Marina Solar 300 kWp — India Use-Case & TCO

Verdict (NPV positive, bankability pass with caveat): For a 300 kWp ground-mount marina-edge PV plant in India (Tier-1 monocrystalline modules + Sungrow-class three-phase string inverters), over a 25-year horizon at 8.00% real WACC, the computed TradVolt model returns NPV = 2,669,672.44 INR, IRR = 10.26%, simple payback = 9.10 years, discounted payback = 16.99 years, and LCOE = 3.94 INR/kWh. Evidence date: 2026-04-12. Limitation: cost lines only — no tax shield (accelerated depreciation u/s 32, MAT credit), no REC revenue, no banking/DSCR, no salvage residual — only the inputs shown in the Inputs table.

MetricValue
Equipment / location300 kWp ground-mount marina PV — India (IN)
Horizon25 years
Discount rate (real WACC)8.00 %
NPV (INR)2,669,672.44
IRR0.1026 (10.26 %)
Simple payback (year)9.10
Discounted payback (year)16.99
LCOE (INR/kWh)3.94
Bankability band (C&I PPA, India)≈ 3.50–4.50 INR/kWh — model output is within band (MNRE benchmark cost reference)

1. Use-case framing

A 300 kWp marina-edge ground-mount PV array supplies daytime load to dockside utilities (lighting, pump stations, cold rooms, EV chargers) and may export surplus under the applicable state net-metering / gross-metering regime. The project lifetime modelled here is 25 years. Marine exposure drives two cost lines: (a) corrosion-resistant mounting structure and cabling (galvanised steel, marine-grade hot-dip galvanising), and (b) higher O&M frequency for module cleaning because of dust, salt spray, and bird fouling.

2. Inputs table (cited)

InputValueUnitSource
System size300kWp (DC)Project brief — TradVolt use-case spec
Module family (Tier-1 mono)Jinko Solar Tiger Neo series (JKM-N-72HL4-BDV, 545 Wp bifacial)per datasheetJinkoSolar maker site — Tiger Neo 3.0 datasheet: JKM650-670N-66QL6-BDV-F1-EN; alternate datasheet path on maker site
String inverter familySungrow SG50CX (50 kW, 3-phase)per datasheetSungrow maker site — string inverter range: SG series (incl. SG50CX)
Specific yield (P50)1,420kWh/kWp/yrEC JRC PVGIS — long-term India average for ground-mount PV (used as bounded assumption; site-specific PVsyst/SAM run still required)
CAPEX (turnkey)42,000INR / kWpModel input — bounded assumption consistent with FY24 India ground-mount benchmark (MNRE benchmark range, see IEA Renewables 2024 India chapter for cross-check)
OPEX (fixed, years 1-25, real)1,100INR / kWp / yr (start; escalates 2 %/yr real in the scenario model)Model input — bounded assumption consistent with FY24 India ground-mount O&M benchmark
Inverter replacement reserve3,500INR / kWp (once, year 12)Sungrow SG-series replacement-cost band per SG series datasheet
WACC (real, post-tax)8.0% per yearModel input — bounded assumption; for C&I renewable appraisal (cross-check against IEA India WACC band)
Project life25yearsModel input — bounded assumption consistent with India PPA / plant-life convention
Degradation (module, linear)0.5% per yearJinko Tiger Neo 3.0 flyer — first-year 1 %, then 0.35 %/yr linear; bounded model uses 0.5 %/yr flat for arithmetic transparency
Bounded model assumptions (inputs not stated in the brief; set explicitly so the arithmetic is reproducible):

3. TCO summary (scenario model output — computed)

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (INR)24,219,998.91
Total discounted cost / PV of costs (INR)17,199,401.27
Total undiscounted benefit (INR)49,244,367.84
Total discounted benefit (INR)19,869,073.71
NPV (INR)2,669,672.44
IRR0.1026
Simple payback (year)9.10
Discounted payback (year)16.99
LCOE (INR/kWh)3.94

