Sports Club Solar 250 kWp — Sea-Coast Use Case & 25-Year TCO

Verdict (base case, evidence date 2026-01-15, 25-year horizon, EUR): NPV = EUR 446,059; LCOE = 0.0587 EUR/kWh; discounted payback = 4.43 years; simple payback = 3.80 years; IRR = 27.64%. Limit: numbers are scenario-illustrative and depend on the explicit bounded inputs below; replace with EPC quote, OEM datasheets, and local-DSO feed-in policy before binding procurement.

Decision at a glance
MetricValueNote
Equipment / location250 kWp DC rooftop PV, sea-coast sports club (<500 m shoreline, ISO 9223 C5/CX)Boundary assumption: PV + string inverters + AC tie + monitoring; no battery, no EV
Horizon25 yearsUse-case convention
Discount rate6.00 %Use-case convention
CurrencyEUR—
NPV446,059 EURPositive — economic case clears hurdle rate
IRR27.64 %Well above discount rate
Simple payback3.80 yearsNominal
Discounted payback4.43 yearsPV-weighted
LCOE0.0587 EUR/kWhBelow the 0.22 EUR/kWh imported grid tariff blend
Evidence date2026-01-15Spot indices are weekly — re-validate at RFQ
LimitationSelf-consumption 50%, FiT 0.06 EUR/kWh, O&M 2.0%/yr, insurance 0.4%/yr are bounded model assumptionsReplace with project-specific values before binding procurement

Use case: 250 kWp rooftop PV installation at a sea-coast sports club (tennis/padel/fitness, single building). Salt-air corrosion drives higher BoS and O&M assumptions. Page revision r9 — financial figures are taken verbatim from the scenario model; inputs are stated explicitly as cited figures or bounded assumptions.

1. Site Profile & Use-Case Boundary

2. Inputs Table (cited or explicit bounded assumption)

InputValueUnitSource / Basis
System size250kWp DCUse-case definition (this page)
Specific yield (sea-coast, low-pitch metal roof)1,150kWh/kWp·yrIRENA, "Renewable Power Generation Costs in 2023" — irena.org/Publications/2024/Sep/Renewable-power-generation-costs-in-2023; PVGIS EC JRC PVGIS
Module cost (Tier-1 mono, sea-coat ready)0.22EUR/WpPVTEC pvXchange weekly price index — pv-tech.org/weekly-pv-pricing
String inverter (2 × 125 kW)0.06EUR/WpPVTEC pvXchange weekly price index — pv-tech.org/weekly-pv-pricing; Sungrow string-inverter range datasheet confirmed at RFQ
Racking + salt-air aluminium + clamps0.09EUR/WpK2 Systems D-Dome sea-coast catalogue — k2-systems.com (rail/kit model + manual revision confirmed at RFQ)
DC + AC BoS (cabling, combiner, AC panel)0.07EUR/WpIEA PVPS, "Trends in PV Applications 2024", Annex B BoS benchmark — iea-pvps.org/snapshot-reports/trends-in-pv-applications-2024
Installation labour (sea-coast, height > 8 m)0.10EUR/WpSolarPower Europe, "O&M Best Practice Guidelines 2023", sea-coast adder — solarpowereurope.org/operations-and-maintenance-best-practice-guidelines
Grid-tie + commissioning + metering0.04EUR/WpIEA PVPS, "Trends in PV Applications 2024", Annex B BoS benchmark — iea-pvps.org/snapshot-reports/trends-in-pv-applications-2024
Annual O&M (sea-coast, module cleaning 4×/yr)2.0%of capex/yrModel assumption (bounded) — reconciles to engine PV of costs
Insurance0.4%of capex/yrModel assumption (bounded) — engineering convention for EU C&I rooftop PV; replace with broker quote before binding procurement
Inverter replacement at year 120.06EUR/Wp (nominal)PVTEC pvXchange weekly price index — pv-tech.org/weekly-pv-pricing
Degradation (linear)0.5%per yearIEA PVPS, "Trends in PV Applications 2024", Tier-1 manufacturer warranties — iea-pvps.org/snapshot-reports/trends-in-pv-applications-2024
Self-consumption share of generation50%fractionUse-case boundary assumption (this page)
Imported grid tariff (blended)0.22EUR/kWhEurostat electricity price statistics — ec.europa.eu/eurostat electricity price statistics
Export / feed-in tariff0.06EUR/kWhModel assumption (bounded) — verify with local DSO
Tariff escalation3.0%per yearEurostat 2014–2024 CAGR for non-household band — ec.europa.eu/eurostat databrowser
Discount rate6.0%per yearUse-case convention (this page)
Analysis horizon25yearsUse-case convention (this page)
Residual value0EURModel assumption (bounded default) — no salvage modelled; conservative
Residual year25year indexModel assumption (bounded default) — aligned to horizon

3. Equipment Reference (real publicly marketed models)

The 250 kWp stack at this site would typically be assembled from the following OEM model families. Final BoM is RFQ-pending; do not infer a specific supplier choice from this list.

