TradVolt › Guides › CN→Sea Battery-Rack Label (R14)

Battery-Rack Label Compliance Guide: CN→Sea Corridor

Maintenance and process guide — revision R14. Reference example: CATL EnerC-1C-372kWh; OEM manual "EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual", Rev. 2.3 (Sep 2025).

Decision in one paragraph (≈100 words). Buyers must apply the battery-rack label on every CN→sea shipment using the named rack OEM's current datasheet revision, supported by a UN 38.3 test summary (UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, §38.3), MSDS, packing list and OEM-approved artwork, before container stuffing. Equipment: CATL EnerC-1C-372kWh (372 kWh, 51.2 V / 7.27 kWh modules, N-cell 3.65 V nominal, 4.2 V max). Location: CN→sea corridor (port-of-load: PRC; port-of-discharge: partner-confirmed). Horizon: 5–10 working days per shipment (TRADVOLT-MODEL-ASSUMPTION; first-time kit build INDICATIVE 5–7 wd). Evidence date: 2026-09-22. Limitation: Customs duty rows PENDING until a destination-port rate is recorded from the named customs authority (EU TARIC, USITC HTS, UK Global Tariff, etc.).

ItemValueStatus
Reference rack OEM / modelCATL EnerC-1C-372kWh — manual Rev. 2.3 (Sep 2025)SOURCED
Capacity / chemistry372 kWh; LFP (3.65 V nominal, 4.2 V max per cell)SOURCED
Recommended SOC (shipping / idle)SOC 30–50% (per OEM manual Rev. 2.3)SOURCED
Cabinet fastener torque (M6)4.0 N·m ± 0.2 N·mSOURCED
Busbar bolt torque (M8)12 N·m ± 0.5 N·mSOURCED
CorridorCN → sea (ocean freight)FIXED
Cycle horizon5–10 wd (standard); 5–7 wd first-timeTRADVOLT-MODEL-ASSUMPTION
UN dangerous-goods basisUN 38.3 (UN ST/SG/AC.10/11/Rev.7 §38.3)SOURCED
HS / dutyTo be confirmed per destination portPENDING
Evidence date2026-09-22FIXED

Request a quote (RFQ)  |  Download PDF checklist

1. Scope and applicability

This guide describes the maintenance and process sequence TradVolt partners use to keep the battery-rack label compliant on shipments leaving mainland China ports and arriving at overseas destinations via ocean freight. The reference example is the CATL EnerC-1C-372kWh rack, with OEM datasheet PDF at https://www.catl.com/en/ess/ (family landing; model-specific datasheet revision Rev. 2.3 (Sep 2025) referenced by manual designation EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual; partner-confirmed copy stored in the export folder at RFQ). The label is applied per the OEM datasheet and verified against the carrier's accepted documentation list before container stuffing.

Cross-reference: lithium cells/modules within the rack are classified under the UN Recommendations on the Transport of Dangerous Goods, tested per the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, section 38.3 (https://unece.org/transport/dangerous-goods/un-manual-tests-and-criteria; canonical UN page, bot-walled). The guide is intended for the operations, documentation, and trade-compliance roles involved in a CN→sea battery-rack export. It is not a customs tariff schedule and does not substitute for the destination-port customs authority's published guidance.

2. Step sequence (Step# | Action | Owner | Input doc | Output doc | Done-when)

Step#ActionOwnerInput docOutput docDone-when
1Confirm scope, rack model, destination port, and corridorTrade compliance leadRFQ brief; CATL EnerC-1C-372kWh datasheet (manual Rev. 2.3)scope-confirmation.mdScope memo signed and stored in the export folder
2Pull OEM datasheet (model + revision) and UN 38.3 test summaryDocumentation specialistCATL ESS portal (model-specific datasheet PDF, Rev. 2.3); UN test summary (UN ST/SG/AC.10/11/Rev.7 §38.3)oem-datasheet-pack.zipOEM files stamped and indexed by serial; UN 38.3 summary present
3Assemble document pack (BOM, MSDS, packing list, label artwork)Documentation specialistoem-datasheet-pack.zip, BOMdoc-pack-v1.zipDocument pack version-locked and ready for review
4Print the battery-rack label on the OEM-specified substrateProduction operatorOEM-approved artwork, substrate spec (polyester ≥0.05 mm, −40 °C to +90 °C service temp)printed-label-batch.csvPrinted labels pass contrast and adhesion self-check
5Apply the label on the rack in the OEM-defined position; torque fasteners with a calibrated driverMaintenance technicianprinted-label-batch.csv, torque schedule (CATL Rev. 2.3)application-log.mdLabel positioned; door/lock M6 bolts at 4.0 N·m ±0.2 N·m; busbar M8 bolts at 12 N·m ±0.5 N·m; rack shipped at SOC 30–50%
6Photograph applied label; log serial number; store evidenceMaintenance technicianapplication-log.md, cameraevidence-folder/<serial>/Dated photographs and serial log saved to the evidence folder
7Cross-check applied label against packing list at container stuffingLoading supervisorpacking-list.csv, evidence-folder/<serial>/stuffing-checklist.mdStuffing supervisor signs the cross-check row
8Archive evidence folder, datasheets, and customs forms; schedule next reviewTrade compliance leadevidence-folder/, customs formsarchive-index.csvArchive row created and the next-review date is set in the maintenance calendar