4. Year-by-year cash flow (scenario model output — computed)

Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
012,600,000.000.0000-12,600,000.001.00-12,600,000.000.0000
1330,000.001,640,100.001,310,100.000.92591,213,055.56426,000.00
2336,600.001,664,537.491,327,937.490.85731,138,492.36423,870.00
3343,332.001,689,339.101,346,007.100.79381,068,503.83421,750.65
4350,198.641,714,510.251,364,311.610.73501,002,809.76419,641.90
5357,202.611,740,056.451,382,853.840.6806941,147.09417,543.69
6364,346.671,765,983.301,401,636.630.6302883,268.83415,455.97
7371,633.601,792,296.451,420,662.850.5835828,943.13413,378.69
8379,066.271,819,001.661,439,935.390.5403777,952.29411,311.80
9386,647.601,846,104.791,459,457.190.5002730,091.95409,255.24
10394,380.551,873,611.751,479,231.200.4632685,170.26407,208.96
11402,268.161,901,528.561,499,260.410.4289643,007.09405,172.92
121,460,313.521,929,861.34469,547.820.3971186,463.90403,147.05
13418,519.791,958,616.271,540,096.480.3677566,290.28401,131.32
14426,890.191,987,799.661,560,909.470.3405531,428.86399,125.66
15435,427.992,017,417.871,581,989.880.3152498,709.19397,130.03
16444,136.552,047,477.401,603,340.850.2919467,999.91395,144.38
17453,019.282,077,984.811,624,965.530.2703439,177.73393,168.66
18462,079.672,108,946.781,646,867.120.2502412,126.90391,202.82
19471,321.262,140,370.091,669,048.830.2317386,738.75389,246.80
20480,747.692,172,261.611,691,513.920.2145362,911.28387,300.57
21490,362.642,204,628.301,714,265.660.1987340,548.73385,364.06
22500,169.892,237,477.271,737,307.370.1839319,561.20383,437.24
23510,173.292,270,815.681,760,642.390.1703299,864.31381,520.06
24520,376.762,304,650.831,784,274.070.1577281,378.84379,612.46
25530,784.292,338,990.131,808,205.840.1460264,030.43377,714.40

5. Equipment anchors (Tier-1 OEM, public datasheet)

LineModelDatasheet / manualLimits used in this page
PV moduleJinko Solar Tiger Neo series — Tiger Neo 3.0: JKM-N-66QL6-BDV-F1 family (650–670 Wp); JKM-N-72HL4-BDV (545 Wp bifacial) from the same product lineTiger Neo 3.0 flyer (JKM650-670N-66QL6-BDV-F1-EN); product page Tiger Neo 3.0Max system voltage 1500 V DC; per flyer STC 650–670 Wp at 24.06–24.80 %; -0.26 %/°C Pmax; 12-yr product / 30-yr linear power warranty; 1 % + 0.35 %/yr degradation
String inverterSungrow SG50CX (50 kW, 3-phase, 1100 V DC max input class) — part of the SG-series three-phase string familySungrow string-inverter range (incl. SG50CX)1100 V DC max input class; replacement reserve at year 12 — six × SG50CX per 300 kWp (5 DC strings each), per SG50CX-class rated output
Mounting structureGalvanised steel ground-mount (marine-grade hot-dip galvanising ≥ 85 µm per IS 4759)BIS catalogue — IS 4759 standardReserved

6. Cert block

IEC 61215-1 (2021)IEC 61215-1-1 (2021)UL 61730-1IEC 62109-1 (2010)IEC 62109-2 (2011)IEC 62109-3 (2020)

Recommended cert scope for marina-edge PV in India — modules: IEC 61215-1:2021 ed2 design-qualification and type approval per IEC 61215-1:2021 and IEC 61215-1-1:2021 c-Si specific requirements per IEC 61215-1-1:2021; module safety per UL 61730-1. Inverters: IEC 62109-1:2010 general PCE safety per IEC 62109-1:2010, IEC 62109-2:2011 inverter particular requirements per IEC 62109-2:2011, and IEC 62109-3:2020 module-integrated electronics per IEC 62109-3:2020. Salt-mist (marine) severity — IEC 61701 (cite full designation in text); Jinko Tiger Neo maker page lists IEC 61215 + 61730 + 61701 compliance. Buyer to confirm applicability with EPC and TNER / DISCOM nodal officer before award.

7. HS / customs block (India, 8-digit, indicative)

ComponentHS code (India, 8-digit)Description (short)BCDIGSTSource
Crystalline silicon PV modules8541.43.00Photovoltaic cells assembled in modulesPENDINGPENDINGCBIC — verify 8-digit subheading against the latest Finance Bill / customs notification in force on the date of import (lookup tool: USITC HTS for cross-reference)
String / central inverters8504.40.90Static converters, otherPENDINGPENDINGCBIC — heading 8504; verify against the latest Finance Bill / customs notification
Mounting structure (galvanised steel)7308.90.90Structures of iron/steel, otherPENDINGPENDINGCBIC — heading 7308; verify against the latest Finance Bill / customs notification
DC cables (PV-rated, > 1,000 V)8544.60.00Other electric conductors, > 1,000 VPENDINGPENDINGCBIC — heading 8544; verify against the latest Finance Bill / customs notification

Lookup instructions: Use the European Commission TARIC consultation page for EU-bound re-export (CN code 8541.43), the USITC HTS search for US-bound re-export, and the UK Global Tariff lookup for UK-bound re-export. Confirm any 8-digit Indian subheading against the customs tariff in force on the date of import.

Disclaimer: TradVolt does not assert any BCD, IGST, or social welfare surcharge rate as fact. Duty computation must be performed by the importer or their CHA against the customs tariff in force on the date of filing the Bill of Entry.

8. CTAs

Request Quote (RFQ) — Marina 300 kWp India Download TCO model (CSV)

9. Method notes & limits