4. Base-Case Computed Tables (from the computed engine — copy verbatim)

TCO summary
MetricValue
CurrencyEUR
Horizon (years)25
Discount rate6.00 %
Total undiscounted cost (EUR)271,465.44
Total discounted cost / PV of costs (EUR)206,198.01
Total undiscounted benefit (EUR)1,372,182.06
Total discounted benefit (EUR)652,257.44
NPV (EUR)446,059.43
IRR0.2764
Simple payback (year)3.80
Discounted payback (year)4.43
LCOE (EUR/kWh)0.0587
Year-by-year cash flow
YearCost (EUR)Benefit (EUR)Net (EUR)Discount factorDiscounted net (EUR)Energy (kWh)
0145,000.000.0000-145,000.001.00-145,000.000.0000
13,480.0040,250.0036,770.000.943434,688.68287,500.00
23,549.6041,250.2137,700.610.890033,553.41286,062.50
33,620.5942,275.2838,654.690.839632,455.22284,632.19
43,693.0043,325.8239,632.820.792131,392.90283,209.03
53,766.8644,402.4740,635.600.747330,365.29281,792.98
63,842.2045,505.8741,663.670.705029,371.24280,384.02
73,919.0546,636.6942,717.640.665128,409.67278,982.10
83,997.4347,795.6143,798.190.627427,479.52277,587.19
94,077.3748,983.3344,905.960.591926,579.77276,199.25
104,158.9250,200.5746,041.650.558425,709.41274,818.25
114,242.1051,448.0547,205.950.526824,867.51273,444.16
1219,326.9452,726.5433,399.590.497016,598.57272,076.94
134,413.4854,036.7949,623.310.468823,265.34270,716.56
144,501.7555,379.6150,877.850.442322,503.32269,362.97
154,591.7956,755.7952,164.000.417321,766.22268,016.16
164,683.6258,166.1753,482.550.393621,053.21266,676.08
174,777.2959,611.6054,834.300.371420,363.51265,342.70
184,872.8461,092.9556,220.110.350319,696.37264,015.98
194,970.3062,611.1157,640.810.330519,051.04262,695.90
205,069.7064,166.9959,097.290.311818,426.81261,382.43
215,171.1065,761.5460,590.450.294217,823.01260,075.51
225,274.5267,395.7262,121.200.277517,238.95258,775.14
235,380.0169,070.5063,690.490.261816,674.00257,481.26
245,487.6170,786.9065,299.290.247016,127.52256,193.85
255,597.3672,545.9666,948.600.233015,598.93254,912.88

Cost column reconciles to the engine's PV of costs of EUR 206,198.01 (discounted) / EUR 271,465.44 (undiscounted). Benefit column reconciles to EUR 652,257.44 (discounted) / EUR 1,372,182.06 (undiscounted). NPV = discounted benefit − discounted cost = EUR 446,059.43. The year-12 cost spike of EUR 19,326.94 reflects the EUR 15,000 nominal inverter replacement plus that year's O&M and insurance. All figures above are copied verbatim from the computed engine.

5. Inputs vs. Tables — Cross-check

Prose inputValue used in proseValue reflected in computed tablesMatch
Horizon25 years25 rows + Year 0Yes
Discount rate6.00 %6.00 %Yes
Capex (Year 0)EUR 145,000Year 0 cost = 145,000.00Yes
Year-1 generation250 kWp × 1,150 kWh/kWp = 287,500 kWhYear-1 energy = 287,500.00 kWhYes
Year-1 benefitEUR 40,250Year-1 benefit = 40,250.00Yes
NPVEUR 446,059EUR 446,059.43Yes
IRR27.64 %0.2764Yes
Discounted payback4.43 years4.43Yes
LCOE0.0587 EUR/kWh0.0587Yes

6. Certification & Standards Block (informational)

Standards typically relevant for sea-coast sports-club PV:

Certification status is project-specific; verify against the EPC's declared BoM, the OEM datasheet and revision, and your local DSO grid-code annex before procurement.

7. HS Code & Tariff Lookup (rates PENDING)

HS code (6-digit, WCO 2022)Description (illustrative)Duty rateLookup tool
8541.43Photovoltaic cells assembled in modulesPENDINGEU TARIC consultation / USITC HTS / UK Global Tariff
8504.40Static converters (string inverters)PENDINGEU TARIC consultation
7616.99Other articles of aluminium (racking)PENDINGEU TARIC consultation
8544.49Other electric conductors (DC cabling)PENDINGEU TARIC consultation

Lookup instructions: confirm the 6-digit HS classification with the exporter's customs broker, then check the applicable national tariff schedule (EU TARIC, UK HMRC Trade Tariff via trade-tariff.service.gov.uk, US HTSUS via hts.usitc.gov; for other jurisdictions use Japan Customs, Australian Border Force, SARS, Ghana Revenue Authority, Uganda Revenue Authority, or Turkey Ministry of Trade GTIP) for the 8–10-digit duty rate. Treat any third-party duty figure as non-binding.

Disclaimer: TradVolt does not provide legal or customs advice. Duty rates, VAT treatment, and tariff classifications must be confirmed with a licensed customs broker or competent national authority. Numbers on this page are worked illustrations, not quotations.

Next step — Request a tailored quote: Submit RFQ for this 250 kWp sea-coast sports-club configuration

8. Sources Cited (specific document URLs)

Items flagged as model assumptions (O&M 2.0%, insurance 0.4%, FiT 0.06 EUR/kWh, escalation 3.0%, residual value 0, residual year 25, self-consumption 50%) are explicit bounded defaults, not published statistics. Replace with project-specific quotes and local-DSO policy confirmations before binding procurement.