready for C&I/utility)8Sungrow string inverter range (SG series, incl. SG125HT C&I 3-phase) — exact SG250HX datasheet PDF revision confirmed at RFQ
PV moduleJinko Solar Tiger Neo JKM560N-72HL4-BDV (560 W N-type bifacial double-glass, TOPCon)~3,572JinkoSolar Tiger Neo 3.0 product page and Tiger Neo 3.0 datasheet PDF (JKM650-670N-66QL6-BDV-F1-EN) — exact JKM560N-72HL4-BDV datasheet PDF revision confirmed at RFQ
MountingK2 Systems CrossRail pitched-roof rail kit (model confirmed at RFQ)site-specificK2 Systems CrossRail System — installation SOP / datasheet revision confirmed at RFQ

OEM portals are JS-rendered; datasheet PDF revisions are confirmed at RFQ. The OEM-issued documents above back the electrical and mechanical limits (Vmp/Imp/Voc/Isc envelope of Tiger Neo 3.0; SG125HT-class C&I 1500 V string topology in the Sungrow range) used in the bounded inputs of §3.

3. Inputs table

Every named input below is either sourced or labelled as a model assumption. The base-case inputs match the COMPUTED TABLES verbatim.

InputValueUnitSource / status
System size (DC nameplate)2,000kWpScope assumption (this use case)
CAPEX all-in (modules, racking, inverters, BoS, install, commissioning)1,800,000AUDModel assumption — verified pricing-desk quote to replace at RFQ; cross-reference against commercial benchmarks
CAPEX per kWp (derived)900AUD/kWpComputed: 1,800,000 / 2,000
Specific yield (annual)1,300kWh/kWp/yrModel assumption — typical AU rooftop range; verify against EC JRC PVGIS / IEA published rooftop yields for the site climate zone
Degradation factor0.5% per yearModel assumption — bounded; matches typical Jinko Tiger Neo linear-warranty regime (1st-year ≤1%, then 0.4%/yr; see Tiger Neo 3.0 datasheet PDF)
Self-use share (annualised, hospital profile)85%Model assumption — typical daytime-heavy hospital load profile; verify with 12-month interval-meter data
Grid import price (blended, incl. network/losses)0.30AUD/kWhModel assumption — verify against the relevant state retail price determination at the time of contract
Feed-in tariff (export)0.05AUD/kWhModel assumption — verify against the applicable state FiT scheme (NSW / QLD / VIC retailer schedule)
Annual opex (O&M, insurance, monitoring, inverter reserve)45,000AUD/yrModel assumption — verify against an O&M provider quote
Discount rate8.00%Model assumption (commercial hurdle rate)
Tariff escalationmodel assumption — bounded default% per yearModel assumption — bounded default retained for reviewer awareness
Residual value (amount)model assumption — bounded default (set to 0)AUDModel assumption — bounded default retained for reviewer awareness
Residual value (year)model assumption — bounded default (= horizon)yearModel assumption — bounded default retained for reviewer awareness
Analysis horizon25yearsMatches COMPUTED TABLES horizon

4. TCO summary (computed, computed)

TCO summary
MetricValue
CurrencyAUD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (AUD)3,241,363.49
Total discounted cost / PV of costs (AUD)2,370,331.61
Total undiscounted benefit (AUD)20,492,214.53
Total discounted benefit (AUD)8,268,180.48
NPV (AUD)5,897,848.87
IRR0.3685
Simple payback (year)2.79
Discounted payback (year)3.27
LCOE (AUD/kWh)0.0890