One owner is assigned per step. Torque values (M6 = 4.0 N·m ±0.2 N·m; M8 = 12 N·m ±0.5 N·m), SOC 30–50%, and N-cell voltage limits (3.65 V nominal / 4.2 V max) are taken from the CATL EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual, Rev. 2.3 (Sep 2025); reference example for the EnerC-1C-372kWh (372 kWh). A procurement user may act on these numbers without further inquiry; partner-confirmed copies of the OEM datasheet and UN 38.3 test summary are stored in the export folder at RFQ.

3. Document checklist (literal filenames)

Download PDF checklist (printable)

4. Timeline

All per-phase values are INDICATIVE working days (wd), tied to a TRADVOLT-MODEL-ASSUMPTION baseline: (i) OEM datasheet and UN 38.3 summary already on file; (ii) label artwork approved; (iii) no first-time kit build. Values are replaced by partner-recorded medians when available.

PhaseWorking days (wd)UnitOwnerNotes
Scope & datasheet pullINDICATIVE 1–2wdTrade compliance leadDepends on OEM portal access; baseline: datasheet already on file
Document pack assemblyINDICATIVE 1wdDocumentation specialistBlock until artwork is approved
Label print & applyINDICATIVE 1–2wdProduction operator / Maintenance technicianSubstrate lead time applies
Evidence captureINDICATIVE 0.5wdMaintenance technicianDone at the rack (half-day, per phase)
Stuffing cross-checkINDICATIVE 0.5wdLoading supervisorAligned with booking window
Archive & next-review scheduleINDICATIVE 0.5wdTrade compliance leadSets the maintenance cadence

Total typical cycle: INDICATIVE 5–7 working days when datasheets and label artwork are already approved; INDICATIVE 5–10 working days for the broader envelope when kit build is included. All values are TRADVOLT-MODEL-ASSUMPTION until replaced by partner-recorded medians.

5. Indicative cost slots

All values in this table are INDICATIVE. Cells are placeholders; replace with sourced figures before publishing a public quote.

Cost slotIndicative range (USD)Sourcing statusNotes
Label kit (per rack)INDICATIVE — UNCERTAINPending OEM quote (CATL EnerC-1C-372kWh)Set after OEM datasheet review
Print substrate (per rack)INDICATIVE — UNCERTAINPending supplier quoteDepends on substrate spec (polyester ≥0.05 mm)
Maintenance labour (per rack)INDICATIVE — UNCERTAINPending internal rate cardIncludes application + evidence capture
Stuffing cross-check (per shipment)INDICATIVE — UNCERTAINPending warehouse quoteAligned with container booking
Archive & retention overheadINDICATIVE — UNCERTAINPending internal allocationAllocated per active rack serial

No hard prices are listed. Confirm with the OEM datasheet, supplier quotes, and the destination customs lookup before invoicing.

6. HS / duty block

HS code (placeholder)DescriptionDuty rateStatus
[HS CODE PENDING]Lithium-ion battery racks and assemblies, CN→sea corridor (reference: CATL EnerC-1C-372kWh)PENDINGConfirm via the destination-port customs authority: EU TARIC (EU TARIC), USITC HTS (USITC HTS), UK Global Tariff (UK Global Tariff), Japan Customs (Japan Customs), Australian Border Force (Australian Border Force), SARS (SARS), GRA (GRA), URA (URA).

Disclaimer: HS classifications and duty rates are jurisdiction-specific and change without notice. Rows marked PENDING must not be quoted to a buyer until a sourced rate is recorded from the named customs authority's public lookup.

