TradVolt › Use Cases › Textile Solar 2 MWp India

Textile Solar 2 MWp in India — Use Case & Total Cost of Ownership

Verdict (read first)

Answer: NPV INR 168,846,062 (positive); discounted payback 2.19 years; simple payback 1.86 years; LCOE 2.20 INR/kWh; IRR 55.55%. Equipment scope: 2 MWp DC rooftop + captive-ground-mount hybrid PV plant (crystalline-silicon modules, string inverters, aluminium mounting). Location: textile spinning/weaving cluster, India. Horizon: 25 years. Evidence date: 2026-02-15. Limitation: figures are scenario-bound and computed only within the computed cash flow; tariff escalation, capex, and yield assumptions are stated below and any change materially shifts NPV.

Decision table
IndicatorValueUnit
NPV168,846,062INR
IRR55.55%
Simple payback1.86years
Discounted payback2.19years
LCOE2.20INR/kWh
Discount rate11.00%/yr
Horizon25years

1. Use-Case Profile

A 2 MWp DC rooftop and captive-ground-mount hybrid solar PV system serving a textile spinning and weaving cluster in India. The plant offsets grid electricity consumed by ring frames, winding machines, humidification plant, and lighting loads.

2. Equipment Identification

ItemModel / family (named for RFQ scoping)Public product pageOEM manual revision
PV module (LONGi)LONGi Hi-MO 9 (back-contact HPBC 2.0, up to 670 W, up to 24.8% efficiency; bifaciality up to 80%)https://www.longi.com/en/products/modules/hi-mo-9/PENDING — datasheet rev locked at RFQ; look up trail dated 2026-02-15
PV module (Jinko)Jinko Solar Tiger Neo 3.0 N-type (JKM650-670N-66QL6-BDV-F1-EN)https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdfPENDING — datasheet rev locked at RFQ; look up trail dated 2026-02-15
PV module (alternate)Canadian Solar TopHiKu6 (up to 620 W, up to 23.0%)https://www.canadiansolar.com/na/tophiku6/PENDING — datasheet rev locked at RFQ; look up trail dated 2026-02-15
String inverter (Sungrow)Sungrow SG125HT C&I 3-phase string inverterhttps://www.sungrowpower.com/en/products/string-inverterPENDING — user-manual rev locked at RFQ; look up trail dated 2026-02-15
String inverter (Huawei)Huawei SUN2000-330KTL-H1 (300 kW class) — FusionSolarhttps://solar.huawei.com/enPENDING — user-manual rev locked at RFQ; look up trail dated 2026-02-15
String inverter (SMA, alt.)SMA Sunny Tripower CORE1 (33-US / 50-US / 62-US; 6 MPP trackers; 150-1000 V)https://www.sma-america.com/products/solarinverters/sunny-tripower-core1PENDING — user-manual rev locked at RFQ; look up trail dated 2026-02-15
Mounting structureK2 Systems S-Dome 6 (aluminium rail system for trapezoidal/flat roofs)https://k2-systems.com/en/PENDING — installation-manual rev locked at RFQ; look up trail dated 2026-02-15
Mounting alt.K2 Systems N-Rack ground-mount system (driven-pile)https://k2-systems.com/en/product-solutions/k2-n-rack-system/PENDING — installation-manual rev locked at RFQ; look up trail dated 2026-02-15

Exact BOM, OEM manual revision, torque values, max system voltage, and SOC limits (if BESS added later) are locked at the RFQ stage against the chosen supplier's datasheet pack.

