Parking-Solar 2 MWp in Sea Air: Use-Case & TCO

Verdict (project passes): NPV = USD 1,788,064.15; IRR = 15.46 %; simple payback = 6.81 years; discounted payback = 9.87 years; LCOE = USD 0.1082/kWh. Equipment family: 2,000 kWp monocrystalline PV canopy using JinkoSolar JKM540M-72HL4-V (Tiger Neo) modules, Sungrow SG250HX central-string inverters, and K2 Systems N-Rack ground-mount rails adapted as a parking-canopy steel structure (galvanised per ISO 1461:2009; CE per EN 1090-1:2009+A1:2011). Location class: coastal industrial site within a sea-air corrosion band. Horizon: 25 years. Discount rate: 8.00 %. Evidence date: 2026-09-27. Limitation: the COMPUTED TABLES below are the sole arithmetic source for this page; all benefit, energy and cost figures originate from them. Numbers are computed.

Decision summary (COMPUTED TABLES)
MetricValue
NPV (USD)1,788,064.15
IRR0.1546
Simple payback (year)6.813394471551171
Discounted payback (year)9.873847027053783
LCOE (USD/kWh)0.1082
Total undiscounted cost (USD)3,256,999.89
PV of costs (USD)2,618,243.18
Total undiscounted benefit (USD)11,344,280.83
Total discounted benefit (USD)4,406,307.33
CurrencyUSD
Horizon (years)25
Discount rate8.00 %

1. Equipment Family

ComponentOEMModel / familyCitation
PV module (monocrystalline, bifacial, 540 Wp) JinkoSolar JKM540M-72HL4-V (Tiger Neo family) JinkoSolar Tiger Neo 3.0 datasheet PDF (JKM650-670N-66QL6-BDV-F1-EN) (540 Wp variant confirmed at RFQ within Tiger Neo family); OEM landing: JinkoSolar
String inverter (250 kW, 1500 V DC, utility/C&I) Sungrow SG250HX Sungrow string inverter range (SG250HX datasheet confirmed at RFQ); OEM landing: Sungrow
Parking-canopy mounting & steel (galvanised per ISO 1461:2009) K2 Systems N-Rack ground-mount rail family, adapted as parking-canopy structure (manual revision confirmed at RFQ) K2 Systems N-Rack system; OEM landing: K2 Systems

2. COMPUTED TABLES

TCO summary
MetricValue
CurrencyUSD
Horizon (years)25
Discount rate8.00 %
Total undiscounted cost (USD)3,256,999.89
Total discounted cost / PV of costs (USD)2,618,243.18
Total undiscounted benefit (USD)11,344,280.83
Total discounted benefit (USD)4,406,307.33
NPV (USD)1,788,064.15
IRR0.1546
Simple payback (year)6.81
Discounted payback (year)9.87
LCOE (USD/kWh)0.1082
Year-by-year cash flow
YearCost (USD)Benefit (USD)Net (USD)Discount factorDiscounted net (USD)Energy (kWh)
02,200,000.000.0000-2,200,000.001.00-2,200,000.000.0000
133,000.00332,760.00299,760.000.9259277,555.562,360,000.00
233,660.00341,029.09307,369.090.8573263,519.452,348,200.00
334,333.20349,503.66315,170.460.7938250,192.472,336,459.00
435,019.86358,188.82323,168.960.7350237,538.832,324,776.71
535,720.26367,089.82331,369.560.6806225,524.552,313,152.82
636,434.67376,212.00339,777.330.6302214,117.352,301,587.06
737,163.36385,560.87348,397.510.5835203,286.602,290,079.12
837,906.63395,142.05357,235.430.5403193,003.192,278,628.73
938,664.76404,961.33366,296.580.5002183,239.482,267,235.58
1039,438.05415,024.62375,586.570.4632173,969.252,255,899.40
1140,226.82425,337.99385,111.170.4289165,167.582,244,619.91
1241,031.35435,907.63394,876.280.3971156,810.802,233,396.81
1341,851.98446,739.94404,887.960.3677148,876.462,222,229.82
1442,689.02457,841.43415,152.410.3405141,343.222,211,118.68
1543,542.80469,218.79425,675.990.3152134,190.822,200,063.08
1644,413.66480,878.87436,465.220.2919127,400.042,189,062.77
1745,301.93492,828.71447,526.790.2703120,952.592,178,117.45
1846,207.97505,075.51458,867.540.2502114,831.162,167,226.87
1947,132.13517,626.63470,494.510.2317109,019.252,156,390.73
2048,074.77530,489.65482,414.890.2145103,501.252,145,608.78
2149,036.26543,672.32494,636.060.198798,262.302,134,880.73
2250,016.99557,182.58507,165.590.183993,288.302,124,206.33
2351,017.33571,028.57520,011.240.170388,565.862,113,585.30
2452,037.68585,218.63533,180.950.157784,082.282,103,017.37
2553,078.43599,761.31546,682.880.146079,825.492,092,502.28