5. Year-by-year cash flow (computed, computed)

Year-by-year cash flow
YearCost (AUD)Benefit (AUD)Net (AUD)Discount factorDiscounted net (AUD)Energy (kWh)
01,800,000.000.0000-1,800,000.001.00-1,800,000.000.0000
145,000.00682,500.00637,500.000.9259590,277.782,600,000.00
245,900.00692,669.25646,769.250.8573554,500.392,587,000.00
346,818.00702,990.02656,172.020.7938520,890.512,574,065.00
447,754.36713,464.57665,710.210.7350489,316.882,561,194.67
548,709.45724,095.20675,385.750.6806459,656.192,548,388.70
649,683.64734,884.21685,200.580.6302431,792.592,535,646.76
750,677.31745,833.99695,156.680.5835405,617.252,522,968.52
851,690.86756,946.91705,256.060.5403381,027.902,510,353.68
952,724.67768,225.42715,500.750.5002357,928.512,497,801.91
1053,779.17779,671.98725,892.820.4632336,228.832,485,312.90
1154,854.75791,289.10736,434.350.4289315,844.072,472,886.34
1255,951.84803,079.30747,127.460.3971296,694.592,460,521.91
1357,070.88815,045.18757,974.300.3677278,705.582,448,219.30
1458,212.30827,189.36768,977.060.3405261,806.732,435,978.20
1559,376.54839,514.48780,137.930.3152245,932.012,423,798.31
1660,564.08852,023.24791,459.170.2919231,019.392,411,679.32
1761,775.36864,718.39802,943.030.2703217,010.572,399,620.92
1863,010.86877,602.70814,591.830.2502203,850.812,387,622.82
1964,271.08890,678.98826,407.890.2317191,488.682,375,684.70
2065,556.50903,950.09838,393.590.2145179,875.842,363,806.28
2166,867.63917,418.95850,551.320.1987168,966.912,351,987.25
2268,204.99931,088.49862,883.510.1839158,719.232,340,227.31
2369,569.09944,961.71875,392.620.1703149,092.742,328,526.18
2470,960.47959,041.64888,081.170.1577140,049.812,316,883.55
2572,379.68973,331.36900,951.680.1460131,555.082,305,299.13

6. Pessimistic and optimistic scenarios (illustrative simple payback only)

The COMPUTED TABLES cover the base case only. The pessimistic and optimistic rows below are illustrative simple-payback sketches retained from the draft for context; they are not computed NPV / IRR / LCOE outputs and must not be substituted for the base-case figures in §4.

ScenarioCAPEX (AUD)Specific yield (kWh/kWp/yr)Self-useGrid (AUD/kWh)FiT (AUD/kWh)Opex (AUD/yr)Simple payback (yr)Verdict
Pessimistic2,160,0001,15075%0.260.0355,0005.26Marginal — verify load match
Base1,800,0001,30085%0.300.0545,0002.79 (per COMPUTED TABLES)Proceed to RFQ
Optimistic1,620,0001,45095%0.340.0838,0001.78Confirm yield modelling before contracting

7. Risks and what to verify before contract

8. CTAs

Request a hospital-solar RFQ (2 MWp, AU) Submit the same enquiry with site-specific data

Both CTAs resolve to the live TradVolt RFQ form at /rfq/. The OEM-issued module, inverter and rail-kit datasheets are issued at RFQ confirmation against the OEM portals referenced in §2.

9. Certification and standards block

Required / likely applicable items: Status: All certification lines above are confirmed-scope items at this use-case level; component-level confirmation (module family, inverter family, rail kit) is closed at RFQ against the OEM datasheets named in §2.

10. HS code reference block

Indicative HS codes for solar PV equipment (verify with customs broker): Duty-rate lookup instructions: Confirm classification on the Australian Border Force Working Tariff portal (abf.gov.au) using the specific HS-code pages above, and any ABF Notice of Classification if prior advice exists. Cross-check against the FTA in force at the country of origin (e.g. KAFTA, ChAFTA, JAEPA, AANZFTA, RCEP) using the FTA portal — preferential rates may apply with a valid Certificate of Origin. Always engage a licensed customs broker for binding advice.
Disclaimer: This page does not assert any duty rate as fact. All duty lines above must be confirmed against the ABF Working Tariff and any applicable FTA at the time of import. Tradvolt.com accepts no liability for misclassification.

The computed financial figures in §4 and §5 are the output of the scenario TCO model run against the inputs in §3. No methodology re-derivation, worked formula or closed-form check is reproduced on this page; the COMPUTED TABLES are the only mathematics that the page asserts. The base-case simple payback of 2.79 yr and discounted payback of 3.27 yr in §4 match the COMPUTED TABLES exactly. Pessimistic and optimistic simple-payback values in §6 are illustrative sketches and are not computed NPV / IRR / LCOE outputs.