3. TCO Inputs (Scenario-Bound)

ParameterValueUnitSource
Plant capacity (DC)2.0MWpUse-case scope (TradVolt)
Specific yield (year 1)1,450kWh/kWp/yrModel assumption (state-weighted, MNRE Solar Energy Statistics 2023 narrative)
Module cost9.50INR/WpModel assumption (consistent with recent Indian C&I pricing reports)
Inverter cost1.20INR/WpModel assumption
Balance-of-System4.80INR/WpModel assumption
EPC + civil3.00INR/WpModel assumption
Developer overhead1.00INR/WpModel assumption
Annual O&M0.45INR/Wp/yrModel assumption
Insurance0.05INR/Wp/yrModel assumption
Inverter replacement (year 12)0.60INR/WpModel assumption (nominal; cash flow uses escalated figure)
Module degradation0.50%/yrModel assumption (linear)
Tariff (grid import avoidance)7.50INR/kWhModel assumption (CEA industrial narrative)
Tariff escalation3.00%/yrModel assumption
O&M escalation5.00%/yrModel assumption
Discount rate (WACC)11.00%/yrModel assumption
Analysis horizon25yearsUse-case scope
Residual value (asset end of horizon)0INRModel assumption (bounded default; ZERO-AS-MISSING)
Self-consumption share100%Model assumption (captive textile-mill load; bounded default)
Export tariff (excess export)0INR/kWhModel assumption (no export credit; bounded default ZERO-AS-MISSING)

All inputs above are scenario-bound assumptions, not sourced market facts. Only the computed numbers in the COMPUTED TABLES below are computed.

4. TCO Summary (computed)

TCO summary
MetricValue
CurrencyINR
Horizon (years)25
Discount rate11.00 %
Total undiscounted cost (INR)87,927,098.82
Total discounted cost / PV of costs (INR)51,855,290.51
Total undiscounted benefit (INR)741,489,686.31
Total discounted benefit (INR)220,701,352.02
NPV (INR)168,846,061.51
IRR0.5555
Simple payback (year)1.86
Discounted payback (year)2.19
LCOE (INR/kWh)2.20

5. Year-by-Year Cash Flow (computed)

Year-by-year cash flow
YearCost (INR)Benefit (INR)Net (INR)Discount factorDiscounted net (INR)Energy (kWh)
039,000,000.000.0000-39,000,000.001.00-39,000,000.000.0000
11,000,000.0021,750,000.0020,750,000.000.900918,693,693.692,900,000.00
21,050,000.0022,290,487.5021,240,487.500.811617,239,256.152,885,500.00
31,102,500.0022,844,406.1121,741,906.110.731215,897,494.362,871,072.50
41,157,625.0023,412,089.6122,254,464.610.658714,659,705.152,856,717.14
51,215,506.2523,993,880.0322,778,373.780.593513,517,856.172,842,433.55
61,276,281.5624,590,127.9523,313,846.390.534612,464,534.332,828,221.38
71,340,095.6425,201,192.6323,861,096.990.481711,492,898.062,814,080.28
81,407,100.4225,827,442.2724,420,341.850.433910,596,633.382,800,009.88
91,477,455.4426,469,254.2124,991,798.760.39099,769,913.222,786,009.83
101,551,328.2227,127,015.1825,575,686.960.35229,007,359.982,772,079.78
111,628,894.6327,801,121.5026,172,226.880.31738,304,010.882,758,219.38
122,910,339.3628,491,979.3725,581,640.010.28587,312,277.052,744,428.28
131,795,856.3329,200,005.0627,404,148.730.25757,056,958.962,730,706.14
141,885,649.1429,925,625.1928,039,976.040.23206,505,129.332,717,052.61
151,979,931.6030,669,276.9728,689,345.370.20905,996,197.892,703,467.35
162,078,928.1831,431,408.5029,352,480.320.18835,526,843.222,689,950.01
172,182,874.5932,212,479.0130,029,604.420.16965,094,000.372,676,500.26
182,292,018.3233,012,959.1130,720,940.790.15284,694,841.052,663,117.76
192,406,619.2333,833,331.1431,426,711.910.13774,326,755.432,649,802.17
202,526,950.2034,674,089.4232,147,139.230.12403,987,335.282,636,553.16
212,653,297.7135,535,740.5432,882,442.840.11173,674,358.432,623,370.39
222,785,962.5936,418,803.7033,632,841.110.10073,385,774.442,610,253.54
232,925,260.7237,323,810.9734,398,550.250.09073,119,691.342,597,202.27
243,071,523.7638,251,307.6735,179,783.910.08172,874,363.422,584,216.26
253,225,099.9439,201,852.6735,976,752.720.07362,648,179.942,571,295.18

All values in INR except where labelled. Discount rate is per year; tariff escalation and opex escalation are per year. PV of costs = INR 51,855,290.51; PV of benefits = INR 220,701,352.02; NPV = PV(benefits) − PV(costs) = INR 168,846,061.51.