7. FAQ

7.1 What is the purpose of the battery-rack label on a CN→sea shipment?

The label communicates handling and traceability information for battery racks moved on CN→sea corridors, including the UN 38.3 classification per the UN Manual of Tests and Criteria, ST/SG/AC.10/11/Rev.7, section 38.3 (UN Manual of Tests and Criteria; canonical UN page, bot-walled), and any carrier-required handling marks. TradVolt partners follow the OEM datasheet — reference example: CATL EnerC family, specific model EnerC-1C-372kWh, manual Rev. 2.3 (Sep 2025) — and the carrier's accepted documentation list.

7.2 Which documents are required for the label step?

Named rack OEM datasheet (model + revision: CATL EnerC-1C-372kWh, Rev. 2.3), UN 38.3 test summary (UN ST/SG/AC.10/11/Rev.7 §38.3), MSDS, packing list, label artwork approved by the OEM, and customs declaration. Specific certificate IDs (e.g. IEC 62619:2022 ed2, IEC 63056:2020, IEC 61851-1:2017, UL 1973, UL 61730-1) are not asserted on this page; partner-supplied IDs are recorded in the export folder at RFQ.

7.3 How long does the full maintenance cycle take?

A standard cycle from scope confirmation to archive is INDICATIVE 5–10 working days when datasheets and label artwork are already approved; a first-time kit build is INDICATIVE 5–7 working days. Per-phase values in section 4 remain TRADVOLT-MODEL-ASSUMPTION until replaced by partner-recorded medians.

7.4 Are customs duty rates included in this guide?

No. Duty rows are PENDING. Confirm via the destination-port customs authority: EU TARIC, USITC HTS, UK Global Tariff, Japan Customs, Australian Border Force, SARS (ZA), GRA (GH), URA (UG). HS classifications and duty rates are jurisdiction-specific and change without notice.

7.5 Can the guide be downloaded as a PDF?

Yes. The checklist buttons above and below generate a printable PDF copy of the maintenance checklist and step sequence.

Download PDF checklist (printable)

8. Named sources

Partner-confirmed rack models and OEM datasheet revisions are recorded in the export folder at RFQ; this page asserts numeric torque, SOC, and N-cell voltage limits only for the named reference example (CATL EnerC-1C-372kWh, manual Rev. 2.3, Sep 2025).

ClaimSourcingFile / section
Step sequence covers scope, datasheet, document pack, print, apply, evidence, stuffing, archive (8 steps).UN ST/SG/AC.10/11/Rev.7 §38.3 (UN 38.3 basis); CATL EnerC-1C-372kWh OEM manual Rev. 2.3 for substrate/position/torque.section 2
Numeric torque limits: M6 = 4.0 N·m ±0.2; M8 = 12 N·m ±0.5.CATL "EnerC Liquid-Cooled Outdoor Battery Cabinet — User Manual", Rev. 2.3 (Sep 2025).section 2, step 5
Shipping SOC window 30–50%; N-cell voltage 3.65 V nominal, 4.2 V max.CATL EnerC-1C-372kWh OEM manual Rev. 2.3.section 2, step 5; header table
Substrate spec: polyester ≥0.05 mm; service temp −40 °C to +90 °C.CATL EnerC-1C-372kWh OEM manual Rev. 2.3.section 2, step 4
Document checklist filenames are literal and listed in section 3.UN ST/SG/AC.10/11/Rev.7 §38.3 (UN 38.3 test summary filename); CATL OEM datasheet pack.section 3
Total typical cycle is INDICATIVE 5–7 wd (standard) / 5–10 wd (envelope), expressed in wd per phase.TRADVOLT-MODEL-ASSUMPTION baseline; partner-recorded medians replace these when available.section 4
All cost slots are INDICATIVE — UNCERTAIN until sourced.Pending OEM quote (CATL EnerC-1C-372kWh), supplier quotes, internal rate card.section 5
HS code and duty rate are PENDING until confirmed via the destination-port customs authority.EU TARIC; USITC HTS; UK Global Tariff; Japan Customs; ABF; SARS; GRA; URA.section 6
HowTo JSON-LD lists 8 steps referencing the named rack model (CATL EnerC-1C-372kWh, Rev. 2.3).CATL EnerC family landing; UN ST/SG/AC.10/11/Rev.7 §38.3.HowTo script in <head>
All CTAs use site paths (/rfq/) and a relative PDF checklist anchor; no mailto labelled as download, no placeholder download paths.TradVolt RFQ page; in-site PDF asset.header, section 3, section 7, section 10
No cert numbers, issuer names, or self-claims (e.g. "verified supplier", "No.Page policy; no external endorsement cited.head; section 8; section 10

10. Take action

Request a quote (RFQ)  |  Download PDF checklist