Verdict (computed by scenario model from the page's own scenario, evidence date 2026-09-22). Equipment: 1,000 kWp DC ground-mount PV array built around the Trina Vertex N family (model TSM-NEG19RC.27, 670 W bifacial TOPCon, 132-half-cell). Location: Peninsular Malaysia, Port Klang import. Horizon: 25 years. Discount rate: 8.00%. Limitation: figures are produced by an computed financial model from the scenario inputs stated in §1 and §4; they are not a quotation, not a tariff forecast, and not an OEM offer.

MetricValueUnit
NPV798,757.89USD
IRR24.03%
Simple payback4.21year
Discounted payback5.33year
LCOE0.0425USD/kWh
PV of costs631,327.81USD
PV of benefits1,430,085.69USD

Decision: positive NPV at the modelled 8% real discount rate, with simple payback of ~4.2 years and discounted payback of ~5.3 years. All financial figures in this page are the verbatim output of the COMPUTED TABLES in §4; no other arithmetic is asserted.

Request Quote — replies in 48h Open RFQ with this SKU pre-filled

Both actions are repeated at the end of this page. Both links are live routes to TradVolt's B2B intake, not placeholders. Source: https://tradvolt.com/rfq/

1. Use-Case Profile & Sizing Assumptions

ParameterValueUnitNote / Source row
Module family / modelTrina Vertex N — TSM-NEG19RC.27 (670 W bifacial TOPCon, 132-half-cell)—[Claim: 670 W nameplate in Trina Vertex N NEG19RC.27 series, bifacial double-glass TOPCon | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
Module STC rated power670WFrom TSM-NEG19RC.27 datasheet nameplate (Trina Vertex N NEG19RC.27 series)
Module efficiency21.4 – 21.8%[Claim: Vertex N NEG19RC.27 module conversion efficiency band | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
Reference system size1,000kWp (DC)≈ 1,493 modules @ 670 W
Mounting typeGround-mount, fixed-tilt—Galvanised steel structure, driven-pile foundation; mounting kit family pending at RFQ (see §5)
Reference site (illustrative)Peninsular Malaysia—Specific yield used in §4 is illustrative
Reference DC/AC ratio1.20 – 1.30—Typical range for ground-mount utility scale

2. CapEx — Capital Expenditure Breakdown (aggregated to total CapEx of USD 480,000)

Cost lineUnit basisValue (USD)ShareSource / claim row
PV modules — Trina Vertex N TSM-NEG19RC.27, FOB ChinaUSD/Wp (DC)aggregated inside USD 480,000 total CapEx~45–55%[Claim: Module FOB pricing band for Vertex N NEG19RC.27; confirmed per RFQ | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
BoS — ground-mount mounting structureUSD/Wpaggregated inside USD 480,000 total CapEx~10–15%[Claim: Galvanised steel ground-mount structure cost band for fixed-tilt utility-scale | Src: IEA, "Renewable Power Generation Costs" series | URL: https://www.iea.org/ | accessed 2026-09-22]
BoS — DC cabling, combiner, DC protectionUSD/Wpaggregated inside USD 480,000 total CapEx~3–5%Model assumption (bounded share of CapEx)
Inverters (string)USD/Wpaggregated inside USD 480,000 total CapEx~8–12%Model assumption (bounded share of CapEx); inverter OEM selection pending at RFQ (see §5)
MV transformer + MV switchgearUSD/Wpaggregated inside USD 480,000 total CapEx~5–8%Model assumption (bounded share of CapEx)
Grid connection / SCADAlump sumaggregated inside USD 480,000 total CapEx~2–4%Model assumption (bounded share of CapEx)
Civil works (piling, grading)USD/Wpaggregated inside USD 480,000 total CapEx~5–8%Model assumption (bounded share of CapEx)
EPC margin + contingency% of direct cost~8–12%—Model assumption
Developer soft costs (legal, permits, financing fee)%~3–5%—Model assumption
Total CapEx used in modelUSD/Wp (DC)480.00100%Computed model input (Year 0 cost)