Download the year-by-year cash flow (CSV)

6. Compliance & Standards Reference

DomainStandard / schemeReference URLStatus
PV module safety qualification (c-Si)IEC 61215-1:2021 ed2 — Terrestrial photovoltaic (PV) modules — Design qualification and type approval — Part 1: Test requirements (TC 82)https://webstore.iec.ch/en/publication/61345PENDING — confirm supplier test certificate
PV module safety qualification (c-Si, special)IEC 61215-1-1:2021 — Special requirements for c-Si modules (TC 82)https://webstore.iec.ch/en/publication/61346PENDING — confirm supplier test certificate
PV module safety qualificationUL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1PENDING — confirm supplier test certificate
PCE (inverter) safety — generalIEC 62109-1:2010 — Safety of power converters for use in photovoltaic power systems — Part 1: General requirements (TC 82)https://webstore.iec.ch/en/publication/6470PENDING — confirm supplier test certificate
PCE (inverter) safety — inverter particularIEC 62109-2:2011 — Safety of power converters for use in photovoltaic power systems — Part 2: Particular requirements for inverters (use jointly with IEC 62109-1) (TC 82)https://webstore.iec.ch/en/publication/6471PENDING — confirm supplier test certificate
Module & inverter standards catalogueIEC Webstore (catalogue for IEC 61215, IEC 61730, IEC 62109, and related)https://webstore.iec.ch/PENDING — confirm supplier test certificate
BoS / module quality order (India)MNRE Approved List of Models and Manufacturers (ALMM) — Indiahttps://almm.ureda.com.in/ (official ALMM portal; full listing PDF confirmed at RFQ)PENDING — confirm ALMM listing
EHS (EPC contractor)ISO 45001 (search via ISO catalogue)https://www.iso.org/search.html?q=2859PENDING — confirm audit certificate
HS / duty lookup (India import)Indian Customs ICEGATE — Tariff / ITC-HS chapter searchhttps://www.icegate.gov.in/PENDING — confirm applicable BCD/IGST notification (HS 8541.40)
HS / duty lookup (India customs parent)Central Board of Indirect Taxes and Customs (CBIC)https://www.cbic.gov.in/PENDING — confirm applicable BCD/IGST notification

Standard designations above are cited verbatim with edition or scheme name. Where a deep document URL is gated (e.g., ALMM listing PDF, ICEGATE chapter PDF), the portal home is cited and the exact document is confirmed at RFQ stage.

7. Logistics & Trade Reference

TopicReferenceURL
Incoterms (delivery terms)ICC Incoterms 2020https://iccwbo.org/business-solutions/incoterms-rules/incoterms-2020/
Lithium battery transport (UN 38.3)UN Manual of Tests and Criteria (ST/SG/AC.10/11/Rev.7)https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria
Wood packaging (ISPM 15)IPPC ISPMs (incl. ISPM 15)https://www.ippc.int/en/core-activities/standards-setting/ispms/
Air freight (DG rules for Li-ion)IATA Dangerous Goods Regulationshttps://www.iata.org/en/programs/cargo/dgr/
Sea freight documentationFIATA freight forwarding documentshttps://fiata.org/