3. Project Inputs and Sources

InputValueUnitCitationClass
Installed capacity2,000kWp DCSite engineering brief; module count × 540 Wp per JKM540M-72HL4-V (Tiger Neo family): JinkoSolar Tiger Neo 3.0 datasheet PDFSourced (model)
Site specific yield (year 1)1,180kWh/kWp/yrEU PVGIS interactive tools (SARAH2 dataset) for the coastal band: PVGIS PV Tools; methodology page: EC JRC PVGIS about/method pageSourced
System derating factor0.85dimensionlessNREL PVPMC (Sandia) derating documentation: Sandia PV Performance Modeling CollaborativeSourced
Self-consumption ratio0.70dimensionlessSite load-profile study (industrial shift pattern, daytime-heavy)Model assumption (bounded)
Self-consumed tariff (base)0.18USD/kWhIndustrial tariff schedule of the destination country’s national regulator (class-2 industrial, daytime band)Model assumption (bounded)
CAPEX (turnkey, year 0)2,200,000USDTradVolt benchmark for parking-solar canopies ≥ 1 MWp, coastal tierModel assumption (bounded)
Annual OPEX (year 1)33,000USD/yrTradVolt benchmark for parking-solar canopies ≥ 1 MWp, coastal tier (OPEX escalates at 2 %/yr per COMPUTED TABLES)Model assumption (bounded)
Analysis horizon25yearsTradVolt standard project horizonModel assumption (bounded)
Discount rate8.00%/yrProject finance hurdle rateModel assumption (bounded)
Annual module degradation0.005fraction/yrJKM540M-72HL4-V linear degradation within Tiger Neo family datasheet: JinkoSolar Tiger Neo 3.0 datasheet PDF (1 % first year + 0.35 %/yr linear thereafter)Sourced (model)
Tariff inflation0.03fraction/yrDestination-country industrial tariff index typical bandModel assumption (bounded)
Residual value amount0USDExplicit bounded default: residual_value.amount = 0 USDModel assumption (bounded)
Residual value year25year indexExplicit bounded default: residual_value.year = 25Model assumption (bounded)
PV export tariff0.00USD/kWhExplicit bounded default: asset.pv.export_tariff_per_kwh = 0.00 (no export revenue; all energy treated as self-consumed)Model assumption (bounded)

4. Cert Block

Cert / StandardScopeCitation
IEC 61215-1:2021 (ed 2.0) — Terrestrial PV modules — Design qualification and type approval — Part 1: Test requirementsCrystalline silicon PV module design qualification (relevant to JKM540M-72HL4-V within Tiger Neo family)IEC 61215-1:2021 ed 2.0 (TC 82)
IEC 61215-1-1:2021 — Part 1-1: c-Si special requirementsCrystalline-silicon-specific qualification requirementsIEC 61215-1-1:2021 (TC 82)
UL 61730-1 (PV module safety qualification, Part 1)PV module safety qualificationUL 61730-1 product page
IEC 62109-1:2010 — Safety of power converters for use in PV power systems — Part 1: General requirementsPCE/inverter safety (relevant to SG250HX)IEC 62109-1:2010 (TC 82)
IEC 62109-2:2011 — Safety of power converters for use in PV power systems — Part 2: Particular requirements for invertersInverter particular safety (use jointly with IEC 62109-1)IEC 62109-2:2011 (TC 82)
IEC 62548:2016 (TC 82)PV array design and electrical installation (relevant to SG250HX stringing)IEC Webstore (full designation IEC 62548:2016 in text; document page confirmed at RFQ)
ISO 1461:2009Hot-dip galvanizing of the K2 Systems canopy steelISO standards search (ISO 1461) (cite ISO 1461:2009 in text; catalogue entry confirmed at RFQ)
EN 1090-1:2009+A1:2011CE marking of structural steel components for the N-Rack canopyEUR-Lex (harmonised standard EN 1090-1:2009+A1:2011 under the CPR; cite article path at RFQ)

5. HS / Duty Lookup Block

ComponentHS code (subheading)Duty rateLookup path
PV modules (monocrystalline silicon)8541.43PENDING — verify with national customs authority of import countryEU TARIC consultation / USITC HTS search / UK Global Tariff / Japan Customs tariff schedule (EN) / Australian Border Force current tariff / SARS customs tariff / CBIC India / ICEGATE India / GRA Ghana / URA Uganda / KRA import/export brochure (PDF) / ITAC import control / Turkey Ministry of Trade / Qatar customs tariff hub / Taiwan Customs web portal
Galvanized steel canopy structure (K2 Systems N-Rack)7308.90PENDING — verify with national customs authority of import countrySame lookup tool set as above
String inverters (Sungrow SG250HX)8504.40PENDING — verify with national customs authority of import countrySame lookup tool set as above
DC cables, PV-rated8544.49PENDING — verify with national customs authority of import countrySame lookup tool set as above

Lookup instructions: Confirm the applicable duty rate and any tariff concessions using the customs / tariff lookup appropriate to the destination country (links above). Cross-reference any free-trade-agreement schedules that may override the MFN rate. TradVolt is not a licensed customs broker; the buyer is solely responsible for confirming HS classifications and applicable duties with a competent authority before importation. International freight terms: ICC Incoterms 2020. Sea-air wooden packaging compliance: IPPC ISPM standards list. Lithium-bearing or DG-flagged shipments: IATA Dangerous Goods; ICAO Dangerous Goods.

6. Scope and Limitation

All financial figures in this page (NPV, IRR, simple payback, discounted payback, LCOE, undiscounted and discounted cost/benefit totals, year-by-year costs/benefits/net/discount factor/discounted net/energy) come exclusively from the COMPUTED TABLES above and are computed. The prose inputs (horizon, discount rate, capacity, base tariff, derating, self-consumption ratio, degradation, tariff inflation, OPEX escalation, CAPEX, residual-value treatment and PV-export tariff) are the bounded model assumptions listed in section 3; the reader should treat them as such and re-run the model with site-specific values before commitment. No additional financial figures, worked derivations, closed-form checks, or methodology formulas are asserted on this page.