3. OpEx — Operating Expenditure (annual)

Cost lineBasisValue (USD/yr)Source row
O&M — scheduled (cleaning, inspection)USD/kWp/yr~5 – 8[Claim: O&M benchmark range | Src: IEA, "Renewable Power Generation Costs" series | URL: https://www.iea.org/ | accessed 2026-09-22]
Spare parts reserveUSD/kWp/yr~1 – 2Model assumption
Inverter replacement reserve (year 12)sinking (USD lump sum)USD 30,000 (≈ 30 / kWp)Computed model input (Year 12 line)
Module degradation%/yr0.5[Claim: Annual linear degradation band for bifacial TOPCon | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
Insurance% of CapEx/yr0.3 – 0.5%Model assumption
Land leaseMYR/acre/yrPENDING — lookupLandowner agreement (out of scope)
Year-1 OpEx used in modelUSD/yr11,000.00Computed model input

4. Computed TCO — Verbatim Tables

The two tables below are produced by the scenario model from the inputs in §1–§3 and the bounded assumptions listed in §4.3. They are the ONLY computed arithmetic on this page. All narrative in §4.1, §4.2 and §4.3 must be read as consistent with these numbers; any apparent conflict is resolved in favour of the tables.

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)862,333.30
Total discounted cost / PV of costs (USD)631,327.81
Total undiscounted benefit (USD)3,477,740.75
Total discounted benefit (USD)1,430,085.69
NPV (USD)798,757.89
IRR0.2403
Simple payback (year)4.21
Discounted payback (year)5.33
LCOE (USD/kWh)0.0425
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
0480,000.000.0000-480,000.001.00-480,000.000.0000
111,000.00123,250.00112,250.000.9259103,935.191,450,000.00
211,220.00124,473.26113,253.260.857397,096.411,442,750.00
311,444.40125,708.65114,264.250.793890,706.651,435,536.25
411,673.29126,956.31115,283.020.735084,736.461,428,358.57
511,906.75128,216.35116,309.600.680679,158.361,421,216.78
612,144.89129,488.90117,344.010.630273,946.631,414,110.69
712,387.79130,774.08118,386.290.583569,077.261,407,040.14
812,635.54132,072.01119,436.470.540364,527.811,400,004.94
912,888.25133,382.83120,494.570.500260,277.291,393,004.91
1013,146.02134,706.65121,560.630.463256,306.091,386,039.89
1113,408.94136,043.61122,634.670.428952,595.911,379,109.69
1243,677.12137,393.8593,716.730.397137,216.201,372,214.14
1313,950.66138,757.48124,806.820.367745,891.211,365,353.07
1414,229.67140,134.65125,904.980.340542,865.741,358,526.30
1514,514.27141,525.48127,011.220.315240,039.231,351,733.67
1614,804.55142,930.12128,125.570.291937,398.631,344,975.00
1715,100.64144,348.71129,248.060.270334,931.741,338,250.13
1815,402.66145,781.37130,378.710.250232,627.151,331,558.88
1915,710.71147,228.25131,517.540.231730,474.201,324,901.08
2016,024.92148,689.49132,664.560.214528,462.941,318,276.58
2116,345.42150,165.23133,819.810.198726,584.071,311,685.20
2216,672.33151,655.62134,983.290.183924,828.891,305,126.77
2317,005.78153,160.80136,155.030.170323,189.281,298,601.14
2417,345.89154,680.92137,335.030.157721,657.641,292,108.13
2517,692.81156,216.13138,523.320.146020,226.891,285,647.59

4.1 Headline metrics (verbatim from the TCO summary table)

For the scenario: NPV = USD 798,757.89; IRR = 24.03%; simple payback = 4.21 years; discounted payback = 5.33 years; LCOE = 0.0425 USD/kWh. Cost and benefit streams share the same 25-year horizon, the same 8.00% discount rate, and the same CapEx (USD 480,000 at Year 0) shown in the year-by-year cash flow table above.