8. Sources Table

TopicReferenceURLUse on this page
EU Battery Regulation (if BESS added later)Regulation (EU) 2023/1542https://eur-lex.europa.eu/eli/reg/2023/1542/ojReference only (this scope is PV-only)
EU duty / HS lookupEuropean Commission TARIC consultationhttps://ec.europa.eu/taxation_customs/dds2/taric/taric_consultation.jsp?Lang=enReference only (export-route HS)
US duty / HS lookupUSITC Harmonized Tariff Schedulehttps://hts.usitc.gov/Reference only (export-route HS)
UK duty lookupUK Global Tariffhttps://www.trade-tariff.service.gov.uk/Reference only
Japan duty lookupJapan Customs (English)https://www.customs.go.jp/english/Reference only
Australia duty lookupAustralian Border Force — Tariff classification — Current tariffhttps://www.abf.gov.au/importing-exporting-and-manufacturing/tariff-classification/current-tariffReference only
South Africa duty lookupSouth African Revenue Service — Customs and Excise Tariffhttps://www.sars.gov.za/customs-and-excise/tariff/Reference only
Ghana duty lookupGhana Revenue Authorityhttps://gra.gov.gh/Reference only
Uganda duty lookupUganda Revenue Authorityhttps://www.ura.go.ug/Reference only
US trade & CBPUS Customs and Border Protectionhttps://www.cbp.gov/Reference only
US trade promotionUS International Trade Administrationhttps://www.trade.gov/Reference only
Market data (general)International Energy Agencyhttps://www.iea.org/Reference only
EV charging protocol (if e-mobility added later)Open Charge Alliance (OCPP)https://www.openchargealliance.org/Reference only (out of scope)
PV module OEM (LONGi)LONGi Green Energy Technology Co., Ltd. — Hi-MO 9 product pagehttps://www.longi.com/en/products/modules/hi-mo-9/Equipment identification
PV module OEM (Jinko)JinkoSolar Tiger Neo 3.0 datasheet (PDF)https://jinkosolarcdn.shwebspace.com/uploads/Tiger%20Neo%203.0%20Flyer.pdfEquipment identification
PV module OEM (Trina)Trina Solar product cataloguehttps://www.trinasolar.com/us-enEquipment identification (alternate)
PV module OEM (Canadian Solar)Canadian Solar TopHiKu6https://www.canadiansolar.com/na/tophiku6/Equipment identification (alternate)
String inverter OEM (Sungrow)Sungrow string inverter rangehttps://www.sungrowpower.com/en/products/string-inverterEquipment identification
String inverter OEM (Huawei)Huawei FusionSolarhttps://solar.huawei.com/enEquipment identification
String inverter OEM (SMA, alt.)SMA Sunny Tripower CORE1https://www.sma-america.com/products/solarinverters/sunny-tripower-core1Equipment identification (alternate)
String inverter OEM (Growatt)Growatt product cataloguehttps://www.growatt.com/Equipment identification (alternate)
Mounting OEM (K2 Systems)K2 Systems S-Dome / N-Rack product rangehttps://k2-systems.com/en/Equipment identification
Mounting OEM (K2 Systems ground mount)K2 Systems N-Rack ground-mount systemhttps://k2-systems.com/en/product-solutions/k2-n-rack-system/Equipment identification (ground-mount)
EV-conductive charging standard (not in scope)IEC 61851-1:2017 — Electric vehicle conductive charging system, Part 1: General requirements (TC 69)https://webstore.iec.ch/en/publication/33644Reference only
Stationary battery standard (not in scope)UL 1973 — Batteries for Use in Stationary and Motive Auxiliary Power Applicationshttps://www.shopulstandards.com/ProductDetail.aspx?productid=UL1973Reference only
PV module safety (UL)UL 61730-1 — Photovoltaic (PV) Module Safety Qualification — Part 1https://www.shopulstandards.com/ProductDetail.aspx?productId=UL61730-1Standards reference
PV module qualification (IEC)IEC 61215-1:2021 ed2 — Terrestrial PV modules, design qualification and type approval, Part 1: Test requirements (TC 82)https://webstore.iec.ch/en/publication/61345Standards reference
PCE (inverter) safety (IEC)IEC 62109-1:2010 — Safety of power converters for use in PV power systems, Part 1: General requirements (TC 82)https://webstore.iec.ch/en/publication/6470Standards reference

All other named organisations in this page (MNRE Solar Energy Statistics 2023, CEA industrial-demand narrative, RBI CPI/WACC narrative, ALMM portal) are referenced for context only; the computed financial figures in Sections 4 and 5 do not depend on any single named statistic.

9. Call to Action

Request a quotation (RFQ) for a 2 MWp textile-mill solar project in India

After submitting the RFQ, a TradVolt sourcing specialist will lock the OEM model, manual revision, torque/SOC/voltage limits, ALMM status, and applicable HS-code duty rate (via Indian Customs ICEGATE and CBIC) before purchase order release.

Supporting asset: textile-solar-2mwp-in-r9-tco-200.csv (year-by-year cash flow).