4.2 Reading the year-by-year table

The Year 0 row contains the full USD 480,000 CapEx; the annual OpEx grows at 2.0%/yr (e.g., USD 11,000 in Year 1, USD 11,220 in Year 2), with a USD 30,000 inverter-replacement lump sum in Year 12 that drives the Year 12 cost to USD 43,677.12. Annual benefit starts at USD 123,250.00 in Year 1 (against delivered energy of 1,450,000 kWh) and grows at 1.0%/yr, while delivered energy declines at 0.5%/yr per the §3 degradation assumption. The numbers in this paragraph are read off the COMPUTED TABLES above; do not infer intermediate values.

4.3 Bounded model assumptions (explicit)

The following inputs were not stated in the original draft and are bounded model assumptions; they are NOT cited as sourced facts:

5. Vertical BoS — Ground-Mount 670 W Specifics

BoS element670 W implication (Trina Vertex N NEG19RC.27)Source row
Module dimensions & weightVerify per OEM datasheet for TSM-NEG19RC.27 at RFQ; Vertex N 132-half-cell 670 W bifacial envelopes are ~2,384 × 1,303 × 35 mm, ~38 kg[Claim: Vertex N NEG19RC.27 module envelope | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
Wind / snow design load2,400 Pa front / 1,600 Pa rear typical; ground-mount adds uplift — confirm per project wind zone[Claim: Mechanical load test values per IEC 61215-1:2021 / IEC 61215-2:2021 | Src: IEC Webstore — IEC 61215-1:2021 ed2 | URL: https://webstore.iec.ch/en/publication/61345 | accessed 2026-09-22]
String sizing vs inverter MPPT windowTrina Vertex N 670 W modules shift string length up by ≈ 1 module vs 540 W reference; final stringing to be validated against the chosen inverter OEM string-sizing tool at RFQModel assumption (inverter selection pending)
Container utilisation (40'HQ)~600–650 modules per 40'HQ depending on vertical-pack design[Claim: 40'HQ pack-out band for Vertex N NEG19RC.27 | Src: Trina Solar Vertex N product page | URL: https://www.trinasolar.com/en-glb/product/vertex-n-plus | accessed 2026-09-22]
Piling pattern & torqueDriven pile or helical screw, soil-class dependent; torque values per OEM install SOP, manual revision confirmed at RFQModel assumption (geotech input pending)
Mounting structure (rail / clamp family)Ground-mount rail and clamp selection (e.g., K2 Systems N-Rack ground-mount kit family) to be confirmed at RFQ against the project's geotech and wind zone; install manual revision pending[Claim: K2 Systems N-Rack ground-mount PV mounting kit family | Src: K2 Systems N-Rack product page | URL: https://k2-systems.com/en/product-solutions/k2-n-rack-system/ | accessed 2026-09-22]
Grounding & lightningIEC 62305-aligned; required by the Malaysian grid operator for grid-connected plants[Claim: Lightning protection standard family | Src: IEC Webstore — IEC 62305 series (designation in text; catalogue URL only) | URL: https://webstore.iec.ch/ | accessed 2026-09-22]

6. Compliance & Certifications

Certificate / StandardScopeIssuer (accredited)Source row
IEC 61215-1:2021 ed2 / IEC 61215-1-1:2021 / IEC 61215-2:2021Design qualification (crystalline Si PV modules)TÜV Rheinland / TÜV SÜD (request certificate number)[Claim: Product design-qualification standard for c-Si PV modules | Src: IEC Webstore — IEC 61215-1:2021 ed2 | URL: https://webstore.iec.ch/en/publication/61345 | accessed 2026-09-22]
IEC 61730-1:2016 ed2 / IEC 61730-2:2016Safety qualification (PV modules)Same accredited labs[Claim: PV module safety standard | Src: IEC Webstore — IEC 61730-1:2016 ed2 | URL: https://webstore.iec.ch/en/publication/25674 | accessed 2026-09-22]
IEC 61701:2020 (optional)Salt-mist corrosion (coastal sites)TÜV Rheinland / TÜV SÜD[Claim: Salt-mist corrosion severity levels | Src: IEC Webstore — IEC 61701:2020 (designation in text; catalogue URL only) | URL: https://webstore.iec.ch/ | accessed 2026-09-22]
IEC 62716:2013 (optional)Ammonia corrosion (agricultural sites)TÜV Rheinland / TÜV SÜD[Claim: Ammonia corrosion test | Src: IEC Webstore — IEC 62716:2013 (designation in text; catalogue URL only) | URL: https://webstore.iec.ch/ | accessed 2026-09-22]
UN Manual of Tests and Criteria, Rev.7 (2019), §38.3 (UN 38.3)Lithium battery transport classification (for any BESS shipped with the PV array)UN[Claim: UN transport test requirements for lithium cells/batteries | Src: UN Manual of Tests and Criteria, Rev.7 (2019), §38.3 (ST/SG/AC.10/11/Rev.7) | URL: https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria | accessed 2026-09-22]
ISPM 15 (wood packaging)Heat-treated / fumigated wooden pallets and dunnage for ocean freightIPPC ISPMs[Claim: Wood packaging compliance | Src: IPPC ISPM standards list (incl. ISPM 15) | URL: https://www.ippc.int/en/core-activities/standards-setting/ispms/ | accessed 2026-09-22]
PID / LeTID resistanceLong-term reliability under high humidity / temperature (per OEM 3rd-party test report)TÜV / UL / DNV (cert pending)[Claim: PID test methodology | Src: IEC Webstore — IEC 62804-1:2015 (designation in text; catalogue URL only) | URL: https://webstore.iec.ch/ | accessed 2026-09-22]

Always request the certificate number and the issuing lab's accreditation scope. TradVolt does not display OEM logos or certificate numbers on reference pages without written authorisation; numbers are provided in the signed datasheet pack attached to each RFQ response.

7. Duty / HS Stack (Malaysia) — Header

HS national line | Program | As-of: 2026-09-22 | SoT: PENDING — lookup at the JKDM HS portal on the actual shipment date
LayerRateStatute / portalSource row
HS chapter / heading8541 (Photovoltaic cells, whether or not assembled in modules)Royal Malaysian Customs (JKDM) HS portal — lookup on shipment date[Claim: HS heading 8541 covers PV cells and modules | Src: Royal Malaysian Customs HS classification portal (homepage + HS lookup path; verify live subline at portal on shipment date) | URL: https://www.customs.gov.my/en | accessed 2026-09-22]
National 8/10-digit sublinePENDING — lookupJKDM HS portal — confirm exact sublinePENDING — lookup at the JKDM HS portal on the shipment date
Import duty ratePENDING — lookupJKDM duty schedule, MITI exemption orders (if applicable)PENDING — lookup at the JKDM HS portal
Sales Tax (SST)PENDING — lookupRoyal Malaysian Customs — SST portalPENDING — lookup at the JKDM HS portal
MITI / SEDA exemption (if any)PENDING — lookupMITI gazette & SEDA MalaysiaPENDING — lookup at the time of import
Excise dutyGenerally not applicable to PV modulesJKDM[Claim: Excise duty scope is set by JKDM and does not currently cover PV modules under standard classification | Src: Royal Malaysian Customs (homepage + excise schedule path) | URL: https://www.customs.gov.my/en | accessed 2026-09-22]
Incoterm for ocean freightFOB Shanghai / Ningbo → CFR/CIF/DAP Port KlangICC Incoterms 2020[Claim: Incoterms 2020 definitions for FOB, CFR, CIF, DAP | Src: ICC Incoterms 2020 official rules page | URL: https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/ | accessed 2026-09-22]

TradVolt does not hardcode duty or SST rates. Every shipment must be re-quoted against the JKDM HS portal and any active MITI exemption order on the actual shipment date. Mark every line above as PENDING — lookup until the JKDM portal confirms the rate against the actual 8/10-digit national subline.

8. RFQ Form — Request a 48-hour Landed-Cost Response

Submit RFQ

Submission routes through TradVolt's intake. Source: https://tradvolt.com/rfq/. TradVolt replies within 48 hours with an itemised landed-cost sheet. The RFQ intake accepts SKU, quantity, incoterm, certifications, target HS code (if known) and free-text notes; do not attach confidential pricing in the free-text field.

9. Methodology Limits & Open Items